-
Posts
31390 -
Joined
-
Last visited
-
Days Won
346
Everything posted by Nickfromwales
-
Manifold system versus hot return system
Nickfromwales replied to Russell griffiths's topic in General Plumbing
It’s just an extra pipe or two, a pump, and some basic controls. -
Manifold system versus hot return system
Nickfromwales replied to Russell griffiths's topic in General Plumbing
It costs a few quid to service the essentials, kitchen / utility / wash basins in each bathroom ( and nothing else ) and costs pennies to run if insulated / installed properly ( and even less in a house with PV ). It’s nice for the low volume / high frequency outlets and not fitting a HRC is nuts imho. Why not give yourself a bit of convenience and “luxury” ?!? Think about how much you spent on an architect and how much the doors and windows cost, and then get a reality check on the penny pinching -
Your builder is tiling? Good stuff. Just switch the heating on for 48 hours and run it at around 30oC. What will be will be. ?
-
Doing that cycle is referred to as a “thermal shock” of the slab. I wouldn’t be worried about that. The fact it’s Anhydrite is the worry. Has it been mechanically abraded after curing? There will be a scum layer that will stop anything sticking to the screed that needs to be dealt with, as nothing, and I mean nothing, will stick to it. Ditra, tile adhesive, primer, nowt. I’ve been on jobs where 80+m2 of floor tiles are able to be lifted up with just the grout holding them together. Ask questions, get answers
-
Set 4 M12 threaded bars into the basement slab where you intend to mount the internal unit. Sleeve the bars with self adhesive neoprene insulation tape to minimise cold bridging, and then finish laying the floor as per above. Then fit uni-strut to the bars and anti vibration mounts to that, then the unit.
-
Got to be a crap install to half the CoP. The low loss pre-insulated pipe is very good, as long as it’s integrity isn’t compromised ( outer sheath punctured and then the internal pipes get water logged / poor detail at terminations etc.
-
Pressure testing new plumbing with air
Nickfromwales replied to islandboy's topic in General Plumbing
And water is obvious in seconds. Shows itself vs you having to go around every inch of pipework with a leak detection fluid. PITA vs water. ?. FYI Water testing shows a leak WAY before you get to even 0.5 bar so doesn’t need to be spraying everywhere and causing ‘mass devastation’ so don’t fear that. A bit of blue roll and some mopping up is the worst that’ll happen. I’d rather see the problem there and then and get it identified and dealt with, and that’s been the method I’ve used for the last 25 years. Commissioned a system last week and pinched 2 drips up whilst pressurising. Drama = zero. -
Noise is one. The internal units can range from sounding like a very noisy fridge to sounding like a really quiet washing machine. Choose well and with units that have good reviews / live feedback from such adopters. The one I was I a absent with would have pissed me right off of it was ANYWHERE in my house ( other than the basement ) as it was annoyingly noisy / vibrations etc. That was a Daikin iirc. Re temperature, you can select a ‘high temp’ split which will go north of 65-70oC with ease ( reliably ) as the one I worked on had to go above 65 to melt the PCM58 in the trio of SA units. Did that PDQ too.
-
Do you have a monoblock? Do you have an internal compressor unit and THEN an UVC? OP is asking about a true split system which has the compressor indoors ( like a GSHP does ).
-
GRP (God-awful Rubbish Period)
Nickfromwales commented on canalsiderenovation's blog entry in Canalside Bungalow Renovation
My only concern is has water got into the OSB / ply with the delaminated bits we’ve seen so far? They need sealing up ASAP before getting on with next weeks distractions. -
GRP (God-awful Rubbish Period)
Nickfromwales commented on canalsiderenovation's blog entry in Canalside Bungalow Renovation
? @SteamyTea Do you think they’d be better off feathering in a fall with layers of mat and gel coat? Doesn’t look like it is “miles off” to me? A competent GRP installer would be able to advise, and won’t be a compromise on quality but would be a heck of a lot easier than laying a firred roof over that again. -
The force is strong with this one.......
-
MVHR Ducting
Nickfromwales replied to ZacP's topic in Mechanical Ventilation with Heat Recovery (MVHR)
https://www.rubberco.co.uk/selectedsize/sound-proofing-and-deadening-rubber-sheet-linear-meter/4103?gclid=Cj0KCQjwqrb7BRDlARIsACwGad7BaSmHXn3AA732nmgLKChgqw2yeRS1uwnXpcLV6lmTTU8fJwVzGA0aAp0vEALw_wcB This stuff takes a lot of the foot traffic / other impact sounds down a good few notches. Deffo go for acoustic batt and double up on acoustic boards or resilient bars and one layer of 15mm acoustic board. As said, dealing with the detail at the perimeter is often overlooked. Stuff some loose rock wool in there to plug everything up nicely. -
MVHR Ducting
Nickfromwales replied to ZacP's topic in Mechanical Ventilation with Heat Recovery (MVHR)
Get them at 400mm centres apart MAXIMUM. There is very obvious bounce ( aka deflection ) at 600mm c’s. Asking for an extra run of strong-back won’t go amiss either and is pennies in cost terms. -
MVHR Ducting
Nickfromwales replied to ZacP's topic in Mechanical Ventilation with Heat Recovery (MVHR)
You’d still need to be able to get small bore services around too, so a service void is inevitable. The design logistics in the pre-ducted / pre-serviced slabs would be off the chart. And if you’ve got it wrong you’re Donald Ducked. -
MVHR Ducting
Nickfromwales replied to ZacP's topic in Mechanical Ventilation with Heat Recovery (MVHR)
You can switch to rectangular ‘D’-shaped ducting to reduce the profile, and then make the service void under the 1st floor B&B a bit bigger to accommodate it. Run the ducts from the rooms back to the plant and then assign which duct does what, to make things easier on logistics as you won’t be able to have any crossovers if space-constrained. M&E design / foresight is critical in a B&B dwellings, so if that’s not been applied at a very early stage you may end up doing series vs radial eg if you are seriously struggling to get from attic > ground floor. -
GRP (God-awful Rubbish Period)
Nickfromwales commented on canalsiderenovation's blog entry in Canalside Bungalow Renovation
Yup. -
GRP (God-awful Rubbish Period)
Nickfromwales commented on canalsiderenovation's blog entry in Canalside Bungalow Renovation
It needs to be with him and you two, alone in the quiet, no distractions, and with the graveyard expression on both of your faces. And just stick to one goal, roof off, and then do it properly via a company that has an insurance policy that covers that type of work. ( and the skills ). -
https://www.calor.co.uk/gas-bottles/advice/storing
-
Crossed with the old boy....
-
Ola. The question is a more complex than it first appears. I would not want to fire my ASHP, then wait for it to reach optimum operating range, then warm through all the inter-connective pipework, have those associated losses / wear and tear / fatigue etc vs just energising a docile immersion heater which is 99% efficient in what it does. Excess PV is delivered in pockets, so ( IMHO ) is unsuitable for your proposed application. KISS wins every time.
-
She needs to start considering other people's needs mate. Just tell her, "I'm a man, not a machine" ?
-
Buffers can have a coil, so sorry if wires crossed here. @LA3222 have you seen a particular buffer that you are referencing here? The Jaspi store is one such beast IIRC. http://www.northmangroup.co.uk/Ultra500.html
-
With 2 floors of heating you are correct, and I would not put that much through a coil. The buffer needs to be 'man enough' to accept and discharge the required heat influx / outputs as required at any one time, so sizing will be important. Small heat source = bigger buffer and vice versa.
