  1. I am really trying to think of a Pocster-esk answer to this ?
  2. We buy most of our stuff from Italy, white is generally ground/earth, blue is always positive.
  3. After WW2 and a massive leap in the wrong direction when the internet gave idiots a voice
  4. Does it have a hole right diameter for drop bar? If so it goes into top of concrete to keep the hole tidy
  5. Couple of noggins between joists either side of the wall and then a diagonal from the end of the wall to the purlin. You are not looking at big spans or loads (steep pitch roof), possibly an additional vertical as you say spread over a couple of joists to be doubly sure
  6. Never seen a DPC at that point, same here, can’t think of any good reason for it
  7. Definitely in a duct
  8. +1 on the mezzanine, 17ft is a long span for timbers, you could use joists (I beam or Pozi). sitting on the block work fully is possible, on the edge would be a definite no. Perimeter channel would be fairly easy to put between columns. you really need to check the column foundations as these are unlikely to be sufficient to take the additional load of a work or storage space. cool building tho
  9. Not easy to answer specifically as we don’t know what, span etc of the joists. what is the section and span of the purlin? might be easier to turn the purlin into a trussed member to enable it to span without support. If you definitely want to remove the whole wall you could add a steel and the prop sit on top of that in the loft space (steel to bridge wall to wall)
  10. @nod cheers mate, that’s good to know
  11. Doesn’t need to be anything fancy, I use a piece of ply or timber (I do have a big sliding tile saw but the grinder is much more convenient for a few cuts). dont scrimp on the blades tho, cheap ones often run out of true and chip edges much easier
  12. Omg! Yes. Made me cringe
  13. +1 on the above
  14. Good afternoon and welcome, I wouldn’t count on the insulation and air tightness being too great, and definitely allow for a good deal of improvement in these areas. that aside, good luck, have fun and keep us posted
  15. Good afternoon and welcome
  16. As above, forget what you can do on the inside, first look to sort the problem, then fix the effect
  17. Absolutely, the sushi mats made the build viable
  18. Some lintels only attain the given strength when they have the recommended masonary on them. Single course pre stressed concrete lintels are usually composite and so are some steel versions. not a problem using without the marinara as ling as the loads above are relatively low compared to the maximum given
  19. No problem unless it's a composite lintel as they are designed and manufactured to work in conjunction with the stated number of masonry courses above. Plain tensioned concrete are fine.
  20. What are you using it for?
  21. Haha, that’s the excuse I get ?
  22. Me neither, yes you have 440v between phases as opposed to 240v phase to earth but no reason for site staff to access the panel
  23. How often do ceilings suffer impact? For a kids bedroom or sports centre etc. It would be worth the extra cost but how often do you see plasterboard holed in a domestic building? …. Waiting for the LL comments here
  24. In that case, count your blessings and speak to them, make it a joke … you may seem a bit fussy but it’s your home and you would like …xyz! we are all human, we all have good and bad days and we all want our days to go smoothly. to quote the Advert … It’s Good to Talk.
  25. Agreed, short short laths and no way to fix the tiles, relying on gravity and a bit of gobbo to prevent wind getting under them. You could add clips to hold ‘clamp’ tiles to each other but still only self weight holding them down
×
×