Search the Community

Showing results for tags 'foundations'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • BuildHub Guide: Information about the site : Introduce Yourself
    • About BuildHub.org.uk
    • Introduce Yourself
  • Build Design, Planning, Finance and Legal
    • Building Plots, Land & Renovation Properties
    • Design & Architecture
    • Funding, Finance & Tax
    • Insurance, Legal and Warranties
  • House Construction & Structural Issues
    • House Construction
    • Conversions & Extensions
    • Roofing & Lofts
    • Structural Works, Foundations & Demolition
    • Insulation & Ventilation
    • Landscaping & Outdoor Buildings
    • Damp & Infestation
  • Building Trades
    • Plumbing & Heating
    • Bricklaying, Plastering, Concrete, Blocks & Rendering
    • Joinery, Windows & Doors
    • Floors & Flooring
    • Electrics, Lighting & Home Security
    • Decorating & Tiling
    • Kitchens & Bathrooms
    • Building Materials
  • Environmental, Alternative & Green Building Methods
  • Self Build & DIY: General
  • Self Build Regional Groups

Blogs

  • Salamander Cottage
  • The House At Mill Orchard
  • An Orkney Build (in ICF)
  • The House at the Bottom of the Garden
  • Hawthorn House
  • Rose Lane re-build
  • East Kent Self Build
  • Wee Hoose on the Croft
  • God is in the Details
  • Tennentslager
  • Kentish RenoExtension
  • Scooby Cottage renovation.
  • The Seasalter Sharp House
  • sussexlogs
  • Sips and stones may break my bones...
  • Our Journey North of the Border
  • Construction in Cornwall
  • The Fun Irish (House)
  • A house! A house! My kingdom for a house!
  • South Devon Self Build
  • Lucy Murray
  • Coffee Towers
  • caliwag
  • caliwag
  • Blackmore House
  • A woodland house
  • Self build on Skye
  • Escarpment to the countryside
  • Christine Walker
  • Netherwood lakes
  • Kingseat
  • Mr and Mrs Triassics New Home
  • Yaffles
  • Wedding Cake Re-build
  • Clancutt Lodge
  • Self-Build in Shropshire
  • South coast ICF build
  • 5 (2 adults, 3 dogs) go building in Dorset
  • Hillcroft
  • Self Build NE Scotland
  • Timber Portal Frame - but stick built
  • Self Building two in North Wiltshire
  • 1970s Chalet-style house renovation
  • Under the Chestnut Tree

