Jump to content

Nickfromwales

Members
  • Posts

    30346
  • Joined

  • Last visited

  • Days Won

    297

Everything posted by Nickfromwales

  1. As per my last, I cannot work out what the current depth is between the top of the insulation and the underside of the floorboards? Only then can we advise
  2. Yup. Doesn't look like you'd have room for another 20mm or 25mm of rigid insulation plus the wool? How much insulation is there out of curiosity?
  3. This one shows the lights caulked, screwed and wiped. Plasterer scrim taped these before skimming, taped before on a previous job iirc but works either way tbh. Screws removed before skimming.
  4. Have installed a lot of these for my current 2 clients builds. They look a million dollars when skimmed and painted, IMO. I use decorators caulk around the hole, then push the fitting up into the caulk, and fit with a couple of temp screws. I use baby wipes to remove almost all of the displaced caulk and lea e to dry. The screws get removed immediately before plastering. Regarding scrim, I do that every time for belt and 2 braces. Cost = next to zilch so why wouldn’t you ? I apply the scrim around the hole before the caulk and fitting of the light. The tape goes half inside the perforated skirt and half is left exposed to pick up the plaster. I used a bi metal hole saw and cut discs out of foam to use to plug the holes in the light fittings, with the lamp retaining rings still fitted eg so they didn’t go walkeis or get damage in storage.
  5. If there’s no access from below, eg to staple the plates to the underside of the floorboards / deck, then I always recommend putting sufficient mineral wool directly under the plates to make them distended. The fact they’re left raised up by the wool means that when the deck gets screwed down, the wool compressed and maintains the contact between the plates and the deck. You’d need to spend an afternoon manually reshaping these to get the sag out of them, but no need whatsoever to discard them imho, just needs a bit of time and elbow grease. Leaving the PIR insulation where it is and fit the wool on top of it, as long as it won’t move south under compression of course.
  6. Nah, you always stick a skinny 6 / 8mm drill bit through before coring out, through the repairable cement ( pointing ) to see if the lintel fitted was oversized. Some lintels are ‘too big’ because that was the one that was available on the day of purchase. Always mark the hole out but then, first, drill a test hole the side nearest the opening to ascertain that you’ll defo miss the end of the lintel. 2nd year apprentice stuff tbh.
  7. Ah, OK. When screwing the plasterboards to the studwork, you should make sure there is timber, and that you screw into it, at the position that the tray will be bonded back to the plasterboard. That make sense?
  8. Loads of vids of what to do / how to thin paint and types etc Take a huge amount of time to mask up around windows and doors etc, as cleaning off overspray will take 10x longer Short cuts always take 3x longer or more, so mask and spray in a controlled fashion for an easy life. If you don't put in the effort with masking, you'd be far better off with a roller. Follow the guidelines for cleaning and stowing the machine after each use, religiously. Your idea to use dead spaces for practice is a robust plan. If spraying in this weather it'll dry as you're putting it on, so will be a much bigger challenge to get a good result. Possibly spray early mornings only, and not after midday.
  9. We're really not helping are we?!? LOL Apologies, I'm stuck in a hotel, arrived back late, and am now drinking to catch up ( under duress of course ).
  10. They're beats, must have been fun! Looking good
  11. At least put a cheap Climaflex 13mm wall pipe insulation on first, and then fill the void with mineral wool to compliment. That stuff is cheaper than shoplifting and will be far better that just attempting to manage the losses by stuffing loose wool around.... Seal up where the pipes start / finish ( each end of the boxing-in ) to stave off any convection ( heated air ) flow. Do you have PV, so as to reduce the amount of summer boiler heating of the cylinder?
  12. Aluminium spreader plates for me, just so quick and simple. Great results every time.
  13. Less gin, more tonic The 2x2 is ample, relax. This is exactly how most do it. Words from the wise
  14. Yes, and the cocks fitted that on the internal wall........presumably after coring out and realising there was a Catnic in the way! The round hole in the outside skin of brickwork is where the 100mm through-wall vent duct and plastic grille were then fitted ( doing the square root of SFA ) to hide the fcuk up. They clearly knew they'd dropped a bollock as there are some small holes drilled so they could get a whiff of air through, plus what looks like a failed ( or more likely abandoned ) attempt to drill a 50mm hole with a bi-metal holesaw. Probably limited to the number of tools they could fit in the saddle-bag
  15. Complete amateurs, or just careless tossers. Either way, a terrible job. The walls should have been dubbed out and dragged straight before even considering applying the render, or it could have been an excellent candidate for external wall insulation which could have been applied and shaved nice and flat. On a scale of 1-10, that jobs a 2 or 3 at a push. If they said to you, before starting, "the walls are wonky so the finish will be poor" then that's a different story?
  16. I’ve done a few like this in garage conversions, no complaints to date. I cut that section of insulation in last, the area under the tray plus a few inches more, and set that back down onto wet expanding foam. Whilst the foam cures you will need to put a piece of timber deck down and lay some very heavy weight on it, evenly distributed, until cured ( 2 hours should be plenty ). Bond the membrane to the insulation with CT1 or Sikaflex and roller it out with wallpaper joint roller, and leave to dry for 24 hrs. Fit the timber deck down, bonding it to the area of membrane that you previously bonded, and leave again to cure. Set the tray down into a bed of Sikaflex ( NOT a sand and cement mix ) and be generous enough with it to use that to level the tray. Bond the tray to MR plasterboard the 2 or 3 sides around, and remember to screw into the plasterboard when fixing it to the studs, at the same level where the tray will be bonded to the plasterboard, so it’s nice and solid. FYI, I always do these types of conversions using 2x layers of deck board ( 18mm or 22mm P5 Egger etc ) with the joints overlapped for 2 belts and 3 braces, gluing snd screwing the hell out of them so they become one bit of deck. I have put washing machines on these types of floors ( garage to utility etc ) and even spin cycles etc never see a mm of movement. This is quite a solid way to lay a floor as long as the subfloor is near perfect in level and uniformity. If not, self levelling compound should go down first to get it flat and smooth, as there is no other practical way of levelling once the insulation has gone down. Done properly, this will be fine.
  17. Horses for courses, but I’d prefer the ceiling left non ‘littered’ and accept a boxed-in unit lost down low somewhere, so sucking cooler air in from lower and blowing it upwards / outwards. Possibly hidden in the bottom of a part faux bookcase or similar. To effectively ‘blow’ the cold air out, the ducts / terminals need to be reasonably sized and ‘open’ eg you can look up into them. Have you provisioned for these to be at the ends of the room? You can mount these a little more remote to the room ( adjacent cupboard etc ) and insulate the ducts, depends on the house / layout / space etc of course.
  18. Not from what I'm reading there. 2x batts = 3kW max discharge. 2x batts + extra pod still = 3kW max discharge rate. The extra pods only permit system size / capacity expansion when more batteries are introduced. The energy comes from the batteries, so they dictate everything.
  19. Just grab the bull by the horns, and tell your installer the "problem" is yours, not theirs. Conversation over, nobody gets hurt
  20. MVHR has a fan. It goes around for a VERY long time before starting to wear out. That is usually notable, and an annual service will identify this early on, ergo it is a known and predictable failure which you can actively mitigate against.
  21. Internal backup immersion kicks in. Same as the neighbours, put a jumper on, buy some candles.
  22. Isn't it the number of cells, not inverters ( BMS ), that dictates that max discharge rate, no?
  23. I was a little frightened that you would hold back. You go, sir! He's as 'good' as the many sacks-o-shart that have gone before him.......
×
×
  • Create New...