Those figures are crazy.
I wouldn't cut things out I would go through and see how the figures are calculated.
1. Architect at 9% of cost is very high, is the architect expecting to be paid more due to the higher budget? I negotiated a fixed price based on the budget costs. The cost is much more now but the price is the same, why should I pay the architect more if I decide to spec nicer windows for example.
2. £10000 for underground drainage seems v high, it is 2/3 of the foundation costs.
3. £27,700 for windows. My triple glazed windows cost only twice that in a house more than 5x the size.
4. £70-80000 for the frame, £440 a square metre is nonsense.
5. £20400 for electrical, again I am only about 50% more for a way larger house.
On the other hand some of the fittings and finishes numbers may be too low but they are much smaller numbers.