Jump to content

Nickfromwales

Members
  • Posts

    30995
  • Joined

  • Last visited

  • Days Won

    329

Everything posted by Nickfromwales

  1. Sealed needs a G3. The less than dynamic tech support "guru" was quoting me on a Tri-store, which is manual fill eg non sealed / aka open pipe / aka vented. Your plumber will have the manufacturers installation instructions and needs to follow those to stay on track. The MI's are the final word.
  2. If you put the immersion on a timer then it would reduce fatigue on the boiler, but tbh, thats what the boiler manufacturers made it for so its not like it needs any babysitting What type of cylinder do you have? If it routinely runs cold then electricity will work out more costly, but if its a reasonably efficient UVC then it may be worth considering.
  3. As long as the integrity of the duct is good then shouldn't be a concern.
  4. As long as trapped gas can get to atmosphere where it will naturally dissipate then you'll be fine. If that duct end will allow gas to fall to the void below the house then it could be an oops moment.
  5. Which the SDM will kill off. Resonance effect aka drumming. Id put some on the back of the downpipes from top to bottom and try it. Something like this but in all black if possible.
  6. Does it run downhill to outside, and is the duct end open to atmosphere?
  7. Heavier, yes. TBH running it through the garage isn't a bad option.
  8. Load of pink grip and a metal dowel banged in will suffice as a cap end.
  9. As long as it's flexible you'll be fine tbh. ?
  10. Maybe sound deadening mat like they use in cars and under metal kitchen sinks to stop the drumming? Maybe on the back of the downpipes, or are they round?
  11. +1 on flexible.
  12. They should be able to un-install it, and re-do the joints properly. No smiles, no more cash. Tell them to come and take them out if they want to get funny. Tell them if you cant see the joints then maybe the non mono section may be liveable. Lets see what they come back with first eh
  13. Sounds like a proper FUp. Whats written down and signed for re the drainer ?
  14. Now get up on the roof and change that PITA ST AAV ?
  15. Kiln dried softwood will be ample. If you want to go wild, get a 1/4" router and soften the edges with a few mm pass with a round-over bit. Elbow grease and sandpaper will do a reasonably good job tbh, just maybe less consistent. Think upside down, and have the central support going up to the ceiling instead of done to the floor to maximise of the boxes / bigger 'floor-dwelling' items. A lot easier not to be working around supporting XYZ's. To get a decent fix above you may have to prep and paint a full length batten and use that to catch the joists. Then you can drop off that down to whatever needs support any the front. Alternatively consider a timber clad steel / spray-painted alu box section ( 40x40mm ) as the front horizontal 'load-bearer' and you should not need any central "sag mitigation". Just run from that back to the rear wall with slats, and rest those on a batten or alu L-section.
  16. You seem to be doing ok for an independent lady who works in IT
  17. And the rotational force goes onto plastic eg too much nail polish ( lady grunt ) and you'll damage it.
  18. That does indeed look like a professional job, particularly the GRP and the metal work. Pat on the back time I think
  19. If you use a rubber seal and its plastic components, the rule of thumb is tighten it so far and try it, if it drips, give it another 1/4 turn, repeat.
  20. Dont overtightnen it
  21. Once the waters hot, thats it. With PV you can still heat the water via an immersion, and then it can go on to offset your electricity consumption. ST cannot.
  22. In a PH ( or similar ) the argument to go all-electric is very strong. Simple, clean, "elegant" and near zero inspection / maintatence etc. Fortify that with solar PV and its game, set and match.
  23. I would tell them to call out immediately or foot the bill for someone else to come out. 4 days is BS. Any pics of the waste etc?
  24. Does a PV array have to be enormous to compete? Given ST is just a one-trick-pony I done see there being that much argument in favour of ST, unless as I said youve got a swimming pool or a hot tub etc eg a large mid temp heat requirement. ST won't ever charge your EV or keep your beer cold in the fridge
  25. Crap plumbers everywhere are currently bulk buying those ! Previous customer had a £35k bespoke kitchen ( fitters of which couldn't hang a picture tbh ) and they're MD came in refusing to let me near the plumbing, after I'd plumbed the entire bloody big house without issue. Along comes the fitter with a worried look and a blow lamp. Following day, a Saturday morning, the customer is walking around his 100m2 of 600x600mm porcelain floor in flippers Who does the kitchen co ask to fix it? Dry soldered joint. They got the copper so hot it had gone black. Ive not ever heard of or seen these devices tbh, just not sure how to approach a customer and say "can you spend change of £500 fitting this system to protect you against my plumbing in case it leaks?" One for the customer to decide I guess, but I'll certainly consider suggesting fitting one if they're happy to pay for it. I'll bet there will be a mixed response and some ridicule from other plumbers. @lizzie Was this an error on the plumbers side, or the kitchen fitters side?
×
×
  • Create New...