Don't jet wash. Just brush, clean with detergent (or use fancy decking cleaner), dry out and brush again, then stain. I'd avoid the glossy type decking paint as it never ever lasts. Just use decking stain. I'd suggest a dark grey if you want a change from the brown. You'll have to go darker. Looks like what is there already.
-
Anybody have a detail drawing on how they did this? We have effectively 175mm outer skin of ICF (75mm of the actual block, 100mm additional EWI). Architect has suggested a strip of compact foam along the underside of the door frame. DPC below this to meet the tanking on the outside. Door sill to be extended over all of this. NB basement below. I'm doubtful that the 175mm of ICF could sufficiently support a foot traffic aluminium sill? Could I bring the compact foam all the way out? It's not cheap stuff.... Any other suggestions? Lose the additional 100mm EWI at the doors?
-
Cost benefit analysis of thermally broken front door
Conor replied to Adsibob's topic in Heat Insulation
I'm not surprised, as I'm guessing the overall performance of the door will be quite poor. I'm guessing in around 1.8 or even worse. Make the decision then, and from somebody that lived in a similar house, there's nothing worse than a cold feeling entrance hall! -
Cost benefit analysis of thermally broken front door
Conor replied to Adsibob's topic in Heat Insulation
Find out the overall U value of both unit options and take it from there. I think you'll be unpleasantly surprised by the thermal performance of the unbroken unit. Have you looked at aluminium or composite doors? They'll generally perform much better. -
Bonkers idea or a great idea?
Conor replied to canalsiderenovation's topic in Landscaping, Decking & Patios
Corrosion resistant, very strong, cheap, easy to install. Sounds like a great idea. And I bet they'd be really easy to clad with timber or plant trellaces. Nice big slots you can bolt through. -
Building control comment back - encasing steel for fire
Conor replied to Moonshine's topic in Building Regulations
Intumescant paint is normally sufficient. I got a 2.5l tin and wil easily do all the steels in our house. £60. -
How wide is the entrance? A 6m or 7m telehandler isn't much bigger than a car but much more manoeuvrable and will easily offload a bail of blocks with a block grab. It'll cost £150+ a day while a crane will be £600+
-
Run the pipe down the driveway and then in to either the plant room or kitchen. Wherever is a sensible place to have the internal stopcock. You normally run the pipe straight with no bends / joins etc until it's inside the building and above the floor slab. Use ducting then bringing the pipe though the footings and slab.
-
On the footpath, where it says footpath on your drawing. The boxes are always installed in the public realm unless the closestain is already in private land.
-
And don't over use a disc... As soon as you have a notch out of it or its worn down a fair bit, bin it. An exploding abrasive disc is not pretty and the bits go everywhere!
-
As they will be embedded in masonry that will have a high moisture content, they need protection from corrosion otherwise they will corrode and eventually (decades) fail. Your engineer would have specified this requirement. No fire protection needed as they aren't exposed to a flame risk.
-
If those steels are in the outside course of block work, they need to be either galvanised or bituminous painted.
-
ICF - Structural Warranty provider
Conor replied to Happy Valley's topic in New House & Structural Warranties
I couldn't find any that would do both ICF and basements. So that's why I went with a main contractor as they'll provide it. -
Conservation Area Glazing Bars on Velux Triple Glazed
Conor replied to ashthekid's topic in Windows & Glazing
The conservation officer stipulated no fewer than 12 aesthetic recommendations for our application.... From no PV panels or PVC windows, real stone instead of stick on, cast iron rainware, etc etc. Our architect rebutted every single one of them. Try and find out how bothered they are about these. -
We allowed a 2.5% project deposit, followed by four main stage payments and a final 2.5% retention. Seems to be a fairly common way to do it. Remember vast majority of builders have credit accounts for suppliers, so the need for any big lumps of money upfront can't really be justified.
-
Zehnder ComfoAir Q450 vs Brink Flair 400
Conor replied to Adsibob's topic in Mechanical Ventilation with Heat Recovery (MVHR)
Speak to Scott at Lindab. I contacted them to buy ducting, he asked if I had sourced MVHR units, I said I did and told them the price and spec of the brink from ventilation land. They pretty much matched it (within 150 quid) with an equivalent Zehnder unit, and a good bit cheaper than BPC. It's a superior quality unit (according to my friend that is a designer and installer of various systems) and have it in stock right round the corner from me. They also did a design and a fully itemised quotation. It's (hopefully) coming in about £6k for two Zehnder Q350s and all the controls, ducting, plenums, air vales etc for our 315m² build. (Original quote was £7k, but they included the expensive WiFi units and twin 63mm ducting instead of single 78mm) -
The slabs work it's easier to have a "slot" than squares as you want to minimise the number of cables you lose. Your slab company will suggest what's possible. In our case, we left a few strategic gaps between slabs, and where we had a slab run parallel to a wall, leave the side of the slab short a couple hundred mm. When we've all our services though, we'll shutter the underside and pour some concrete in. I've left a gap like this along one wall of the main bathroom, so all the waste pipes, vent stack and MVHR ducts to the first floor will come though here. I'll then build a false wall in front of the gap to hide the services. Coring a 116mm or smaller hole in a 150 slab is easy enough, you just need to avoid the cables which are normally 150mm centre to centre.
-
Planning for ASHP pipes through external wall
Conor replied to Adam2's topic in Other Heating Systems
Yep, as above. We made numerous ducts though the walls using 110mm PVC pipes. A single opening for three services is easier to seal than three separates ones. If you don't use them, ease to seal up and cover over. -
I'm convinced that some people assume you have tonnes of money because of what or where you are building and just quote silly numbers as they think you'll pay it regardless. We're building on one of the most desirable streets in the most desirable town in northern Ireland... There are more Porsches than Peugeots. We are far more likely to have a Peugeot than a Porsche ?
- 37 replies
-
- 1
-
-
- basement
- concrete slab
-
(and 3 more)
Tagged with:
-
So in the summer you can have it set to DHW in the morning and cooling in the afternoon easily enough?
- 367 replies
-
- ireland
- timber frame
-
(and 1 more)
Tagged with:
-
Thanks David. I think I'll do the same then. Did you put rads in all of the rooms? We'll have four bedrooms and two bathrooms. Have you investigated a cooling setup yet? Something I'm keen to have the option of, even though it'll be rarely used.
- 367 replies
-
- ireland
- timber frame
-
(and 1 more)
Tagged with:
-
Ok, that design is very reasonable and I wouldn't push him too hard on it. Just make sure the rebar is all bent and cut to spec at the factory as it'll be a nightmare to work with on site. I am assuming you will have a contractor doing this all and not yourself!!!
- 37 replies
-
- basement
- concrete slab
-
(and 3 more)
Tagged with:
-
How are you finding the usability and reliability of the coolenergy unit? Good point about the rads, think I'll do the same. Are they on a supply each from the.manifold or shared?
- 367 replies
-
- ireland
- timber frame
-
(and 1 more)
Tagged with:
-
Over here, the DPM normally goes on top of the concrete slab and under the insualtion. 100mm PIR isn't very much, and I'm worried that your architect only specified 75mm. What's their insualtion / cold bridging / airtightness strategy for the rest of the build??? What's your predicted SAP?