Everything posted by Gus Potter

  1. Hi Puntloos. That living room is a chunk of space. Here are my thoughts on the layout you have provided. Much of this is SE related but I hope it gives you some pointers. You have a pretty clear main rear elevation. If you look at the right side of the drawing you have a small return on the masonry, then a pier between W-05 and D-03, the access to the dining area and a long wall up the left side of the drawing. SE wise this flags up how to stop the building moving from side to side in the plane of the rear elevation. Call this lateral stability. Next you have this masonry pier between the two doors in the living room. Now, to make first floor economic over the living room it makes sense to span the joists from the internal masonry wall to the rear elevation. But in doing so you are going to add a lot of load to the pier as some of the first floor load will be carried by the lintels over the doors D-03 and W-05. You may well have some roof loads too and the weight of the second storey walls on the lintels. From an SE view that pier is one of the key elements and I would have my doubts about the capacity of it. Another thing that flags up is the length of the masonry wall on the left of the drawing. There are some stability issues here (as it looks like a long wall) and also at this size of house you'll need to detail and position the movement joints in the masonry to stop cracking. Good for cracking but not so good for strength as you introduce a discontinuity (weak spot) in the masonry which needs to be dealt with. In summary there looks like a lack of "meat" in the masonry in terms of lateral stability and the pier capacity to carry the vertical loads. It could all turn complicated and nasty (expensive to build)) when you get down to the detailed calcs. In SE terms there are a number of ways to design this but here are two concepts. Based on the drawing above. Concept 1. In a couple of places you introduce two flat steel portal frames ie a double goal post. I would do these in the living room rear elevation as this keeps a clean line along the left elevation wall. These goal posts stop the building from moving sideways while also carrying the load from above. As an aside this would let you muck about with the door widths in the living room.. they may look good being symmetric? Before progressing you maybe want to have a look at your budget and just how much you are able to spend on the acoustics. Maybe a reasonable compromise is in order here? If you still want the full monty then I would look at a structural steel deck. Have a look at Kingspan Multi Deck for ideas. Here you get loads of mass for acoustics, fire protection. Also they are great for generating what we call "diaphragm action". Option 2. To explain "diaphragm action" in laymans terms. Imagine you get two carboard boxes and tape up all the sides. Put one on top of the other and tape them together. Now cut out the face (your living room doors) of the bottom box and tape the whole lot down to the kitchen worktop. Push it perpendicular to the cut door openings. just like your big living room doors. Look closely and you will see it stays up. The reason for this is that the uncut "gable" sides act to stabalise the boxes. The gables act in what we call "complimentary" shear, the uncut bottom wall of the box acts as a traditional "shear wall"... that would be your wall between the living room and the rooms at the bottom of the drawing. Once you get a handle on the carboard boxes you could maybe use the metal deck as a diaphragm to transfer the shear loads to the wall at the bottom of the drawing and this wall will work with the gable walls... that is option 2 but the masonry will probably need to be 140 ~ 215 mm thick at least... looks like 215mm on your drawing anyway. I hope this helps. Once you get a feel for how the thing stays up then you are well on your way. I would look to see if you can make you floors a bit thinner over all, add ceiling height thus value to the property. If you are building flats say and can make the floors thinner then at some point you can get an extra storey in while keeping the planners happy! Big bucks if in London. The same may apply to you but on a smaller scale. Although I started out with an SE view hopefully this has a spin off on how you can go about getting the best for your money. Lastly, all the best Puntloos.. the main thing is to keep asking questions, mull it over and enjoy the journey. Often you need to work out what you don't want as this helps narrow things down. Oh and it's worth a punt doing the box thing as it may get the kids interested, engaged and consider exploring Engineering as a career. But if not you could alway propose they invest in the build (a cut in the pocket money) if they want to upgrade the acoustics in their own room?
  2. Hi Dragster. You may be over thinking this. Often a standard perimeter edge insulation for a slab is say 25mm thick. If you want you could increase the slab edge insulation to just behind the inner face of the finished plasteboard. Use a good quality say PIR insulation.. looks like you could get 75mm in here. Yes, you may get a little reduced performance but you will face structural issues on how you tie the kit down. Keep it simple and decouple the kit from the slab structurally and insultaion wise. Simplify the design, thus make savings which will allow you to offset any percieved reduced performance at the slab kit interface elsewhere.
