Have someone installing a corrugated roof and now comes the hard bit, with velux windows to be installed.
after explaining numerous times that only a nibbler could be used to do the cutting he went at it with a circular grinder and a 'special disc' he got.
anyway, this is the end product. We had a disagreement. He complained about the quality of the cladding numerous times even though it is widely used on houses and domestic buildings. Anyway, he left taking all tools with him
Any pointers or suggestions would be welcome
We can move that sheet one rise to the right as we were going for a double overlap
These are long continuous sheets. How do I get the flashing in under the sheet