-
Posts
30741 -
Joined
-
Last visited
-
Days Won
426
Everything posted by ProDave
-
I can finally drill! Oh wait. What is the matter here?
ProDave replied to Garald's topic in General Joinery
Once you have tried an SDS drill you will NEVER want to use anything else for masonry. -
I would not put a 100A fuse in your switch fuse as you have no discrimination from the DNO's 100A fuse. I have mine fused at 80A and have never had any problem with lack of power. If you re run the calcs at 80A you might get better cable size options. You mention 5 core so you are talking 3 phase neutral and earth, so no way will you ever require anything like 100A per phase if you have a 3 phase supply.
-
Any online supplier for non-standard sized MDF skirting?
ProDave replied to markharro's topic in General Joinery
But they would only be 2.4M long so more joints compared to buying MDF skirting. -
The point about the hiab is this is standard with most builders merchants trucks, they are used to unloading pallets of bricks, roof tiles, plasterboard etc. but before choosing to order from a BM one of the suppliers I was talking to would send it on a flat bed and would require something to lift it off on site. It would be well outside the reach of my small digger to lift it off a truck. I once tried to get a BM to lift a lintel off their truck straight onto the wall where it was going. They flatly refused. I used my digger to lower it into the hole and it took 3 goes to get it the right depth and level. This unloading thing when I was ordering windows, and negotiating on price, I found their standard delivery truck would require a crane or telehandler to unload. I did manage to negotiate delivery on a truck with a hiab at no extra cost. I really don't know why this is not standard in the building industry. Though I guess delivering to a large developers site there will always be some lifting gear available.
-
Any online supplier for non-standard sized MDF skirting?
ProDave replied to markharro's topic in General Joinery
Check the thickness but it might be a standard product from Howdens https://www.howdens.com/joinery/architrave/howdens-42m-square-white-mdf-architrave-obj-sku-family-mod0821 -
Gas network price rises heading to the UK (eventually)
ProDave replied to Mike's topic in General Alternative Energy Issues
So how are the French installing so many heat pumps and us so few? Are their houses generally better than most of the UK rubbish and better suited? Are there more skilled people there to fit them? Better grants? or what? -
This is the one I used, I note the company has changed their name, no longer Conder. You would need a larger version that one is up to 6 persons. https://www.drainagesuperstore.co.uk/product/rewatec-asp-sewage-treatment-plant.html In a lot of cases which one you choose comes down to availability where you are and transport costs. I ordered mine from Travis Perkins as they gave the best price including delivery by their own hiab truck.
-
Look up Biopure, Vortex, Conder ASP as probably the most common used by forum members. They work with an air blower agitating the contents so no moving parts down in the smelly stuff and usually the worst that can go wrong is the air pump will eventually fail so you just replace it or repair it.
-
I would have contested that planning condition and instead asked them to specify "private treatment plant" The Biodisk would be my last choice, moving mechanical parts that WILL one day break is not a good idea. Have you bought it yet? If not I would hold fire on ordering and let us recommend something better (one of the air blower treatment plants)
-
Best we continue this discussion on the thread in the waste & sewage section.
-
Yes, to feed ONE double socket. If that is all that is at the far end of the SWA than fine. However I suspect there might be more connected there.....
-
Can you post a plan of what pipes you have and where in relation to that the new pipe has to finish? Only with that can I tell if there is a better way. e.g going into the top of the soil pipe where you are suggesting means you can't then run your new pipe through the joists. That may or may not be a problem.
-
That is a spur from a ring final and not good for anything other than one 13A socket at the far end. Not a way I would advise anyone to do it.
-
So, lets say we find lots of "gold hydrogen" and mine it, and burn it to make some form of power or power vehicles. it "green" right, because it does not produce CO2. However burning it, WILL consume oxygen from the atmosphere, and it WILL emit water vapour. So there will be a little less O2 in the atmosphere and a bit more water vapour in the atmosphere. Has anyone modelled what that will do to the environment? My bet is people assume it's insignificant, and perhaps it is, but before we start mining and burning golh hydrogen it would be good to know it is not just going to create a different problem. How would the atmosphere behave with a little less O2? And where do you think all the water vapour emitted will end up and with what effect?
-
Is that temporary? Are you later going to fit a proper balcony that you can sit out on? (I highly recommend that)
-
You re think the entry route. You could do a potted waterproof connection, but it would be to some other cable of the correct size. Your challenge is to find a more flexible cable that is suitable for outside use. Try and get the SWA inside the house somewhere, through a wall not window frame, inside a cupboard or under the floor, then a junction to a more flexible cable is very much easier.
-
So no doubt about it, SWA glanded into consumer units at each end, and final circuits wired from garden room CU as normal. No need to bodge direct connections from SWA to flat.
-
Unlike Scotland, England has Part P of the building regs that requires a qualified electrician signed up with a competent persons scheme like NICEIC etc to sign it off. In theory in England you can pay BC to do the test and certification, in practice it is almost impossible to get them to actually do that.
-
More information needed. Best way is SWA glanded into a mini consumer unit and final circuit(s) from there with appropriate rcd / mcb protection. But you don't give us any idea what you are trying to do. Is the SWA already protected by a 32A MCB and you are trying to make a lollipop circuit?
-
I rate Octopus because their customer service is less bad than many others, and you are actually in control, you can set your DD amount or as others have said just pay actual bills, if you end up too much in credit you can ask for some back etc. So many other suppliers just choose their own random amount, make silly estimates, won't let you change anything and hold onto a large credit, and won't even discuss it. In other words Octopus allow the things you expect and would hope are normal, but so many people with other suppliers have plenty of horror stories.
-
My built in bin has a standard door with the usual adjustments. You can attach the door to the appliance, then adjust the feet to raise / lower the appliance to get the door right before you screw the appliance in place.
-
Choose the cable method between CU and outbuilding to not require an RCD you can connect it from a non RCD protected MCB in the CU. It will require a high integrity CU.
-
Built in appliance doors have almost zero adjustment. Fit that first and then adjust the other doors to line up with it. The fun starts if you have 2 built in appliances.
-
Let me start by saying an electric boiler is the most useless invention man has ever made. IF you are going to use direct electric resistance heating you are better off just with panel heaters and an immersion heater. Putting a big heater in a box on the wall and using water to move the heat around that will never make it more efficient. However it has given you wet under floor heating so that might be useful. No 1, separate out your space heating and hot water heating, before you can go anywhere you need to know what is using what. If it were me I would be fitting an electricity meter on the feed to the boiler, setting heating and hot water times differently NEVER on at the same time and taking lots of readings to see how much the HW and heating are using separately. How good are you at DIY? With help from this forum would you consider DIY fitting an ASHP? I have no idea what the regs are on Jersey but the parts are likely to cost no more than £5K and DIY might make it viable. You might be better off just with a good plumber and electrician that you can trust, and who are capable of reading an instruction manual, rather than a "specialist" heat pump company which is what I suspect you have been talking to? Do you know anything about the building construction, what levels of insulation for example, particularly under the floor? And what temperature is your UFH running at the moment?