  3. Hi Punloos. It is the depth of the 150mm beams that flagged at my end. Below is a screen shot from the Millbank load span tables. Your imposed load for a domestic floor is 1.5kN/m^2. Beams of this depth are fairly sensitive to deflection, vibration so that made me wonder. Also, as you have plenty floor depth to work with I wondered why the beams were so shallow in depth. Just to get a feel for this you can see that a 150mm beam will give you a rough span of 3.5m (11 -12 feet), you may be able to squeeze a bit more if you reduce the dead load (srceed etc).. but at conceptual stage you don't want to be cutting things too fine as you have to deal with service openings, stair wells maybe and the odd point load. Your starting point here is to look at the largest span you have, that may be in a big open plan area. Next look at the most common span.. say the main bedrooms. Then for beam and block look at what depth of beam will suit most rooms. Off the back of that you can develop up your sound insulation and any fire protection. Next have a look at how you deal with the large span and how you may detail / design this. You also want to have a look at the walls and found construction just to check you have not backed the wrong horse in terms of capacity to support the loads, thermal bridging and acoustic detailing. @Thorfun"True, or just maybe wrap the sound insulating material around the kid rather than in the floor? " Love to see you exploring all the design options.
  4. Yes keep it inside. Actually, if you take your time and condition it then you'll get a dividend as it will tend to move less once installed. Follow Temps advise. If it was me I would also every 2-3 weeks turn the planks. Here you start at the top of the pile. Take the first plank off the top outer edge of the pile, turn it so the bottom is now on the top and place it on a good thick spacer where you think the middle of the new timber stack will be. Keep it well clear of the floor, lets the air in. The idea here is that you are taking the timber from the ouside of the stack and placing it in the middle and at the bottom where the weight of the stuff above helps gently keep it more true . Also you are aiming to dry / condition the whole stack evenly thus the reason for moving the outer planks to the middle of the stack. As you do this, check it is being kept clean and so on. Lastly keep the timber spacers a bit long then cover the stack with something breatheable, say a dust sheet, not plastic. The longer spacers keep the sheet away from the timber. Leave a gap at the bottom to let the air flow freely. Every now and again check to see if you need to add a bit of ballast to the top of the stack. Be careful as Temp says about marking the timber with too much weight/ ballast. Depending on the plank thickness maybe look at spacers 600 - 900 mm apart.
  5. Hello David. Yes once I started writing it started to grow arms and legs! Again for simplicity I copy and past, respond in line. Please excuse my spelling grammer, I'm just jotting down my thoughts. Thank you for that detailed response. I gather then that the architect does add value by giving me insurance if something goes wrong with the contractor. Think about getting a formal contract in place here. Roughly: If your designer is supervising the workmanship, authorising the staged payments to the builder, that the work is up to scratch, the correct materials have been brought to site, looked after and installed correctly then they are generally liable for your money. It's a big ask hence the fee ~ 25% I mentioned earlier. Also, when you take on this professional role you have to wear a different hat. Many folk on BH employ Designers to bat for their side, say with the Planners. But when you manage/ supervise / sign off on a job you have to be fair and equitable to "The Client" and the "Contractor" Often there is conflict and this takes time and effort to manage these relationships..and that costs money, particularly as it's not that much fun to be in the middle of two sets of folk that often don't see eye to eye. If the builder goes bust and the designer has spent (signed off on) more of your money than they should have then they are liable for the differance. What they are not liable for example is the cost you may incurr if the builder does go bust and the new one charges you more, provided that the due dillegance financial checks have been carried out. Yes you often have a retention / you can get a bond et.. but you can see the cost of this is escalating. In summary if your designer gives you good advise, puts a good (industry recognised) contract in place and steps up to the plate liability wise then you get some protection. Given what you have posted it seems to me that your designer wants to have the fee with limited liability. Is it also fair to say if I find a good contractor to begin with the contractor would have skills to work around building control without the need of the architect. Yes they will but they will also work around you too so logic then dictates that they