Jump to content

jack

Members
  • Posts

    7352
  • Joined

  • Last visited

  • Days Won

    38

Everything posted by jack

  1. Says more about them than your house.
  2. If I remember correctly, our town council spends something like 10% of its annual budget on flowers, while pollution levels in the town centre have been at the extreme danger level for years without anything having been done about it.
  3. From discussions with Irish builders and suppliers, it's exactly that. The pendulum has now swung completely the other way, not just with higher standards, but with quite onerous requirements for certifying that the standards are met (something the UK could do with a bit of!)
  4. New avatar proposal for @daiking
  5. Have read of the "concrete" section of the Hoover Dam Wikipedia article.
  6. Anyone with an MBC slab (including me, @JSHarris, @TerryE and several others) have just this arrangement, although ours are reinforced and sitting on 300mm EPS. Works very well with decent insulation under it. What's your floor buildup more generally?
  7. Bit late to the party but just to add: we've had a Quooker for just over two years, and it's mostly been pretty good. The one thing it occasionally does is turns off by itself with some sort of flaw. You just click the button on top of the unit to reset, and it seems to be fine. It did it about weekly for the first couple of months, then went away completely, but has now started doing it once every two or three weeks. Might need a descale - will be contacting the manufacturer for support shortly.
  8. Welcome! Yep, several of us have installed them (including me). If you have specific questions, it's best to post them in the relevant forum where they're more likely to be seen and answered.
  9. I think you're right. Surely a whack hard enough to open up a crack like that across the full height of the hull would have done more damage to the superstructure.
  10. Tipped over a huge trampoline we only bought last year and bent several of the poles that hold up the net.
  11. That is such an AWESOME tune! If you want to feel really old, it's nearly 23 years since Kurt Cobain died (he would have been 50 this week had he lived).
  12. If you're really worried, you could add back a slice of 100mm of EPS to make up what you've lost, and cover it with whatever step, deck or whatever you're planning for the external transition from the door.
  13. jack

    We're in!

    Awesome work! Based on past behaviour, are you out looking for a new plot to start the next build yet?
  14. We were lucky that the groundworker we were recommended happened to have done one of these slabs before (not for MBC), so had a good idea what was going on. Then again, we also spoke to a couple of others and explained what we needed (grade of stone, pipes and conduits coming up in place) and they all seemed, at least on the face of it, to understand what was required. Hillard Tanner's foundation drawings are pretty clear, so I'd be concerned if they couldn't understand what they needed to do. I found their needs pretty clear, and any questions were always answered quickly and completely by phone. Of course, trades definitely gave us the eye you talk about, but we had that from almost everyone along the way (including people who don't even know how things are done traditionally). I think the electrician was the only one who was completely positive and thought the whole "different way of doing things" was wonderful.
  15. From memory we just gave them a FFL mark and a site plan, and they worked from there. I suspect that even if you mark it out they'll double check anyway, and since they're doing drains as well I suspect they'll be even more sure to carefully measure everything.
  16. We get it, he's Welsh. Give the guy a break!
  17. We have exactly the same detail, which was suggested by our architect and tweaked a bit by our window supplier. Do note that the recess and step formed in the slab isn't as precise as the rest of the MBC's work, as as it's formed onsite by offcuts of wood and foam before the concrete pour. I'd suggest forming it slightly deeper than needed, and making up to final level with something like a reinforced screed product. Ours ended up being a lot deeper than needed so we used reinforced self leveling screed to get within 25mm of final depth, then made that up with a layer of exterior grade plywood. Personally the plywood aspect of this worries me a bit from a long term perspective. I now wished we'd been able to get the depth right just with the reinforced screed.
  18. The PRV isn't adjustable and I have more than enough to do to complete the house without having to replace the PRV and go around fitting flow-limiters everywhere! I'll get the PRV replaced (with an adjustable one) once the house is signed off. It isn't that big a deal in the meantime.
  19. I didn't go into any of this myself, as all the calculations and design were done by the plumber. Our situation is a little odd. Our plumber wanted to make sure that if the building inspector decided to test the flow rates of any outlet, they'd all definitely pass. Rather than fit flow reducers at every outlet, he (with our agreement) temporarily fitted a 1.5 bar PRV on the incoming main. Over a year later and it's still there! The result of this low pressure is that if our water softener decides to run a cycle while you're in the (upstairs) shower, there's a very marked drop in water pressure. That's with a single shower and no water being supplied anywhere else. The shower is still usable when it's like this but it's not great. Similar to Jeremy, we binned the "full bore 22mm" flex hoses when we saw how small the actual apertures were. The unit was then plumbed using 22mm copper and plastic, so there shouldn't be much restriction. I don't know whether this helps at all, but perhaps it shows that even at 1.5 bar you can at least have a shower while the softener is recharging, as long as you're patient!
  20. Polytunnels are absolutely fine to discuss in the garden section, so fire away.
  21. Hidden came as standard on ours, although further down the line we discovered that some of the larger leaves required heavy duty hinges that aren't concealed. I don't mind the visible hinges that much, but they did make the internal finish a lot more difficult. It's hard to do a good job with the skim coat near the hinges when there's only a few mm between the reveal and a hinge. Agreed - ours are black and look great. A bit annoying that they have slightly visible text on them, but this seems to be pretty standard for some reason. One of our main issues was the thickness of our walls. The jokers that installed them didn't pack the windows up by 15mm as shown in the construction drawings. Unfortunately, the thickness of the walls and the position of the windows within them meant that we needed that packing to allow the cills to be installed.
  22. @HerbJ went with Gaulhofer. You could give him a call. One thing to discuss is installation: do they offer to install, or even insist upon installing, the windows themselves? What's the lead time from sign-off - will they give a guaranteed delivery date? Do, eg, continental August shut-downs affect your build schedule? Do you want any extras (eg, blinds?) Are there options for, eg, higher-spec spacers? I assume they'll be double low-e coated, but worth checking, and confirming what type of coating they use. Are cills included? What information can they provide about installation details - can they work with whoever's doing your construction drawings to make sure installation will be a smooth experience? That's all that jumps out at the moment. I was hugely impressed with the guy I spoke to at a building show a few years ago (Tomas, I think), who was the MD. Assuming it's the same guy, he's a Passivhaus trainer, which is the next step up from Passivhaus consultant, so he really gets low energy building. If I had my time again I'd likely have gone with Gaulhofer. The only reason I didn't was actually because they flagged an issue with window sizes early on. The people we went with didn't, and it was only when we were finalising everything that someone at the factory pointed out exactly the same issue that Gaulhofer raised the first time they saw the drawings.
  23. One of my friends is a consultant gastroenterologist. Says it's a pretty good job on a cold winter's morning!
  24. Yep. And the fact that it's all so obvious means there's a real incentive to spend those few seconds keeping it clean every day!
  25. I don't doubt that you understand the main issues better than a fraction of a percent of the people reading this, but there may be other things they do that take them beyond basic brushless motor controllers. Presumably their MTBF estimates aren't entirely grabbed out of thin air. Frankly, I'm far more concerned about whether they'll still be here in 25 years to honour the warranty. There's also the not-insignificant issue of whether what they can supply in, say, 10 years' time is compatible with the modules I currently have installed.
×
×
  • Create New...