Mr Punter
Members-
Posts
8214 -
Joined
-
Last visited
-
Days Won
24
Everything posted by Mr Punter
-
Makes me itch just thinking about it!
-
Hello Robert and welcome. What a pain with the other plot! Are you planning on doing any of the work yourself or do you want to hand the whole job over? Do you have a build type in mind (timber frame, brick and block, ICF)? Often the architect will have worked with a couple of contractors so this may be a good place to start. Passivhaus involves more than just gaining planning consent and a standard building regs application, so your architect will play a vital role. Make sure you have a good relationship and understanding of what both parties expect of each other. Have you seen examples of their work and talked to other clients? Also, do they tend to get repeat business? Demolish and replace is very expensive, so be very clear on exactly what you want and make sure that is what is delivered. I am a small scale developer in Sussex and will be happy to give you any pointers where appropriate.
-
38 x 50 is one of the normal sizes for treated external batten. You can probably get a planed untreated version about 4mm smaller.
-
I think that the Euro is not likely to rally if we leave with no deal, so there may be little change in GBP v EUR. I understand that the WTO tariff is 3.8% so if you import 65% of your materials it would add 2.5% to your materials cost. Assuming that materials are half the total, it would add 1.25% to your build cost.
-
Scaffolding and things that go bump in the night
Mr Punter commented on Triassic's blog entry in Mr and Mrs Triassics New Home
I heard of someone who had a large number of oil heated greenhouses. Thieves came in and just cut away any copper pipe in all the buildings, leaving the oil to spill through the open ends. The cleanup costs were greater than the value of the farm and thousands of times greater than the value of the copper. Can you not use the oil for a diesel car or site plant? You may need to mix it 50:50 with proper diesel as it is often kerosene which is less lubricating. Also I note you are using a crane. Would a telehandler be more flexible and less expensive? -
What are the resale values for the flats?
-
We have had PIR factory fitted but that was walls only - we still had to do rafters. You maybe could get the roof done if it was made cassette style.
-
With a zinc roof we had they used a membrane that had a layer of plastic sort of like thick pubic hair bonded to it to the zinc was not in full contact with the membrane.
-
Cutting down a TPO tree by mistake - Enzo's homes
Mr Punter replied to Moonshine's topic in Planning Permission
On the basis that the tree weighs hundreds of tonnes, are they seriously suggesting they will be able to replace like-for-like? -
I first heard of the weak mortar issue years ago. Sometimes it was 1:15. The solution proposed was to rake out and repoint. My concern would be the remaining 80mm of the brick and all the block also laid in defective mortar.
-
Flexible pipe for awkward temporary foul drain connection.
Mr Punter replied to epsilonGreedy's topic in Waste & Sewerage
Rather than a tee, do a y and a 45 from the drain, so to temp connection is in the right direction. -
Achieving a clean square cut with plastic 110mm pipe, how.
Mr Punter replied to epsilonGreedy's topic in Waste & Sewerage
The 10mm gap is really good on soil stacks as the expansion / contraction of the pipe can cause noises. Probably not an issue with below ground stuff though. -
Flexible pipe for awkward temporary foul drain connection.
Mr Punter replied to epsilonGreedy's topic in Waste & Sewerage
Put a tee on the main run, pointing up. Run your pipe to the tee with a 90 bend pointing down and connect the two. Cap off the tee when you disconnect. -
And the cons of metal: Sharp edges Cable routes need grommets through studs Not structural - need timber around doors etc. More tricky to fix to More tricky to cut Can rattle Difficult to separate from plasterboard when demolished
-
Achieving a clean square cut with plastic 110mm pipe, how.
Mr Punter replied to epsilonGreedy's topic in Waste & Sewerage
Use a chop saw and finish the last bit with a slightly blunt hand saw. -
I have brick and block on the ground floor and timber frame 1st, 2nd and 3rd. Same spec of heavy doors throughout. I don't notice better or worse sound transmission. If slamming is an issue you can get some strip that fits to the stops that dampens the final few mm and stops rattles and slams. For room-to-room, look at doubling up plasterboard if you go TF and seal the bottom of the board with mastic before you put skirtings. Strengthwise TF is fine. Make sure the frame designer knows what you are putting and where. A lining of 18mm OSB is usually fine for most loads and really stiffens up the wall.
-
Joist Hangers: too many holes?
Mr Punter replied to ToughButterCup's topic in General Construction Issues
You need a special PPN nailer for this to work. -
Just moving the house a few degrees & making holes
Mr Punter commented on Adam2's blog entry in Wedding Cake Re-build
I assume you will wait for planning before you commence demolition? Have you had an asbestos survey? It is worth making sure this is very thorough, as if any is present you will want to get it removed all at once, rather than piecemeal. -
The POSIs Picnic: a solution is in sight.
Mr Punter replied to ToughButterCup's topic in General Construction Issues
@recoveringacademic I just want to check that you are aware that the proposal from Cullen only allows an extra 25mm extension to each end of the joist - 50mm total. In your earlier posts on this topic you suggested that the joists were 100mm short. -
Have a look at the contestable elements of the £40k quote and see if you can get it done for less. Also have a look at @JSHarris's experience with a borehole water supply - not always at all simple.
-
Cabinet Interior- Varnish, Lacquer or Oil?
Mr Punter replied to Tin Soldier's topic in Kitchen Units & Worktops
Did you diy these? Any chance of some photos inc with doors / drawers open & closed?