Temp
Members-
Posts
10684 -
Joined
-
Last visited
-
Days Won
43
Everything posted by Temp
-
If I remember correctly this scale of excavating would be classed as an "Engineering Operation" not covered by Permitted Development meaning planning permission would be required. I might be wrong though. The normal recommendation is that any retaining wall over 1m high should be designed by a Structural Engineer. Unfortunately the Party Wall Act may also come into play if you are digging within 3m (and possibly 6m) of a neighbours house. Try and avoid this if possible as things can get expensive. Keep the neighbours happy.
-
Porch Building Regs/planning permission
Temp replied to Annahb's topic in House Extensions & Conservatories
Planning Permission.. I would suggest that if you add a porch and remove the door at the same time then its not permitted development. Permitted Development rights allow you to "add a porch to any external door". However removing the door later appears to be ok as far as I can see. Building Regulations.. There is a difference between "complying with the Building Regulations" and "The need to make a Building Control Application". In general everything should comply with the Building Regulations. Its not always necessary to notify Building Control or make a Buiding Control Application. In the case of a Porch... https://www.planningportal.co.uk/info/200130/common_projects/46/porches/2 -
Fire Angel good customer service
Temp replied to Ferdinand's topic in General Self Build & DIY Discussion
Perhaps check the circuit breakers. If they aren't getting mains the battery will run down fast. Eg if the property is ever empty dont turn off the elec because the batteries will go flat in weeks. -
Fire Angel good customer service
Temp replied to Ferdinand's topic in General Self Build & DIY Discussion
The manual for some models mentions a 10 year warranty but retailers only seem to offer 5 years. -
I'd ask the companies that do the polishing if they've seen problems. I'm sure its the sort of things they do for hotels and conference centres. Perhaps they recommend round holes rather than square ones (as per the Comet)? Beware at doorways. Our screed cracked where the screed in two rooms met at a doorway. We should have put in an expansion gap to form a straight "crack".
-
I might be wrong but I think the regulations changed some years ago so that a house only has one "principle elevation". That change benefited houses on corner plots that previously could have two "principle elevations" making side extensions easier. I don't think this helps you but might others.
-
Changing interpretation of material change of use
Temp replied to hardya's topic in Introduce Yourself
The normal reason they go off at night is because its the coldest time of day so the battery voltage is lowest. I would suspect a power issue because I had a similar problem.. One month after we moved in we were woken up by the alarms chirping about 4am. The indicator light on one alarm said the battery was low so I replaced it. Few nights later another went off. Then a month later the first one went off again. Our alarms use a 3 core and earth cable for Live, Neutral and Interlink (don't think earth is used). 3 core and Earth cable has cores in Brown, Black and Grey. Somehow our electrician had forgotten which colour was which and the alarms upstairs were wired differently to downstairs. Swapped the wires so upstairs matched downstairs and it all works perfectly. The incorrect wiring meant they were running on battery all the time. -
If your architect has a 3D model of your house and understands 3D printing it might not be too expensive. Otherwise someone has to create a printable CAD model. Thats not something most 3D printing services get involved with. Once you have that its probably not too expensive. If I was getting one done I'd want each floor and the roof printed separately so I can take it apart. One issue is with colour. Most 3D printing is in monochrome and that tends to make features less obvious. For example on a CAD model the window frames may stand out because they are a different colour to the brickwork. On a monochrome 3D print the frames may be far less obvious. I suppose you could easily paint it though.
-
I think that's going to be considered "non-standard construction" by the Mortgage industry. I would seek advice from a valuer/estate agents to see what impact it might have on the final value. Might be worth knocking it down and building a semi or even two detached houses. https://www.homeprotect.co.uk/non-standard-construction-insurance/buying-a-non-standard-home
-
Regarding cavities... The Building Regulations are somewhat vague but they are the ONLY legal requirements. The so called "Approved Documents" is what most people work to.. https://www.gov.uk/government/collections/approved-documents These outline ways of meeting the Building Regulations. They are not legal requirements so you are free to adopt other ways of complying, however BCO sometimes treat them as if they are mandatory and the only way of complying. Approved Document C covers water ingress.. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/431943/BR_PDF_AD_C_2013.pdf Each Approved Doc has a section in green near the beginning that references the relevant section of the Building Regulations (the law). In this case see page 5. Diagram 11 on page 33 covers external insulation. If the walls are concrete I would suggest the nearest option is top left (External Insulation of solid walls). Thats EWI with a cladding board and render or similar waterproof "protective system". However there is a section for "framed" external walls. This was probably intended to refer to timber framing but the BCO might interpret it to mean any type of framing (eg concrete posts and concrete panels). That option is EWI, Membrane, Cavity, Cladding. You will have to propose whatever external cladding solution you want and see what the BCO says. As for how thick the insulation deeds to be that's a whole different ball game and I'm out of date with the figures.