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


Location

Found 18 results

  1. I have a Victorian terraced house in London W4 and I want to fill in the L shape of the ground floor so as to create an extension/conservatory. I want to emphasise the conservatory aspect so that I don’t have to apply for planning permission and building control, but I want to have a good, solid floor with insulation and under floor heating. The area to be filled in is 5 m long by 2 m wide with solid foundations to either side. The ground is 250 mm below the floor level inside the house. At the moment there is an inspection chamber for the drain, but I want to get rid of this and have a rodding eye outside the new conservatory. I would like to be able to do it all myself. What is the cheapest, least hassle way of doing it? Thanks.
  2. Hi guys, I'm looking for some advice and example foundation and slab detailing for timber frame construction. This is what I have in mind so far. Foundation: 300mm of concrete (my soil type is hard ballast) Single 140mm block up to DPC Start of TF construction with 145mm sill plate Slab: Hardcore Sand 60mm floor grade insulation 150mm RC slab 65mm screed One more important detail is that the new construction is set 135mm below ground level, so the internal first floor level is below the external ground level. What options do I have here with regards to the foundation? I can see two options. Dig a trench around the building around 375mm so the exterior ground does not come in contact with the house, and maybe add in a french drain. Have a higher DPM to external ground level and add some insulation to cope with the external ground being in contact with the foundation above first floor level. Any thoughts and comments very much appreciated as always Cheers!
  3. hi, Probably obvious this one ...but i don't know the answer Currently i m waiting for my timber frame supplier to finish and give me the Building Regs document for their bit ...ETA 4 weeks I am in process of drawing up the sewage and services layout for my bit ...ETA 1 Week My foundation company say they NEVER do them and the "setting out drawing" and the "load calcs" (from the frame company will suffice All seems to be tickling along ... Although I just got an email saying that the although the foundations are going in about 4-6 weeks, the foundation company are going to crack an entrance by removing bushes (as currently there is none) , start grading the land and dropping some hardcore in there in advance of the Foundation and frame vehicles Am i silly in thinking that Building regs should be already FILED by the time work starts ? or does the above not count as WORK ? I dont want to be accused of breaching some law or other ?!?
  4. Dear All, Although we have a structural engineer on this, i would really appreciate any suggestions that i can put to him. We are putting together detailed design drawings for the tender process. There is a main trunk sewer running front to back under my property. Thames water will not allow building within one metre of the sewer, so all my house plans involve the flank wall of the house running parallel to but a metre from the sewer. We are constrained on the other side of the plot and so can't move the house further from the sewer, all we could do is make it smaller which creates significant delays, adds additional costs and might require planning permission - which I'm sure we'd get but I'd prefer to not have to start again and lose a year, nor do I want to make the house smaller. The issue is that the main lank wall does not sit at the edge of the foundations. The proposed trench foundation is 2.4 metres wide, with the wall centred on the middle of the pad. (it's a heavy house so I think the structural engineer requires a pad of this size). The wider foundation defines the closest point we can be to the sewer and so the wall if central to the pad has now moved 1.2 metres further away (minus the thickness of the wall). We could potentially pile just down that side but if piling the minimum distance increases to 1.5m. I'm wondering if there is any alternative type of foundation for a very heavy house with a 225sqm foot print that will see the outer walls sit right at the edges of the designed foundations. Any suggestions would be greatly appreciated. Thanks in advance, Adam ps. I'm trying to keep cost down, but at the moment I'm just hoping that there is a solution rather than worrying too much about how much it will cost.
  5. So here's something we found in the ground when levelling our site ... an old swimming pool. I said "under the house" in the title, but it's only under the ground surface level by inches and therefore a basement leisure area is not an option. As it falls half under and half outside our new house's footprint we have a problem. What do we do with it? Remove it all and pay for the concrete to be taken away say. 4 loaders + 1 or 2 days labour Put a metal deck on top and moth ball it. c. £2k materials + 2 days labour. Expensive and doesn't achieve a great deal Fill it in with hardcore and pretend it's not there. Cheap; we have loads of hardcore. Raft foundations will go on top. But will this be safe? We could create a 3m x 2m x 1.25m high wine cellar beneath the kitchen, but I'm trying to guestimate costs and I think it will be thousands of pounds. The glass hatch alone is £2k and that's assuming MBC can work their foundations around this. Has anyone experienced anything like this before? and / or, can anyone offer any other solutions? (nice answers only please 😀)
  6. We are just about to begin the planning application for our new house, had a positive pre app response from senior planner on design so fingers crossed for the next three months. Plot is in a high clay area solid for at least 2 meters deep if not more with a hefty load of flints for good measure. Plenty of trees and hedging on site also, hawthorn, plum, pear silver birch so foundations and slab are going to be interesting. Which frame company to go for, what heating style, windows etc. plenty of decisions to make if planning goes our way so will be looking through the posts for help on the way. Anyone else building in Nottinghamshire around Newark or Southwell? Chris
  7. Hi all, A bit about our project - we have planning permission for a large-ish double storey side extension for our house in Hertfordshire. There is a single storey infill extension (block and brick) that I built in 2014, attached to and converted one of two detached double garages that were already there.  I’m at the stage now where I’m researching different build types for the extension and am really drawn to the ICF and SIPs style of build, particularly Durisol. The problem I’m having is finding a structural engineer that isn’t going to charge me an absolutely fortune (£8000 the first quote!!) for an existing foundation review and design of a raft foundation so if anyone can recommend a good structural engineer with experience of ICF in particular I’d be eternally grateful!! I really get the impression that the professional services see that you’re a self-builder and add a zero onto their quote!! I’ve attached the existing and proposed elevations and the ground plan that shows the existing foundation make up. The existing flooring on the plan that shows the Family Area is block and beam, the kitchen and garage are a concrete slab on strip foundations and the utility area is proposed ie. hasn’t been built yet!!Any advice would be really appreciated!!
  8. Our site is bordered by a wiggly little rural lane and so there's no chance of taking a reference off this for the location and layout of the new build. The groundworker needs to dig out for the piling system as well as the slab foundation so I need to make sure that everything is the right size and in the right place. I'm assuming that I need a surveyor to do this, which will cost me a few quid, unless anyone can come up with a genius, money-saving alternative. Also, do I need them to set out in 2 stages, i.e. first for the piles, then again for the foundations?
  9. I am now looking at my second plot but the soil survey (from by the vendor) is rather intimidating and scary. I could do with some calming down and some advice. plot is near rectangular 13m by 19m soil: sand and gravel 0.15m to 1.35m depth underlying Gault clay groundwater below 2 - 2.5 metres depth the site has two major trees. "Live roots were recorded within the boreholes to depths between 0.90m and 2.80m 

