Fit it as far away from the boiler as possible.
-
Worth digging more than 200mm under floor joists?
TonyT replied to House man's topic in Introduce Yourself
Is this a new build or renovation? can you get rid of the extra soil? Do you plan on running services under the floor? -
Can you download some free DWG software? That might let you open his drawings.
-
Not sure, winding down at the moment. it’s a Worcester Bosch sense 2 thing
-
No still figuring it out as my boiler thermostat use a 2 core bus connection, so need to see if there is something I can connect to at the boiler.
-
Just spray it, that’s all I do, little rub down with sandpaper then spray paint. tape covering the lens.
-
garden Topsoil or no topsoil, that is the question
TonyT replied to Ebrin_devon's topic in Introduce Yourself
Get some sand in there and some air you will soon have a good lawn!- 13 replies
-
- clay
- landscaping
-
(and 3 more)
Tagged with:
-
unistut fixed to above the door on the wall, sliding mechanism fixed to door. you can hide the unistrut with a timber pelmet?
-
40mm up to 3metres any further up to 50mm
-
No worries, I will bow out
-
I managed everything myself and procured everything that I was involved in apart from plaster procured his own materials. roofer procured his own materials. groundworker procurered his own materials stonemason procured his own materials.
-
Developers have bulk buying power and economies of scale. I did a 60m2 extension, and kitchen to loo conversion, new heating system for £120,000 finished 1 year before lockdown. everything is expensive..
-
Glue has been used on chipboard flooring for decades. better glue is available than the basic PVA. If your surname is wimpey or persimmon fully understand otherwise get the glue and fixings out
-
No services except for the lift/lighting are allowed in an elevator shaft… my understanding of the regs and talking to engineers that maintain mine at work.
-
CT100 sat cable and cat 6a for me, I’m sure 34 others Will have a different opinion.
-
Bring the data and sat cable( coax is shit- very lossy cable) down from the ceiling down, and power from the ground floor up, avoiding each other. or just bring vertical chases up at each location and clip the cables under the floor to suit.
-
It’s a 2 string inverter, with 2 strings passing through the top isolator. poor for a new installation as far as I’m concerned. if each isolator was side by side, Dc PV cable could enter via the top and exit via the bottom. Each string would be seperate. AC isolator adjacent to it, it would have looked like someone thought about the installation.
-
Apart from being untidy, my only issue would be the 2 strings passing through the one DC isolator, but that’s a personal thing probably couldn’t find a specific regulation if all 3 isolators were side by side it would be an easier installation to maintain.