The key to any paving is not the paving itself but the preparation and foundations under it. The paving expert website is great. For many things they have example specifications you can use for the design or to get quotes. A scroll down the site index will give you loads of ideas. Don't skimp on the foundations or you will regret it. Hire the proper equipment for compacting hardcore. I would start with an application for a dropped kerb at the council. This is needed to legally drive across the pavement. You can avoid having to make a planning application if you deal with any rainwater run off on site. This can range from simply sloping the drive towards a flower bed or installing drains and a soakaway. The things to avoid are having rainwater run into the road or pool up against the wall of the house.
-
External Water / Power - missing a tricks during build?
Temp replied to BadgerBadger's topic in General Construction Issues
If you plan to have power in an outbuilding/detached garage or electric car charger I'd run some duct pipe through the founds near the CU/meter. Other possibility would be a duct and draw rope while you still have a digger for the trench? Oherwise what @PeterWsaid. -
Warm v's Ventilated Roof - Which Way to go ?
Temp replied to bob the builder 2's topic in Roofing, Tiling & Slating
One option might be to fit 50mm battens to the sides of the rafters. These would serve to preserve the ventilated gap and provide a face that PIR insulation could be sealed against. The idea is to make the cutting of PIR less critical. It would work with either all PIR or a combination of PIR and another type of insulation such as wood or wool fibre insulation. I think this would work well where you just have straight rafters but roofs also have lots of triangular areas and odd shape bits where its harder to fit insulation without either leaving gaps or blocking the ventilation. -
Warm v's Ventilated Roof - Which Way to go ?
Temp replied to bob the builder 2's topic in Roofing, Tiling & Slating
The insulation is specified as 120+25=145mm of PIR. We have 150mm and wish we had more. I don't understand why they specified 222mm deep rafters and only 120mm insulation between. You normally only need a 50mm ventilated void so could fit 222-50 = 170-175mm of insulation. PIR is good thermal insulation however it's very difficult to fit PIR tightly between rafters so the ventilation in the void doesn't get into gaps. Its a mind numbing job cutting bits of insulation that builders do badly. Perhaps insist they foam gaps? It's why if I ever build again I'm probably going for a SIP or warm roof with the insulation above the rafters (eg design out the problem so builders can't get it wrong). -
Warm v's Ventilated Roof - Which Way to go ?
Temp replied to bob the builder 2's topic in Roofing, Tiling & Slating
OK so that requires a ventilated void between the ply and insulation. The note top left refers to continuous ventilation at eaves and abutment (top) but the drawing doesn't provide any detail of that. I would expect there to be something like the following at the abutment but this particular solution may not be suitable if you have standing seams. The roof supplier really should recommend or make something suitable. -
Requirements for Heading to Committee
Temp replied to BristolBuild2020's topic in Planning Permission
When our planning department receives a new application they always write back with a letter that says something like.. "Unless you tell us otherwise we will assume you are waiving your right to have the application determined within the statutory period". I suspect if you write back to assert your rights they will refuse it on vague grounds so you have to appeal which takes even longer, or they will just keep asking for more drawings to put the ball back in your court. Edit: Now I think about it we gif asked for another drawing 1 day before the 8 week deadline. If they don't decide within 8 weeks you can file an appeal for non-determination. The issue is the deadline for appeals is 6 months from when the decision should have been made. So don't let them delay too long or you can loose the right to appeal. I would file an appeal no later than 4 months after the due date. So I would write back to say you underand they they are busy and that it won't be considered with 8 weeks statutory period but you reserve the right to appeal for non determination if you feel no progress is being made. -
What about organising your own delivery using a carrier that can provide either crane offload or fork lift? http://dorlingtransport.co.uk/truck-mounted-forklift-hire/?gclid=Cj0KCQjw29CRBhCUARIsAOboZbJMDKqPg7O7xXyXkNuY4qyYPs4R0AuROZaJab3n9Dssi3UNJz1I2vkaAuj8EALw_wcB We only have a gravel driveway so it's an issue for off loading heavy pallets from trucks that only have a tail lift. What I did recently was buy an 8x4 sheet of 18mm WBP and used that to make it smooth enough to off load a 1000kg pallet of limestone tiles using a manual pallet trolley. Guess a lot depends on whether you can get the lorry on site at all.
-
I think the approach I'm taking above gets me the same detail at floor wall junction without the risk.
-
That means your house is probably detached. You don't need prior approval unless your house is detached and the extension is over 4m or semi detached and over 3m. Probably not. It sounds like this would be Permitted Development (eg no planning permission or prior approval required). Did they say your original application would be Permitted Development when they approved it? To be sure its Permitted Development we would need more details or you would need to go through the rules here.. https://www.planningportal.co.uk/permission/common-projects/extensions/planning-permission And the relevant sections in the technical guide.. https://www.gov.uk/government/publications/permitted-development-rights-for-householders-technical-guidance If you want absolute certainty you can apply for a certificate of lawful development. It's similar to a planning application but the planners would just check it meets Permitted Development rules. They can't reject it on subjective grounds.
-
Are both hot and cold mains pressure or from a tank? Is it possible the hot water is flowing "across" the mixer back up the cold and filling a tank in the loft? Unlikely unless hot is mains pressure from a combi and cold is from a tank. Bit surprised you had to break tiles to get it out. With a lot of mixers the cartridge is replacable by just removing the face plate.
