Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 10/01/18 in Posts

  1. Not on my bloody site there’s not as the seasons start to change I thought I would add my opinion on mud on site nope don’t want it, your trades will walk it through your new house, their van will drag it down the road, and it makes for an unhappy environment to work in. When I did the site scrape I extended it for 5-6 m in all directions from the hose footprint, I removed all topsoil and replaced it with recycled crushed hardcore and a blinding of local stone, the cost was 3 truckloads of crushed at £145 per load and 1load of stone at £165 the outcome is priceless not a drop of crud anywhere.
    3 points
  2. Just a silly topic if anybody is having to do this sort of thing themselves i had 16 tonnes of concrete floor beams to put in place at a distance of 15m from where we could get the closest lifting equipment, answer don’t build the front wall of the house and drive the forklift inside the house working your way out until all beams in place, once all in place finish off the last bit of wall. Pic one the forklift sitting in the back bedroom, pic 2 halfway, pic 3 just exiting the garage. All done.
    2 points
  3. We have used exterior Osmo oil with the oak stain as we did not want the cedar to silver. We used the clear osmo to start with but found out it doesn't have great UV protection. The cedar started to lose its colour & grey quite quickly. The new stain looks good & is showing no signs of weathering yet. We tried the other colours available but the oak was nearest to the original colour of the cedar. As it is translucent it there is still a variation between the cedar planks. The cedar stain is too orangey red. I would get a sample sachet & try it in a discreet place.
    2 points
  4. Every night's a school night! Well it is for me, learning as I tile. I think @Nickfromwales referred to the importance of avoiding "rips" I think he called them, thin strips of tiles that look awkward and unplanned. Well I managed it! I've ended up with a nom 40mm strip up by the ceiling. I was going to cut the mosaics down in strips to say the 30mm width of the squares? It'd mean a 5mm grout line either side. Or cut it down to 35mm keeping the pseudo grout line. Then put that against the ceiling and grout as normal between the main tiles and mosaics. Thoughts? Cheers.
    2 points
  5. Judge (G)Rinder?
    2 points
  6. My recommendation with these sort of events (something turning out an unexpected shade etc..) is to leave it for a few months and then see if you still notice or care. Very tempting to try and fix it in the moment when you're focused on it ....
    2 points
  7. Sell now get money in the bank = fewer middle class clipboard huggers stealing your money. Conversely consider family relation dynamics should your build take an extra year. At some point your parents will revert to treating you like a teenager again which could be as stressful as self building. My advice is build a weather tight house for less than £200k, move in then finish off incrementally without a mortgage.
    2 points
  8. Russel, this topic isn't silly. It would have taken me ages to work out the logistics of how to solve your problem. And everyone who reads your post will use it as a starting point for their own thinking. In other words, stand on your shoulders. Keep them coming. You can never know what readers will make of your posts.
    2 points
  9. @epsilonGreedy I'm usually the last to comment on these posts but you should reflect before you press the submit button. Yellow card time is looming I'd guess...
    1 point
  10. Now which publication is that from? looks like your gonna tile all over her back....
    1 point
  11. Looks fine to me but your the one who has to live with it. Just be aware that if you overpaint with a lighter colour it’s going to need a few coats. I know as I did the same thing but in brown Cuprinol ducks back. In the end I really liked the two tone colour and am repainting my whole massive shed with another two coats light brown first and then dark brown (4 in total !) I got the paint of amazon for £10 per 5 litres so decided to go crazy !
    1 point
  12. Been using something similar but even thinner..... It’s just like a hack saw cut. Great find. The ones Peter recommends look even better, will order some when I run out.
    1 point
  13. it looks OK to me TBH.
    1 point
  14. B Like cutting butter dont forget your goggles as they do shatter
    1 point
  15. Not my experience at all. Ours can heat to 50C regardless of outside temperature. Sunamp for storage is a separate subject, 50C is too low for the regular PCM, and the 34C PCM is not hot enough for DHW. We use a 300l cylinder, the only downside is that recovery time is slow with our small heat pump.
    1 point
  16. Seems right, I get around 4 when heating and 3 when cooling.
    1 point
  17. I used these for the first time about six moths ago I couldn’t believe how something so flimsy looking would cut through steel like butter
    1 point
  18. You have not answered my question - but don't bother. Your evasiveness says it all. You didn't need to explain the principle behind the basis of your original comment; it's the manner in which you deliver your comments time and time again - you have an issue, you know you do hence the deflection and you don't like that you were called out on it. Across your posts it is clear you don't like that many people on this forum can afford things you cannot - you are obviously doing your best in this self-build world, but due to the nature of this type of endeavour it takes a fair bit of money, even if just secured finance, to build a home that most people could only dream of.
