Temp
Members-
Posts
10684 -
Joined
-
Last visited
-
Days Won
43
Everything posted by Temp
-
Shower Screen Leaks and Bath Problems
Temp replied to Listless's topic in Bathrooms, Ensuites & Wetrooms
I doubt it. That would only extend the deflector towards the wall/hinge. The deflector only really helps if it causes water to drip into the recessed part of the bath/shower tray rather than on the flat top. The water proofing is mostly provided by vertical vanes on the bottom of the door seal. Check these go as far towards the hinge as possible but I thing it might still get under the rectangular chrome block that moves with the door. -
+1 Perhaps there already is an AAV on the WC and its faulty?
-
Could solder it in.
-
New to self build looking for approx per square meter cost
Temp replied to Aks's topic in General Self Build & DIY Discussion
Lot depends on how complicated the design is. Simple rectangular houses with simple pitched roofs are cheaper than L shape with lots of dormers or similar complexities. -
Here you go.. https://www.rubi.com/en/blog/how-to-choose-the-right-tile-trowel-size-step-by-step/
- 9 replies
-
- conservatory
- matting
-
(and 3 more)
Tagged with:
-
I briefly considered mixing different suppliers for cistern and flush valve but I think some pneumatic flush valves are incompatible eg the way they do dual flush differs. Think some do.. Single flush 1,0 Dual flush 1,1 And others do.. Single flush 1,0 Dual flush 0,1 If you get what I mean.
-
No idea if any good.. https://www.bathroomplanet.com/product/vitra-loop-t-flush-plate.html?vid=14873&gclid=Cj0KCQjw8vqGBhC_ARIsADMSd1Cpd_8hKMz_RUbkXfiYM2LffeIZGwe10v5vamp7K80JsFAhi51Vm4oaAhyqEALw_wcB Buy two (one as a spare)?
-
Sand off the chrome and paint it yourself?
-
The executors should know if he's getting FIT income. They can check bank statements etc. If you rent out your roof do they put anything in your title deeds? Incidentally I hear probate is taking a long time at the moment.
-
Planning Permission, dropped kerb and CIL are all done by the local authority. Building Control can be done by the Local Authority BCO or a private company. My understanding is that if you use a private BCO they will notify the LABCO for you. So send all the drawings to the private BCO. Normally you send drawings and an application to whoever is doing your BCA and wait. They should eventually either approve your drawings, ask for changes, ask for more info or reject them. In some cases you may have to chase them up if they are busy. What a lot of people do is wait awhile then ask if they can start some work on site while they wait. In some cases people have dug foundation trenches but you should not fill them until the BCO has inspected them. Just be aware the BCO might decide you need piled foundations or more info so any work you do while waiting could be wasted. The BCO should make a certain number of site visits during construction. I recommend you are there when he does one. Make a list of any issues he raises and any solutions you agree. Also ask him when he wants you to call him back for the next one. He will say something like "When you are at first floor level". Follow up with a letter or email ASAP thanking him for his visit, summarising these issues, and confirming you will let him know when you have reached the point when he wants you to call him back. If you can't be there get your builder to do this and copy you. Its not unknown for a BCO to tell the builder to fix something and instead the builder covers it up. Try and be polite to the BCO and keep him on your side, especially if they ask for easy changes. You might need him to bend the rules a bit later on when it would be expensive if he insists you comply.