-
Looks like good work to me. I'm currently doing my bathroom and won't be doing the floor first although it will look like I did when its finished. I'm doing the walls above a support batten first, then the floor. Then removing the batten to do the remaining bottom row on the walls. I figure I'm less likely to drop stuff on the floor tiles this way. Is it worth suggesting she gets an inspection done by the tile association or is that opening a can of worms? https://www.tiles.org.uk/services/technical-inspections/
-
This reminds me my shed is the wrong colour. Needed PP as it's in a conservation area. Planners said they wanted it painted barn black. I sent a sample painted with black paint from my kids paint set which they approved. I actually painted it with Ronseal General Purpose Wood stain which is brown. Nobody has ever come to check or complained. I think it will soon be too late for them to take enforcement action as they only have 10 years to enforce a breach of a planning condition.
-
Planners rarely come and check unless someone complains. If there is a complaint the planners often feel obliged to get the situation "regularised". So they might send you a "notice of intended enforcement action". This may look scary but don't panic. If you get such a letter its important to contact them and ask them what they recommend you do. It might be they would be happy to ammend your existing planning grant to allow the wood stain. In which case ask how you go about getting that done. Can you just apply for a non-material ammendment? If they really insist you paint it white you could wait for them to actually issue an enforcement notice and then appeal it. Nothing happens immediately but there are deadlines for submitting appeals so dont put off responding. Its also possible to both appeal and apply for permission for the change at the same time. If permission for the change is refused you can appeal that decision as well. I think if they start insisting it's white I would discuss the issue with a planning consultant as to which is the best route to take. In the end it might come down to how much you want to spend as applications and appeals all have fees.
-
I think the bell cast above the gap should have been much wider and the top of the grey plinth sloped down and out. Something like this.. Perhaps this wasn't possible for some reason. Can you tell if the DPC is at the top or bottom of the gap?
- 44 replies
-
- timber frame
- plinth
-
(and 3 more)
Tagged with:
-
@nod looks like I need a new diamond blade for my Norton wet tile cutter. Got any recommendations for cutting stone (limestone/travertine) ?
-
I think Building Control normally want 225mm of cavity below the dpc. Google suggests this can be reduced to 150mm if weep holes are provided. At least the nhbc say so here... https://nhbccampaigns.co.uk/landingpages/techzone/previous_versions/2011/Part5/section1/sitework.htm That means you can/should start the cavity at ground level or below as the dpc is typically at 150mm above ground level.
-
OK so these are links to relevant sections of the planning portal rather than the actual legislation but they explain how the government intended it to work.... https://www.planningportal.co.uk/planning/planning-applications/consent-types/prior-approval https://www.planningportal.co.uk/permission/common-projects/extensions/planning-permission https://www.planningportal.co.uk/permission/common-projects/extensions/prior-approval
-
My understanding is that you submit your Prior Approval Application and if nobody objects you get the go ahead. If there are objections its effectively treated as a planning application and the planners decide if its OK. I don't believe you can apply for a CoLD instead. Those are determined by checking the proposal meets planning law. I'd be surprised if planning law doesn't require a prior approval application for large extensions.
-
Call me suspicious but... Is Properla actually an insulation or just a waterproof coating intended to stop water penetrating defective render thereby reducing its insulating properties (which arent exactly spectacular even when dry)? £9k seems a lot for waterproof paint. Perhaps I mussunderstand. Got any links?
-
Fencepost digging with a paddle mixer and auger
Temp replied to Tony K's topic in Landscaping, Decking & Patios
I've used this type in the past single handed. Best way is probably to find a mini digger and push in pointed fence posts with the bucket. Two man job but quick. -
On many houses they only render the wall above the DPC. At the DPC there should be a bellcast to form a drip line (reminds me of flared trousers). The bell cast slopes out and down on the underside to prevent water tracking back in to the DPC. You can render below DPC but not all renders are approved for use below DPC. The render below the DPC is normally thinner so that water dripping from the bell cast lands on the ground not the render below the DPC. It looks like they added external wall insulation at some point and used too thick a layer below the DPC? You can see how the rainwater downpipe touches below the DPC but not above it. I think you need to see how far back the concrete is below DPC. See if it will be possible to re-render with a thinner layer so the bell cast works properly. Might be necessary to remove insulation below the DPC before rendering or at least protecting the top edge better?
- 44 replies
-
- timber frame
- plinth
-
(and 3 more)
Tagged with:
-
Party Wall agreement and neighbours questions
Temp replied to Lk1980's topic in Party Wall & Property Legal Issues
The wording suggests someone (her surveyor?) has suggested she ask for them. Regarding point 3. I believe you actually have a right for foundations to undersail the boundary if strictly necessary (nothing must oversail)... https://stanleyassociates.uk/neighbours-basis-on-my-land/ -
Warm v's Ventilated Roof - Which Way to go ?
Temp replied to bob the builder 2's topic in Roofing, Tiling & Slating
OK so some people will call this a warm roof because the loft space is heated or at least on the warm side of the insulation. I prefer the term "warm loft, cold roof". This is a cold roof because part of the structural roof (the rafters) extend through the insulation to the cold side. The gap between the metal roof and the membrane needs to be well ventilated. This would involve using a ridge system that provides a full length vent with matching vent at the eaves. The vent at the eaves would be equivalent to a 25mm wide slot. The vent at the ridge would be equivalent to a 5mm wide gap each side of the ridge "tile". Insect mesh may reduce the effectiveness area of the vent so allow for that by making them bit wider. It shows counter battens and I would expect horizontal battens to be added on top of these to raise the steel roof further to form the gap. The membrane should be a vapour permeable type (Exoperm is breathable) and approved for contact with the insulation (I haven't checked). Metal roofs have a history of attracting condensation on the underside of the metal so I'd be tempted to increase ventilation above what normally recommended. Bigger vents at the ridge? As the roof supplier.