are not a good responsible contractor. If they are willing to con BC what stops them conning you? Do you think that just because you are paying the bill they will look after you.. they are there to make money! Maybe you won't get what you think you are paying for. Many of the building regs are really good, sensible, they keep us safe and maintain the value of our property when you sell on or borrow against it. You get a few folk bending the rules too far, even on BH! How I view it is if the Architect is recommending contractors that they have worked with before they must have had positive experiences with them in the past to continue using them. So if I go direct to the same contractors as the architect has used previously I should expect plain sailing ahead? No. Go out and get some independant quotes, if they are high / too low phone up the folk and ask why they are so high / low. Gather that info and go back to your Architect. Ask for an explanation. If you do this then you could win a watch by getting a builder via the Architect at a fair negotiated price. Don't try and go behind the Architect's back by going direct.. they will probably find you out within 24 hours and you will have lost any moral high ground. In fact the cost may go up as they may look at you as some chancer, of course forgetting any hypocrisy they may be indulging in themselves. Is it possible for me to purchase an off the shelf contract template that I could complete with the contractor cutting out the architect? Yes see link below for some pointers. https://www.jctltd.co.uk/product/building-contract-for-a-home-owner-occupier Also, see lots of advice on the internet... but at 120K you are taking a chance. I would put in a lot of work into your research on the risk / cost benefit. When first speaking with the architect I was given the RIBA plan of work. But I have not heard anything about CDM regulations. Ah.. have a look at the HSE website for home owners etc. As an overview as soon as an Architect / Designer steps into the world of supervision, tendering etc then they are well within the CDM regs. Your designer has made suggestions regarding selection of contractors.. by now they should be flagging this stuff up to you, a term " Principle Designer" is a key word with some paper work that explains how all this fits together. I think I would be more comfortable if I could negotiate with the architect the 12% fee @ a fixed £100k as that was the original budget. If my quotes come back at £130k I save the 12% on the £30k. I would take a step back here, get some independent quotes, post more questions on BH, maybe some drawings. Plenty folk here that know their stuff. BH is also poplulated by a fair handful of Contractors, Architects, SEs, experienced DIY folk that probably know what is a good price for your area. Lastly, hope this gives you some food for thought and helps you on your way.
  6. What about the doors to the room? If you have kids then they need the toilet and leave their bedroom door open, when we get a bit older we like to go to the bog as the bathroom window has the best view of the moon. The internal doors get opened and left so unless they are teenagers and never come out the room, so who cares if they hear what you are listening to? If you are entertaining then if your pals "like a drink" they too open doors, some will even leave the bog door open.. maybe best not to invite them back? Unless you are say a professional musician or are sensitive to noise (I'm pretty deaf) then I would make sure that if you are self building you don't get carried away with this level of internal sound insulation, the time (labour) and cost implications unless you have plenty cash. If you have that amount of cash you can afford a comprehensive redesign. Material prices etc are going through the roof at the moment. Many homes change.. you may have kids.. they go..but more than likely the noise from outside will increase over time and that could be something that you maybe want to future proof for? rather than the short term. Being blunt if you do come to sell then a buyer will be much more interested in what they can hear from outside rather than in between the rooms as you won't be having a party when you are selling the house. If it is a "forever home" then you maybe want to look long term.. maybe spend more on the envelope insulation, the quality of the roof and weathering details? In this climate as a renovator / self builder it may be worth just hedging your bets on the fabric that will add real easily measurable value. In other words the stuff a valuer will appreciate. Your big speakers.. maybe an extra fiver on the valuation. Do you have bifold doors? If so bet you have a lot of frame / vs glass area. For an extra say £ 1500 - 2000 quid you could get some true sliding doors (not the lift and slide type with the massive handle) with a 20 mm thick mullion.. you are as close to frameless glazing as you can get here.. value wise? each to their own but a buyer will appreciate maybe more than a bit of noise between the rooms?