" Foundations


 recommendation Sleeved piles Driven piles not possible because of proximity of neighbouring buildings "Single 300mm diameter bored piles, installed to 10m and 16m depth at the locations [… ], would have estimated working loads in the order of 170kN and 310kN (FoS=2.5). Different pile lengths, or diameters, from those detailed above would give different available working loads, which could be tailored to suit the working loads required. A piling specialist should undertake final design of piles." Floor slab "The floor slab for the proposed structure will need to be suspended on the piled foundations, in order to avoid differential settlement between them. As the floor slab will lie within the range of influence of mature trees, and desiccated clays are present, the ground floor should also be separated from the underlying soils by a sub-floor gap, as indicated in Table 7 of the above cited NHBC Standards." This all sounds firghteningly expensive and as I read it I thought of the phrase "you're not out of the ground until you're out of the ground". What should I make of this? I have not made an offer on the plot as yet but I suspect that this should impact the price. I would be happy to ping the full report to anyone who'd be willing to give me some advice.
  10. So my drains and Radon sump are in position under my insulated foundation slab. I’m now thinking of what else I should install under there, I’m thinking a duct for a power cable and a duct for a phone cable. So is there anything else I should consider installing before it’s too late?
  11. Hi All, Bit of a general question regarding foundations, would be great of anyone can point me in the right direction. I’m looking at a house with a view to extending & refurbishing, it’s a 1970’s bungalow with large dormer windows within roof/1st floor level. My basic intention is to retain everything from the ground to first floor finished level and build up the wall to create a proper 1st floor area (currently a dormer window config with the roof sitting onto of wall finished at FFL). What’s the general approach when looking at foundations, I’m guessing I’ll have to expose existing and assess their loading capacity to take proposed 1st floor wall loading and new roof. Is it a simple case of reinforcing existing foundations? Any general pointers would be much appreciated with the above scenario? Risks, expense etc? Am I looking at this correctly? Thanks, Phil
  12. I need to produce a schedule of works for my insulated foundations, has anyone got anything they would be willing to share so that I could save time by plagiarising it?
  13. I'm writing my schedule of work for my self Build insulated foundations. Can anyone advise on the tolerances for things like the hardcore layer, the blinding layer, the EPS (prior to pouring concret) and finally, the tolerance of the finished power floated concrete?
  14. Foundations going in next week, weather permitting. What concerns me now is all the things that go through the foundations : foul drain, water, electricity and rainwater recycling - and in our case MVHR. How accurate do we need to be in determining the place that these services come through?
  15. This looks like this today I had a look at my records: January 2014 was the moment we first thought we might have a go at a planning application because our colleagues told us it was worth a try. Many times we were advised (correctly by estate agent friends and others) not to bother. @MrsRA bought the orchard (which the digger is now levelling) in 1985. It's nearly 30 years since there was a glint in her eye about getting a house built here. When we've built the house we'll reinstate the orchard. Put your orders in for Damson jam quick as you like. I can't tell you what a relief it has been to get to today. Piling mat will be finished Wednesday, and the stone columns go in on Saturday. The BCOs (Approved Inspectors) are having a CPD session at our place on that day , so a couple of inspectors are coming to see the stone columns go in, and the piling company Town and Country Vibro is also having a company training session at the same time. Better go and buy some more tea bags.
