  1. The Load terminals have deep discharge protection- they'll switch off at 10.7V or so (on the 12V version)
  2. the fact that they have some "monitored sites" sure makes it seem like they are aware of the issue...
  3. Pricey, but just what you're looking for: https://www.ebay.co.uk/itm/181087768961
  4. should this not have been designed before or during the Planning process?
  5. I wouldn't be so sure. Pressure vessels aren't everlasting and at the very least are likely to require statutory inspection under the PVD/PED , if not exchange and/or nondestructive or hydraulic test...
  6. Lifted out of the TUV certificate
  7. And that, as well as the consumption of the compressor heater are both measured and noted in the TuV energy cert.
  8. Umm, electromagnetic waves are very different to sound waves. Sound is pressure pulses and absolutely will sneak through tiny gaps.
  9. So their gate in on your ground?
  10. what material?
  11. yep, great stuff, no hassle to use.
  12. but do they deliver to NI yet?
  13. @Lord Greyabbey Hi and yes, you could almost lob a stone that far. PM sent
  14. ^ this, and likely ring shanks at that.
  15. Presume you like eating beans, Clive?
  16. Would this narrow your driveway? The sightline's not great as it it now, no chance it would make things more awkward for you in that regard?
  17. No, a week isn't too long. Get 'er lit.
  18. @WillCram just check the length of the bits- is there any chance the adaptor crimps down onto the pipe as it's tightened?
  19. a number of us seemingly have worrying similar backgrounds... Our stage lighting setup was a pretty fancy early 70s Rank board, but we lost a channel or two each year and no-one had ever tried replacing just the triacs til I was around...
  20. Both elements are fine then.
  21. Don't see any reason the spike can't be beside rather than under. And it really needs to be in before NIE arrive as a. your spark will probably want to test it and b. NIE will refuse to connect if Ze isn't acceptable. Sometimes one rod isn't enough...
  22. dig it up into a pile elsewhere on the site and retain for later use?
  23. you could try a corner bath where you've put the shower currently, and the basin farther along the long wall. A corner bath makes for an expansive deep shower tray... https://www.victorianplumbing.co.uk/laguna-corner-shower-bath-with-screen-panel?campaign=googlebase&pagetype=shopping&gclid=Cj0KCQjw1ZeUBhDyARIsAOzAqQLkYDnw4MHtv6EZ_RwTgQxbrzF5g0GE7yzSuxCatyBufDe6j6DLTCsaAtW1EALw_wcB&gclsrc=aw.ds
  24. spot/ small area guns will work off a 2 or 3HP pump OK. What depth is this cement? A needle gun would be an option too...
  25. Pricey I know, but Papst do some lovely quiet and efficient tangentials, I see these used in cooled incubators and the like https://uk.rs-online.com/web/p/centrifugal-fans/2436423
×
×