  7. Hi David. I have copied you text in italic and comment in line. Hope this helps a bit and maybe others too. I am about to go out to tender on a revised house extension with a budget of roughly £120k which will include significant garden works. I have already paid the architect for full building control approval which has passed. The level of drawing detail for building control approval is often only sufficient for the purpose of obtaining approval and often falls short of the detail required from a full set of detailed construction drawings, call these the builder's working drawings. In Scotland for example I have seen council "warrant drawings" (~ BC drawings England) that just quote clauses in the regs to the effect that x has to comply with reg y. Gets the approval but unless you and the builder, know the regs and how to comply with them then..it's a lottery. I have arranged for the architect to "project manage the build", for which they charge 12% (10% + 2% VAT). No where do does the architect actually say that they will project manage the build. This all sounds a bit vague. Your Architect/ Designer should have explained to you the various options you have and outlined the standard forms of JCT contract for example that are suitable for a domestic 120k project. Below is a link that may help give some clarity and a few pointers to finding what suits you. https://www.jctltd.co.uk/product/building-contract-and-consultancy-agreement-for-a-home-owner-occupier What their job will involve will be being the go between between myself and the main contractor. Their role on site will be to make sure the contractor follows their plans correctly and uses the materials they have specified. They are missing the financial side of things and with their percentage fee do not have much motivation to help keep costs down. I have already spent a considerable sum with the architect especially with the changes I have made with the plans. As a rough rule of thumb if say you are doing an extension at 120k. I'm guessing David, but say you are taking the back off the house and extending.. so it's not just a big box built onto the back of the house ( bit more complex.. rewiring inside the old house and so on) then say ball park ~10 -12% for the Design and SE for the steel work other bits and bobs, and most importantly a good set of SE details. Now to do a full set of construction details, tender this on behalf of the Client, administer the contract (take care of your money, programme), supervise the quality of the work (old Clerk of works function), be on hand to jump to site to resolve technical issues, sign it off as ok, then you can double this to 25%. Now that is a chunk of the budget but in return you pass pretty much most of the liability to the Consultants who pick up the tab if it goes pear shaped.. When you buy a Mercedes with a ten year warranty / personal service consider how much that costs in real terms. There is a significant premium to this reassurance / reducing risk.. say the on board computer won't blow up? they don't blow sparks at most apparently.. they just stop working. My main worry is if I use the architect with their preferred contractors costs will spiral out of control. I feel the architect loves fancy projects and does not seem to pay much attention to actual costs. I had a set budget in mind but towards the end of the design stage the architect informed me that they thought the costs would exceed my budget. In the end I took the decision myself to reduce costs and did a large redesign for which the architect charged me £65 an hour. Your worry is justified. I would mull it over, then work out how to communicate your concerns to the Architect, phone them and back it up with an email. As a word of encouragement don't worry about not "knowing enough" , the law is pretty clear on this as you are a domestic client and it cuts you a bit more slack. I hope that your Architect has been a bit more forthcoming in the detail than your post description. If you want to explore more..then funnily this is much underpinned by the CDM regulations which are to do with safety, but this weaves into how you approach the type of dilemma you face. I get a bit of feedback from Architect's and Designers who are twigging that even when they at say stage 1 or 2 of the RIBA plan of work they are on the hook much more than they realise, and one way they are on the hook is by not communicating effectively with the Client in terms of making mention of the CDM regulations, how information is processed, clarity of / and the correct contract (the standard ones cover this) to ensure the job can be built safely and so on. I hope that this has been touched on and explained to you by your Architect but have not posted here for brevity. The CDM regs apply at concept design stage.. comments welcome. See link below for previous RIBA plan of work. https://www.google.com/search?client=firefox-b-d&q=RIBA+plan+of+work To sum above up, for the extra 10 - 12 % you should be getting all this information at the least, all spelt out in laymans terms. Having spoken with a friend who has had a recent bad experience with a builder they advised me to get a quantity surveyor on board to help keep costs down and for them to negotiate with contractors to make sure contractors were not taking the micky. They advised me to get the whole job priced up with the quantity surveyor before I put it out to tender. They also advised that I should try and lower my fees with the architect if I also bring on a quantity surveyor on board. I do not really want to be paying both an architect and a quantity surveyor as well as the high prices a main contractor is likely to charge. I am wondering what to do. Do I just ditch the architect altogether and get a quantity surveyor to project manage instead? Is there any likely hood the architect will agree to lowering their fees if responsibly is shared with a quantity surveyor? Can a quantity surveyor replace the architect at the build stage as they would likely have a lot of the architect skills but with the added benefit of knowing how much everything will cost. You have already paid your Architect a fee. You could give them a jolt once you have digested the info above. See what happens and get some clarity on what there are offering to do/ extent of liability before you spend more money on other professional fees. Hope this helps give you some food for thought.