  16. We are building on a slight slope: I have come to realise that this is a significant advantage in terms of drainage and other issues. Talking to a contractor about how much stone will be brought in, he mentioned that it was something of an art to estimate the amount of stone needed - especially where there's a slope. From my teaching background I know that conservation of volume is one of the last things that humans learn (look at the difference in the designs of pint glasses - some look large, others surprisingly small - even experienced people find it hard to estimate volume) We have had a topographical survey. I have superimposed the piling mat area in red. The image is oriented North-South. You will see there's a cross-fall South East - North West of about a meter. And somewhat less from the North East to the South West. Roughly, it's a lop-sided wedge. If it were a simple wedge, calculating the volume would be easy. But it isn't a simple wedge. I frightened myself silly looking at maths websites in attempt to calculate the volume. I already hear a chorus from over the water about over-thinking. This is just a bit of fun. At worst we'll need a few more loads of stone: tough, suck it up. I'm interested in how to go about calculating that wonky wedge volume. Pointers, please!
  17. We need some piles. Into every life a little rain must fall. I know nowt about piles. So, onto YooChube, onto the architect, onto the SE, and I have some outline advice. Use screw piles. Why? Here OK, so now what? I know the cost will be significant, and when my bank balance is about to get hit, I get cautious. So, I've decided to blog about it in a good deal of detail. Because there's one process that makes me more jangled than anything: how does anyone compare like with like? Reducing risk is the key thing I think, but I still feel damn nervous about it. And one way of reducing that horrible feeling that grips at 5 in the morning - what the Hell have I missed out now ? - is by turning that fear (yes fear) into some sort of creative, positive action. Hence the blog and this post. So, I'm putting all of the information on line (suitably edited - no emails, no phone numbers, no company names, no addresses) so you can all have a look and comment Please come with me, linger, lurk, laugh, look, learn with me. And comment, poke, challenge, ask. Please!
  18. This checklist is intended as a starting point for your own thinking. It isn't definitive, it is intended as a guide. There's a downloadable pdf (a link at the bottom of this list) version which I'll update in the light of comment. Comment and discussion make this list more useful: please add to it, and make suggestions or offer constructive criticism. This particular list is far from complete - there's a lot to think about getting the foundations right. Soil survey : get one done Topographical survey datum: have two Costed Enabling work Delivery access, how? Site Signage Perimeter Fence How will you pump out when necessary? Temporary sump for perimeter drain Ridge line? Marker system to avoid over-filling Logistics of getting concrete to site, access track, concrete pump, crane and skip etc BCO requirements and experience ======ARCHITECTS================== Architects proposal If relevant, has the Architect ever done passiv before? ======STRUCTURAL ENGINEERS======= SE calcs, but if passiv slab care needed Insulated Concrete Foundations needed? SE and Professional Indemnity Insurance. Strip, pile, pad, raft : which? =================================== Trees? TPOs? Services already on site: dead? marked? protected? Perimeter Drain Drainage layers Shuttering for existing drain runs. Neighbours informed, how close? Party Wall Act Detailed drawings to BC Crossheads in place Trenches checked Levels checked Location of services within the makeup, drains, water, phone, gas, etc Redundant ducting to be included (for use at a later stage)? BC contacted Build up? Detail Steel reinforcement, where, how much, starter bars for walls etc UFH pipes within concrete mass or in screed? Quality of workmanship ======Logistics===================== Calculate concrete volume Route instructions for driver: tricky approach, tight turns, weak bridges? How many loads Load Timing Left over concrete: where to dump? ================================== Shuttering support Levels during pour Height to which to build BC visited and signed off Preparation for the day(s) of the pour Compaction: whacker, bomag, twin drum Damp course, Radon barrier Checklist Foundations.pdf