-
Some Building Control Officers will try and tell you a cavity is necessary but that's not in the Building Regs. Of more concern is what mortgage companies think. If they see it as a "non-traditional construction" then buyers will have a harder time getting a mortgage and valuations will be lower. What sort of foundations and floor has it got? Is it just a timber frame sat on a concrete slab like a shed or does it have proper trench foundations?
-
Upgrading Wirsbo Cosy stats to programmable stats
Temp replied to Brix's topic in Underfloor Heating
I've had a quick look at the wiring diagram for "a" Wirsbo Cosy 24V stat... https://www.uponor.co.uk/-/media/country-specific/uk/download-centre/support/manuals/legacy/cosywirsbo/cosy-wired-manual.pdf?la=en-gb&hash=B38C92FA92FB3D52591E387F7F3D06AC2A380540 and the Danfos TP5000M 24 Si. https://assets.danfoss.com/documents/DOC041186407154/DOC041186407154.pdf I think you would need a wire link in the TP5000Si but otherwise I reckon they could be used to replace the Wirsbo Cosy stats. I believe the existing stat has.. Terminal 2 → Phase 24V Terminal 3 → Switched phase Terminal 4 → Neutral 24V The TP5000M 24 Si has.. A → 0V B → 24V and relay contacts.. 1 → OFF 2 → Com 3 → ON So I think the wiring would be... Wire TP5000M 24 Si Contacts Phase 24V --------------------------- B and 2 (eg using wire link) Switched Phase ------------------- 3 Neutral 24V -------------------------- A I recommend taking a photo of the back of an existing stat before disconnecting any wires. Oh and turning off power to the whole system but that's obvious. -
Perhaps ask them if the HTRS230 is a direct replacement for the ERT32 https://salus-controls.com/uk/product/htrs230/
-
Stairs, building regs.
Temp replied to Russell griffiths's topic in General Self Build & DIY Discussion
The key thing is to try and make the going and rising the same for all steps otherwise it becomes a trip hazard. This requires careful planning if you are adding steps to an existing staircase. -
Perhaps someone used car under sealer ?
-
Some thoughts.. Most likely it will need more insulation both thermal and sound. Part L for thermal and Part E for sound. The roof overhang looks a bit small for external wall insulation so the roof might require mods. Is there insulation in the floor already? As for sound insulation I think walls between separate flats need to meet Part E1 (walls between rooms in the same dwelling need to meet E2). There is also a section E3 for walls separating dwellings from corridors. This summary is from somewhere that wants to sell sound proofing stuff that you may not need but gives an overview of the regs.. https://www.soundproofingstore.co.uk/how-to-pass-part-e-building-regulations The wall between the two dwellings will also need to be 60min fire rated (I think) and extend up into any roof space to prevent fire spreading from one to the other up there. Think that need either one layer of something like Gyproc Fireline or two of ordinary Gyproc wall board each side. The electrics will need separating into two with two meters etc. Ditto water and ideally sewerage. It looks like the windows only have top openers? Some may have to be changed so the bottom opens to meet fire escape regs. But perhaps all the windows need changing for other reasons? Got any oil storage tanks near?
-
Never used them but this place appears to sell small quantities.. click on pic of bricks then whers it says "choose" you can change it to "corner packs -...".. https://mybrickwall.co.uk/?gclid=CjwKCAjwlID8BRAFEiwAnUoK1V6bVP0jrr9iR1Wf-cMXK4uLC0iBs6RNE9RgZ34vYfxWwadzxlHkeBoCEroQAvD_BwE
-
My understanding is that until the end of the year you should pay ROI VAT and freclaim it like any other material you buy. The big unknown is how VAT is processed after the end of the year. My understanding is that in the event of a no deal exports to the UK should be ROI VAT free and UK VAT will be charged when the goods arrive in the UK. Then you reclaim the UK VAT. The problem will be if the supplier won't export VAT free. My guess is you will have to pay both and only be able to reclaim the UK VAT. There may also be UK duty to pay on goods arriving next year and that cannot be reclaimed. I would make sure delivery is well this side of year end.
-
Last i heard house building is back to precovid levels so perhaps suppliers have been caught short of stock?.
-
That's unfortunate. Means the bco may want a 50mm deep ventilated void between membrane and insulation to avoid interstitial condensation.
- 9 replies
-
- loft insulation
- building regs
-
(and 1 more)
Tagged with:
-
Hello! I've bitten off more than I can.... (SIP Office Room)
Temp replied to Jamie McNaught's topic in Introduce Yourself
Possible insulated roof panels.. https://www.panelsell.co.uk/insulated-roof-panels?source=google&medium=adwords&campaign=1614494041&adgroup=62109888958&keyword=insulated roof panels&matchtype=e&adposition=&device=t&network=g&gclid=CjwKCAjwlID8BRAFEiwAnUoK1bB9upYPK1cPN1_smpBo1Oyz_koIJikm6xUO6Dz63dWeO66Hd_rhWRoC--cQAvD_BwE Add more insulation below. -
Although stepped flashing does look good when done right.