  8. Hi Mac123. Ah, hind sight is part of life and an intrinsic part of the process. It is very rare that as a designer you sit back (cut yourself some slack Mac), look at the finished job, how it looks, how buildable it was and think.. I got that spot on design wise, at the best price and it was so buildable that we have actually got what we wanted from the builder without a barny. There is always room for raising the standard, tweeking the design on reflection. Also design is often about getting the best compromise. "In hindsight, I should have put insulation in the blue circle and put rebar up through and poured concrete on top, probably would of been the best solution" Yes in an ideal world from an insulation point of view but no from a structural point of view as the balustrade is introducing a bending moment into the concrete. My own view is that simplistically as heat rises you'll get more thermal bridging though your telephone wire than the long convoluted thermal path you show. On the upside what you do have is a good concrete core to post (say resin fix to) fix to and this can open up the opportunity to create a cracking clean detail. It looks like you have quite a good thick concrete core. If your budget can stretch to it then you could maybe cap the wall with a stainless steel plate with intergral drip detail, make the welding a feature. Use counter sunk hex bolts in sleeves to give that "engineered look" for the cap plate. In principle I think this could work but have not done a fag packet calc as yet. The cap plate fixings would be taking a bending force so you need to know a little more about the concrete, thickness and so on. By a clean detail I aslo mean something that looks great Architectutally but also something that is easy to maintain and keep clean.. not gather mould etc. Think about the welding on a motor bike frame, it can be a work of art, no sharp corners to gather dirt. I think with a bit of thought you could do something pretty tidy here. One of the keys is always to check any corner weathering details before you get carried away. Your starting point here is to look at the glazing / glazing fixings you want, post some dimensioned details here and you may get a few ideas on how you it make work from an SE point of view. Once you have that it may be that all the weathing detail falls into place in a simple way. In some ways I'm suggesting you spend more on the balustrade as you see this and less on what is covered. Part of my thought process is driven as I can see that the side plate on your drawing has a much reduced concrete fixing edge distance and the fixing spacing looks questionable. That may be a reason why you're not getting the answers you want SE wise. Also getting all this lined up, and interfacing with the upstand membrane looks problematic.
  9. Have a look at the building regs, they have some good diagrams. Also, a lot of councils provide guidance online with easy to understand diagrams. Most of the building regs make great sense and will stop you hurting yourself or visitors unless of course you have been at the neighbours home brew etc. Just follow the regs in terms of rise of step, going / landings and over time you will appreciate it.
  10. Hello Idont.. Cracking post. Is that long beach one of the Scottish Islands? It almost looks like a bit of Tiree/ Glensanda way with the whiter sand. As a word of encouragement you will get plenty pointers / advice here from folk that have embarked on this kind of journey. A lot of folk will also make mention of the mistakes they made in the spirit of BH. To get the best out of this then you may wish to post more info. Island location.. ferries etc or just off the beaten track. "Do you think anyone would be interested in this, any ideas where I could find someone up for the task?" Yes, but you to need to give more info to get a focused response. This basic info will set out your practical options.
  11. Hi Thorfun. Great to see you are getting on with your design team, it's very much a people thing and pays great dividends. How deep do you need to dig into the stone? Of course the scalpings you get out from the dig will make great hardcore! If you have the time you could maybe get some cracking bits of stone for hearths, walls if the bedding planes split off ok. Will cost a bit to explore but using / recycling the stone makes the house a bit special. Oh, and take a few photos if you manage to recover some good stone as if you sell the house you can put this in the brochure and prove the provenance.
  12. To me the basement slab insulation is continuous mainly with the wall insulation so you don't have a perimeter per say.
  13. Hello gc100. If you have the right relationship with your SE then you can explore the option that is a little less formal in places. Ask them how much for say two site visits to confirm the structure is build as per the structural drawings. Here for example the SE will formally check the layout, spacing of main members, founds, connections and so on. But in doing so the SE also (should) look at all the other bits and give you a heads up. What I am suggesting is not really recognised under many formal contract conditions that don't include full supervision (call this an old Clerk of works function) but it does work so long as the SE and the Client agree the boundaries of liability. I work on a lot of jobs say where someone wants to take down a couple of load bearing walls, they don't have the funds for a full managed and supervised contract but need a bit of help to deal with the builder. I would rather cast my eye over work just to make sure that it is safe. I take the view that best to do this as then you don't have to worry about a later failure where someone may be hurt. Yes, what I have said may raise a few eyebrows but my PI insurance allows me to be flexible.. but sensible.