    1 point
  19. It's spelled "Grindr" isn't it?
    1 point
  20. Practice may be slightly different but probably not much different: in theory the cooling COP should be one less than the heating COP because the energy in the electricity going into the pump contributes to the heating but not to the cooling. I = thermal energy going into the heat pump (from outside when heating, from the house when cooling). What matters when cooling. O = thermal energy coming out of the heat pump (to the house when heating, to the outside when cooling). What matters when heating. E = electrical energy going into the heat pump. Assuming no other losses then O = I + E. Cooling COP = I/E. Heating COP = O/E = (I + E)/E = I/E + E/E = I/E + 1 = cooling COP + 1.
    1 point
  21. My ASHP is heating my DHW to 47 degrees. This was found by experiment over a few days to be the absolute hottest I could hold my hand under without it being painful. Hot enough for washing up. Bathwater will be cooler with cold water added. So an ASHP seems perfectly capable of heating DHW. The caveat being I fitted a larger hot water cylider as you will be diluting with less cold, so will need a greater volume of hot water.
    1 point
  22. You've hit the nail on the head there. Exactly our problem. Coming from gas previously or even the current oil system we love a hot steamy bath and hot water. We are what you'd say 'nesh' and I, coming from my parents who have an aga and continually heated house, every house I've ever lived in since hasn't t had the constant heat I was brought up witj. We are typical 'always cold' people and I love a nice hot steamy bath and don't know if the system will do this, but then I'm not convinced an Ashp will either, but we do know we want underfloor heating throughout, my brother has it and I love it. This technology is without anything else such as solar etc, obviously we need to get some figures and go from there and compare with Ashp.
    1 point
  23. Thanks for this, I have indeed. I have had a lot of if formation on the blades from the ISO website already, https://www.isoenergy.co.uk/latest-news/isoenergy-news/cutting-costs-with-the-energy-blade-heat-collector Nuenta is the supplier of the blades. The information on the podcast was really helpful and made me more keen to explore it. It's ironic hydro has been mentioned @ProDave as this was something I initially explored, BUT the cost was likely to be huge. The red tape is very, very complex. Planning permission, abstraction licences, fish things and major environmental agency permissions all make this a non-starter. In addition, whilst the flow is sufficient, we don't have the drop at all. Our property is adjacent to the canal and the bywash is on our side (see pic). Now water source closed loop like the blade, no planning permission, no abstraction licence, very little red tape as long as the c&r trust are on board.
    1 point
  24. I think the point I was trying to make and obviously failing is I’ve heard day rates and half day rates quoted as little as £120 per day Even for a sole trader running a van and tools holidays etc is very low and I hear folk paying around £40 per mtr for floor tiling I’ve started a job this morning and have laid about 20 mtrs so far at £30 per mtr grouted and covered Three of us will easily complete 50 mtrs per day for the duration of this job As I have pointed out previously there are massive differences between the site operatives and the bottom feeders that most have to make do with on self builds The small builders are struggling for labour I'm in the north of England so not the lowest but certainly not the highest wages Redrowand others are guaranteeing bricklayer 220 per day rain or shine I’m not taking any more work on till after Easter We hear so many tales of woe on here so let’s go into it with our eyes open Make no mistake it’s a bad time to selfbuild Building has always been boom or bust If things were tight on-site we would have a pool of eager and well qualified tradesmen looking to earn some extra cash Instead the jobbers have a clear run at all the private work 12 editions definitely does not make a best seller
    1 point
  25. I have visited the author in his recently finished new house in Cambridge. The house is designed by a top (and very expensive) architect, has a fabric-first approach, and looks splendid. A frivolity he was keen to show off was a 3-metre powered opening glass roof panel.
    1 point
  26. Those discs that PeterW has suggested will cut much better as they are much thinner - be careful when cutting anything galvanised, it is toxic.
    1 point
  27. I think it looks good, a lighter colour would contrast / stand out more. Like a lot of others have said, its bound to fade to a lighter colour.
    1 point
  28. Use a pencil and draw it out on the wall. You don't want to end up with tiny bits of tiles. Start with the obvious, a full tile and then a half above and see how the cuts work. Then try a 3/4 and a 1/4. It's just trail and error to see what works best.
    1 point
  29. I think that is the wrong answer ?, particularly as your 2 years in the howling Scottish salt-laden eviscerating gales is equivalent to about 10 in the gentle Shires of the South. In a minute you'll tell us you used the same paint !
    1 point
  30. Mine is hit and miss too so I can appreciate how long it took ?. We must both be hit and miss with the colour choice too as I don’t really like mine. Dried much more orange than I expected, but as per some comments above after 2 years I don’t care much. And it hasn’t faded either lol.