-
Looks like your SE has suggested a mix of C and box sections from them specifically. Lots of info on their site.. https://www.ancon.co.uk/products/windposts
-
Cement screed is good as there can be issues with anhydrate screed.. https://www.bal-adhesives.com/tiling-onto-calcium-sulfate-anhydrite-screeds/ 1. I don't believe you need an expansion joint at that size (unless tiling through from one room into another). 2. We have stone direct onto cement screed using flexible adhesive. I have seen decoupling membrane recommended for large format tiles as screed can sometimes shrink and damage them. Only issue i can think of is that perhaps the sun might cause rapid temperature changes in a conservatory? 3. Recommendations vary. Typically one day per mm thickness. Some places say one day per mm upto 40mm then two days per mm for the rest. Eg 60mm would be (1*40) + (2×20) = 80 days. Some places say a lot sooner. Have seen people suggest use a decoupling membrane to allow them to cheat a bit on the drying time. 4. 10mm rounded is ok. Should leave a 3-4mm thick adhesive layer when tiles fully bedded. Make sure there is enough adhesive under the corners of tiles. 5. Normally perimeter insulation is fitted before screening to reduce heat loss and prevent any expansion of the screed damaging walls. This is typically a blue roll 8-12mm thick. The exposed top is trimmed back after the screed has dried and covered with skirting after tiling. So yes leave a 5-8mm gap around tiles for same reasons. 6. Seal grout after fully dry to make cleaning easier. Consider dark coloured grout? Aside: Alkaline cleaners seem to work best for cleaning dirty grout. I'm not a professional tiler. Opinions vary on all this!
- 9 replies
-
- conservatory
- matting
-
(and 3 more)
Tagged with:
-
It can be zero rated to you but only if its done after you get planning permission. That's implied in VAT708 where it says..
-
Do building regs require a thumbturn on replacement front doorlock?
Temp replied to Adsibob's topic in Building Regulations
Did some googling and found a few people asking the same question. Some replies said yes the door must open from the inside without a key but when challanged about the regulations nobody was able to cite what regulation required that. Several said it was mandatory for an HMO. Approved documents sometimes refer to BS standards so perhaps its in one of them? Perhaps try asking a few door manufacturers to see if they know? -
Do building regs require a thumbturn on replacement front doorlock?
Temp replied to Adsibob's topic in Building Regulations
We don't have one on any external doors. BCO never said anything when he signed off our house but he was quite laid back about everything. -
Deflection of steel lintel over bifold doors
Temp replied to James Newport's topic in RSJs, Lintels & Steelwork
I bet many people measure the height at the sides and forget to measure in the middle. -
Reinforcement in blockwork over steel lintels
Temp replied to SillyBilly's topic in General Plumbing
PS The overlap doesn't have to be in the middle. Eg 2.7m length in the middle with two short lengths either side. -
Reinforcement in blockwork over steel lintels
Temp replied to SillyBilly's topic in General Plumbing
I've never seen these used but down this page they suggest a 6-8" overlap.. https://www.masonrymagazine.com/blog/2015/06/24/joint-reinforcement-less-is-more/ -
My Aunt is the same. Even unplugs her landline phone.
-
We use a night light plugged into a socket. Has a sensor to turn it on automatically when it gets dark. Fitted with an LED bulb it consumes very little power. Probably not worth having a motion sensor built in as they probably consume more power than just leaving the LED on all night. Edit: Think our night lights are around 0.5 W and a typical indoor PIR sensor is 1-3W.
-
Ouch - Timber frame price up £4,600 between design and manufacture
Temp replied to Haylingbilly's topic in Timber Frame
According to their web site Wickes Northampton and Peterborough each have 450+ bags of general purpose cement in stock but its "Not available on click and collect". Presumably its all spoken for but might be worth a try if anyone desperate. -
I'm struggling to get someone to paint a few windows. First three calls I made only one replied and came to look. He didnt seem keen and two weeks later no quote. Today I called another three and only one go back to me. He is coming to look totomorrow Think he might be Polish.
-
Help with Replacement Boiler! - Oil boiler costing a fortune!
Temp replied to Dazza's topic in Boilers & Hot Water Tanks
+1 I was looking at the figures here.. https://nottenergy.com/resources/energy-cost-comparison/ Kerosene 4.59 p/kWh LPG 7.55p p/kWh If they are correct a £1000 Oil bill becomes an LPG bill of £1644 not allowing for improvement in boiler efficiency.