  14. Hi Thorfun. Just a thought.. sorry if I seem to be putting a spanner in the works but the rock level has sparked interest. If you are hitting this material then you could change the game and save a pile of money. It takes a leep of faith if you are a lay person but sandstone is formed under great geological pressures. It can be a very stable platform. Why put a 250mm RC slab on top? I would start by having a look at the excavated level, see how weathered the sandstone is, try and get a handle on the bedding plane and so on. If you are hitting good rock why spend a load on money digging it out just to pour concrete back in? As I'm on a run. Roughly sandstone was formed in warm seas when the UK was south of the equator. As these plates moved north to form the UK they became tilted so the layers are not horizontal. When we deal with rock we look to see (not least) how weathered the rock is, the bedding plane and the size of the fractures between the rock. I would have a design review with your SE.. yes they may well charge you (should not just to have a 15 min chat on the phone) but the potential savings could be very significant and off the back of this you could end up with a good economic UF design. In terms of abrasion of the UF pipes. I have wrestled with this myself and concluded that as the pipes are plastic (elastic) and you pressurise then to 4 -6 -8 bar when pouring then when you run your heating at say 1.0 to 1.5 bar the pipes will not expand as much, even though they become more elastic when you run warm water ( 40 - 60 deg c) through them. Also, as the concrete cures it shrinks away from the pipes. My view is that the two will provide a few mircons clearance between the concrete / rebar, sufficient to mitigate any effects of abrasion.
  15. Hello George. I have highlighted your last sentence. It's a fascinating subject and as you can see on BH not well understood in structural terms. I have been knocking this about too for while too. You have the goetech side, the soil modulus and how this interacts with reinforced concrete / insulation layer say for a basement. Looking at a lot of the posts on BH and some of the details that are posted it strikes me how often the load path is broken particularly in terms of lateral stability and uplift, be that wind or shear / racking loads causing overturning of panels. Often you see that one design package will be the ICF, someone else designs the other elements and there is no real consideration given to how you connect / interface the elements together to achieve a robust and safe design. Another thing is to develop an approach that is simple to build. Simplicity drives down cost and this helps encourage all who want to build in a sustainable way but have a limited budget. The ICF concept for self build is much more main stream now. Even now in Scotland we have some serious interest in basement construction..underfloor heating is really starting to gain mass market traction too. Would be very interested in your view on this.
  16. Hi Thorfun. I was wondering that at 250mm thick there may be a fair bit of rebar in the slab. I would have a quick chat with your SE to check how they have designed the slab and if it is ok to introduce repeating weak spots by way of the pipes. Practically I would be cautious here with a basement. It's hard enough if you are a contractor to deal with a concrete pour, the risk of a burst shutter, delayed wagons etc. If they have to also negotiate the UF pipework without denting it, get good concrete compaction.. you need room for a poker or tamper between the rebar (essential for keeping water out) this may attract a premium at least. My feeling is to keep it as simple as you can. Do your structural slab, take a break to see if water comes in then do your UF as a screed laid all level later. If you do get water ingress then if you have pipes in the structural slab then this could make it more difficult to fix any leaks. Yes, you have the extra cost of the screed but structural slabs are not that flat so the initial perceived saving may not fit with the time you'll have to spend laying / levelling the floor finishes, or finding the one dent in a UF pipe loop that stops it working.
  17. Evening MP1. I used the Firestone EPDM 1.5mm thick, a little more expensive that the thinner stuff (1.2mm) but a failure here could let water into the warm roof. If this happens it will not get back out easily, the OSB would be particularly vulnerable. Considering what I was spending on the insulation, the labour effort, all the seam tapes and work to dress the second storey cills over the EPDM then I was ok going for the heavier EPDM. If you are going to do this detail you show for the roof then you must make sure you get a good draft blowing through the 50mm air gap and that can be hard to achieve.
  18. Hiya catrionag. As a word of encouragement.. there are a good few houses in Scotland (mainly in the west side of Scotland) that were built in the 40's - 50's that are fully timber clad, these are often referred to as "non traditional housing". These houses are insurable. You can find these for sale on the internet. The point here is that what you are doing re timber cladding is not new but an improvement on these houses, design wise. More robust fire protection and so on. Scottish BC are more familiar with the timber frame concept, timber cladding etc as we have a longer track record than say BC / English based insurance providers. Have you had a chat with a some local insurance brokers, the independant ones? You are on the East coast , try some at Barrhead, Glasgow, Paisley, Dumbarton way who know more about timber clad properties. They do, as more of these timber clad houses were built in the west rather than the east. In terms of insuring your house in the long term this should not be a barrier. For example the Athletes' Village (Glasgow 2014) development has SIPS panels all signed off by Glasgow City Council. Have a look at some of these for sale on Zoopla. Also remember that the Scottish fire regulations are a different in places from the English regulations. You may get a pleasant surprise if you go to a Scottish based independant broker for the build process, they will no doubt want to quote you for the normal house buildings insurance post completion. In the spirit of BH I don't want give you names..but a lot of the brokers from Motherwell west will give you a few contact pointers even if they can't help you. Oh, and they may also be brokering for a few builders so when it comes round to getting quotes for work it can come in handy re references etc. If you explore this and stay " local brocker " you also can build youself a bit of a support network, yes it may cost few quid more / often less + /- £100.00 but it can pay dividends having someone at the end of the phone rather than dealing with an national network.