    1 point
  31. I think the colour contrasts nicely against the red brick and coping stones. Warship grey would suit a corporate HQ.
    1 point
  32. There you go then, see how you feel about it in 5 years
    1 point
  33. It will mellow / fade fairly quickly. Are you going to do the edges too?
    1 point
  34. Colour isn't too bad. I would leave it and see if it fades. Paint it light next time. On sawn timber I prefer wood stains (Ronseal etc) which I spray with a cheap hoselock pump up garden sprayer. It ruins the sprayer but the small ones aren't much more expensive than several good brushes.
    1 point
  35. Our stats have been off all summer but this weekend we decided to turn on the bathroom and living room stats they could call for heat if needed. They both came on first thing today so it must have been below 18C in the living room overnight.
    1 point
  36. Smoke may well be being drawn upwards as is air - through the wadding. Sealing the bottom means all the “draw” is through the stove, when it’s hot there will be significant draw from the chimney, when it’s not you’re reliant on the stack effect and the breeze over the top to make it draw and opening the door may mean the pressure is just too low as the wadding is not sufficient. Bear in mind that a register plate is the correct installation method and what you have would not pass building regs or a Hetas inspection.
    1 point
  37. I call it having my finger on the contemporary pulse of British life. Economic prospects for the under 40's have not looked so dismal for 50 years, polarization of wealth is an undeniable global economic trend and home ownership rates for the young are plummeting. A self builder needs to question every expenditure that does not materially contribute to the build and short term mortgage finance is going to be such an example once fees are taken into account.
    1 point
  38. I can't really comment on this one, as my preferred approach to painted fences is "don't, without a really good reason".
    1 point
  39. @Ferdinand yes that marked part is part of the plot, as well as another garden area to the east, also a decent curtilage around the whole building to allow for maintenance. Various covenants in place with the farm for access, services, etc. The woodland 'just out of shot' to the left of that model picture is under a long-term woodland management grant, and the whole area is green belt, so in the event of everything changing hands in years to come, the new owners shouldn't have to worry about their north view being onto an abattoir. Class Q has been a bit tricky, but on a firmer footing with the recent updates about structure. Martin Goodall's blog has been essential. The planners are (now) happy with the design, and I think we've got a good relationship with the planning dept. Further amendments to include stainless steel cladding might be a step too far though. If it's ever of interest to anyone, the GPDO does explicitly allow making design amendments to a previous class Q agricultural conversion PD, though councils may not initially know this is possible.
    1 point
  40. In the most recent Passivhaus Trust newsletter (link below) is a link to this document, "Good Practice Guide, MVHR for single dwellings". Its a detailed description of how to design an MVHR system for a Passive House. The guide: http://passivhaustrust.org.uk/UserFiles/File/Technical Papers/2018 MVHR Good Practice Guide rev 1.2(1).pdf The newsletter: https://mailchi.mp/passivhaustrust/pht-news-sept-18?e=894c841f59
    1 point
  41. Just found out why the Salus motorised UFH actuator works so well on our system. The headline temperature differential that it tries to maintain between flow and return is 7 deg C, which is higher than the differential we see on our system, and something I'd just put down to manufacturing tolerances. I've just read the detailed technical stuff on this actuator and it seems that it reduces the temperature differential that it tries to maintain to 4 deg C when the flow temperature is below 30 deg C. That's just about perfect for our needs, and explains why it works better than I thought it would. The main reason I fitted it was because it has a much faster actuation time than the thermal actuators. It's a real bonus to find that it also does such a good job of controlling a low power UFH system.
    1 point
  42. Indeed I have many lights imported from China all up and running and working nicely. In fairness to @JSHarris though most of these are simple ceiling light fittings. The LED bulbs I bought here. There is a lot less to go wrong on an indoor ceiling fitting, you can see straight away if it is wired up correctly. In the past when I have bought cheap sealed unit PIR LEDs from EBAY they have proven pretty unreliable. All our GU10 LEDs and LED strips were from UK suppliers The lights in our hall do have integrated LEDs and drivers and they were the only lights we had trouble with. They had the option of wireless dimming, that I chose. They didn't work properly until we removed the wireless dimmers, it seemed like multiple units on the same circuit interfered with each other. All the pendant fittings in these pictures came from China via Aliexpress. We have more that I could not find pictures of. Generally they were 1/3-1/4 of buying them locally. The other benefit was that as you were dealing with the manufacturer I was able to ask for adjustments to be made, e.g. the light against the brick wall background, they made it longer as it went into a double height room. People were very responsive to emails and it all worked as easily as any supplier I have worked with here, often easier.
    1 point
This leaderboard is set to London/GMT+01:00
×
×
  • Create New...