  19. A few thoughts. Structurally in the main room you have concrete slab that floats about on some insultation but at the door you have the slab resting on the underbuilding which is a stiff point. As soon as the slab settles, cures, a lot of load will end up on the solid bit at the doors. Best to let it move independantly. From a buidability view why not maintain the same detail all round as per the left side of the drawing. Then infill with timber /insultation to mitigate the cold bridge. Also doing it this way can cut you a bit of slack when it comes to measuring the doors for manufacture / door / threshold options. This can really save you as trying to set these tight slab levels with a local (Joe Blogs) builder and save as much as you can is brave. Cut yourself a bit of slack with the tolerances. I've have been working on a rear extension with UF that only needs about 5 kW of heat as it's well insulated compared with the rest of the old house.. but I think I have got a combie that will modulate down to about 5- 6 kW so am hoping that I won't need a bufferton mitigate short cycling etc. One of the keys I think is not to over size the boiler.
  20. All looks a bit odd structurally. 150mm beams then 150mm of suspended ceiling then more..up to 400mm.. lots of fixing / labour detail, then service penetrations to consider. For a DIY self builder consider the price a local builder will charge to install all of this. If you have noisy kids.. then they won't be around for ever.. also, if too noisy just stop feeding them, could be much more cost effective.
  21. Just a thought. Once you get the connection sorted make the pipe diameter 32mm alkathene rather than 25mm which is standard for a shortish run on a single dwelling. The pipe will cost a little more, not much cf the trench etc. Doing this means that if you have a few bends in the pipe you reduce flow loss over the under ground section.. lets you play with the rest of the plumbing.
  22. Hi Eplison. Thank you for taking an interest, much appreciated by me. @Cpd good bit of encouragement here in that you can master the basic concept of hand cutting with an axe. If you buy a good quality slate then it makes life easier as a beginner. Slates are not like glass thus the " micro stress cracks" you mention don't propegate over time. Remember that we have been hand "axe" cutting slates this way for hundreds of years with no problem. Once you understand the principles of slating then you are off to a good start. Yes it may take a bit longer if DIY but you can end up with a cracking roof. Using an axe is in my view a bit softer on the slates than these other mechanical devices. You'll soon get the feel of the axe and know when to go gentle, some of the slates will feel bit harder than others as they will have come out of a different bits of the quarry bed. The main thing is to understand how you dress the slates at valleys, verges and chimneys as you use the dressing on the slate to channel water away from the vulnerable flashings and so on. Cutting with a grinder, shears are no match for this as they give you a square unnatural cut. Also, if this is your forever home or if you want to do a sound responsible job then think about how you maintain the roof say in 15 /20 years time. Some of the modern nailing patterns seem very much driven by the "warranty", in other words once ten years has passed everyone is pretty much off the hook warranty wise but you.. a good roof should last for 80- 100 years if properly and easily maintained. Pratically if a slate splits down the middle then if double nailed at the head it tends to stay in place while letting water in. You don't see it from the ground, great news if you are a new house builder. Not so good for you. You often see slates double nailed at the head, some with hooks too. I can tell you that in Scotland we have been doing slate roofs subject to regular 100mph winds for a long time. A single nail at the head, every third row cheek nailed. This method allows you to maintain the roof without damaging the sarking / felt / membrane below as you can get in to turn the slates to access any broken ones. For the curious you may ask how may you compensate for different wind areas. Well if you use a smaller or heavier slate then there is less wind uplift per slate.. I hope this helps Epsilon. It can be very rewarding to do and I think you'll find that using an axe is the way to go. From a professional point of view if I went to site and found someone saw cutting slates for valleys / verges etc then I would stop the job. On balance I would have a go Epsilon as knowing that you have done the roof yourself and made a sound job is a great feeling. Also, if you get the odd slate that cracks you know how to fix it in ten minutes.
  23. Slates are a natural material, do it properly and spend some time researching how it is important to cut them so they feather at the edges. How and where you tail a slate at a valley / verge say. Why not buy say twenty slates and a slating axe, I have a left handed one so you can get these too. Once you have done your research and had a play with a few samples then you are well on your way to a good job. Don't use a grinder or other gizmos.. you are inviting trouble.. your roof will not last as long. I have copied below some of a previous post which may help give an over view. Don't bother with a slate cutter. To get you started, buy a slating axe. I have a left handed one.. I use an off cut of a steel I beam over which I dress the slates. You need to grade the slates. The thicker and wider ones go at the bottom near the eaves. I grade second hand slates ( you need to do this with new slate too to make a proper job) into three piles. You can do four but you may lose the will to live. Grading the slates basically helps you keep the roof tight and flat. Have a look at an old slated roof and you will see thicker wider slates at the bottom, thinner narrower ones at the top. When you get to the verge or a valley you need to turn the slate and trim it the other way. What you are doing here is to encourage the water to move back into the roof in the case of a verge.. so it does not drip down the gable walls. In the case of a valley you are trying to stop constant dripping on to the lead valley and making a hole over the years. You try and channel the water down to the gutter so it drips here and this is where you often have a thicker lead piece. You call this "tailing" of the slate. This can't really be done with a machine..it's a craft. In Scotland it rains a lot, much is light rain.. so it drips a lot. In England say you tend to have much more intense rain.. thus the flash flooding but more dry spells and less of that constant dripping. The new home warranty providers and a lot of the slate providers require that all slates are double nailed at the head. Great if your poviding a 10 year warranty, eg if a slate cracks you often don't see it as it does not fall out like a single nailed slate. But a good well maintained roof should last for at least 80 years? For the roof pro's.. repairing a double nailed / every slate roof is hard going? You can fix the slate but the slate ripper causes more damage that is hidden? Yes there are repair type clips and so on but.. A common traditional method of slating in Scotland is to single nail each slate in the main part of the roof. Every third course you cheek nail a row of the slates, these slates now have three nails and stop the ones below from lifting off in the wind. This way when you want to maintain the roof you can get into turn the slates and easily extract the broken one without damaging the felt / membrane underneath. It's worth I think trying to master this skill, it can be very rewarding. I have left this out but make sure you choose the slate nails carefully depending on whether you are near the sea or not. You'll have a bit of wastage until you get the hang of it. Use the trimmings / wastage as decorative material for paths etc? What is worth while doing is investing in a slate holing machine. You turn the slate upside down. The punch makes a concave hole in the top side of the slate and the nail head sits nicely inside so it does not tip up the slate on top..helps get the " tight roof". You can hole the slates by hand but I would suggest getting a feel for cutting / shaping / tailing them first.
  24. There is an old saying that if you want to keep a friend then don't do business with them. I work with a few top craftsmen, they work on high end historic stuff to boot 30 + years experience, in fact many of them have forgotton more than I know! What about a watching brief for your Canadian friend. Then you may get the best of both worlds? I've made a few points on BH before about how say the Canadians / Americans do stair cases.. veneers, over cladding etc. It has not really caught on in the UK yet for modern building. Funnily we use a lot of these techniques on historic buildings but seem to not consider this when extending / self building. A bit of input from over the water could give you something special at a good price. What about a remote consultancy role with a "holiday at the end"
  25. Thanks TonyT for that tip. On a practical point if you have a really deep bowl sink then I have found that if the units are too low it can be (the sink) uncomfortable to use as you have to bend too much to rwach down to the bottom of the bowl. Now with my pragmatic hat on @Jen B It may be that you can just get some comfy slippers with a thick sole like clogs.. If you have a deep sink bowl and spending time there, go bare foot and the sink will be more ergonomic. There are a good few variables. Also, what about the oven... too low and harder to see into? I would look at it holistically as to what suits you before jumping one way or the other. For me I want a gap between the top of the plinth and the underside of the cabinets as I have run the UF heating at increased spacing under the units on the outside walls, just to give some background heat. We have an island set up , as a late change, so want the heat from the UF to get out from under the Island, keep the feet warm so I want a gap.
×
×