  1. If you wave the watercourse and can get a discharge permit (a LOT easier in England than in Scotland) I would do that without hesitation. We were directed to use a partial soakaway system, and I have to say it works well. This is a small infiltration field, very much smaller than you would normally use, and the far end of it discharges to the burn. What happens in practice is the partial soakaway absorbs a lot of the discharge, particularly in summer when hardly anything goes into the burn. Even in winter, it has the effect of acting a bit like a sponge so there is no sudden discharge when you let a lot of water go, rather a steady but slow (barely ever any faster than you can pee) but more constant discharge.
  2. Another "issue" with the standard baths we fitted at the last house was the pre drilled tap holes seemed overly large. The bath we have for the new house, does not have pre drilled holes, I will have to drill them, and I will make sure the holes are only just large enough giving a greater area for any sealing washer to sit on.
  3. I would only add that as above, if you choose an electric plant, you choose one that uses the aeration principle. I have seen the ones that have mechanical rotating parts, motors, gearboxes and pulleys in the "works" of the plant and thought I would not want to be the one replacing any of those parts WHEN they fail. I also saw one where the infiltration field had blocked and the tank had over filled completely submerging the motor.
  4. My normal philosophy is to try and crack it open with the tank full. If it moves I proceed. If the tank starts buckling, then I abort and advise the customer a new tank is needed and hand the job to a plumber.
  5. Take care when cleaning off the remains of the old fibre washer not to scratch the surface of the flange. You want that to be nice and clean and flat.
  6. In the last house, the source of bath leaks was the incredably poor standard sealing arrangements around a bath tap. When showering water splashing around the taps would occasionally leak through and drip under the bath. They are now sealed to death and don't leak any more.
  7. Try to slacken the heater a little bit while the cylinder is full. At least get it to turn a bit so you know it will undo. Once the cylinder is empty the force needed may move the cylinder if you have not cracked it first. Have some towels ready as once cracked it will likely weep a but until emptied.
  8. I had the foresight to include them on the planning application, knowing the trees create too much shading for a roof system.
  9. There is a lesson from this. In Scotland you can get a certificate of temporary habitation when the building is nearly complete. Hmrc will take this as evidence of completion. If you then miss the 3 month deadline for the VAT claim, then wait until you get the actual completion certificate and that gives you another 3 month window.
  10. Hi and welcome. How about making a post in the Introduce Yourself section to tell us a bit about you and your project? Are you planning to discharge into the watercourse or into a soakaway? Building control have limits on how close a treatment plant and soakaway can be to a watercourse. I briefly looked at non powered plants but space was limited for us, and all the one I looked at were 2 stage systems and took up a lot more space than a simple air blower type treatment plant. Is it the energy saving that bothers you with a powered unit? If you later want to add a second property, make sure the system you installed is designed for the total occupancy you expect. If you use the search facility and search for "clearfox" it has been discussed before and I am pretty sure at least one member ha installed one.
  11. I don't see an issue. My "warm roof" has insulation over the rafters AND insulation in between them. This seems pretty normal on most builds now, and the design was accepted by building control. So I don't see why adding extra insulation as you suggest will cause an issue.
  12. about 18 years ago I worked for a company that made laser machining tools. One of the machines we made was for processing these small "roof tile" panels. I still see no sign of that product hitting the mass market. I suspect the huge number of interconnections and how to make them reliable and simple is the issue.
  13. Very true. But in my case it will all be ground mounted, so for me very cheap to make suitable frames and fit the panels. But I suspect an MCS company might force me to use a very expensive proprietary ground mount frame instead. I will look into it when the time comes. I might be able to do what I did last time, and install it myself on behalf of the MCS supplier. In effect I became an unpaid employee of the company for 2 days and installed it myself and they charged me a much lower rate just for the paperwork, but it is not easy finding anyone that will do that.
  14. The issue is what do you want? Solar PV generates power when the sun shines. That is not necessarily when you want it. If you have the freedom (retired, work from home etc) then you may well be able to use all the big appliances like washing machine etc in the day and heat your hot water in the day. For space heating, the problem is there is not enough sun when you need it most in the winter and possibly too much in the summer. In the past that was neatly solved by the FIT. You got paid for what you generated, so it didn't matter much, you were in effect using the grid as a battery. But now the FIT is so low, you get paid a lot less than the import rate. This brings into question is it now worth signing up to the FIT? My belief now is probably not. It's possible to buy a 4KW complete system for just over £2K and install it yourself. It would probably cost more than double that for an MCS install to claim the FIT. A quick search suggests at current FIT rates you are looking at a 14 year payback time. So you have to question is it worth it? Personally I intend to install at least 4WK of panels, sourced as cheap as I can, and DIY installed. I will focus om maximum useful yield rather than max total yield, siting one string facing east to start usable generation as early in the day as possible, and the second string facing south to take over as the sun moves round. Possibly a third smaller string facing west as well. That will reduce the total yield, but give a slightly more even and longer usable yield making the chance of self usage more likely. And the other element is looking at battery storage to try and store some of what I am unable to use.
  15. My "out of the box" solution is a drip tray where you expect the leak and 2 electrodes to detect the presence of water.
  16. It's no harder, probably easier in fact than a normal system boiler. Some plumbers may shy away believing it to be complicated. The expensive myth comes from the fact that in order to claim the RHI subsidy, you must have it installed by an MCS registered installer, who for some reason seem to charge a lot more than an ordinary plumber might (my plumber friend paid in the order of £10K supply and fit for his ASHP and HW tank). With a well insulated modern house it is doubtful of the RHI payments would even cover the extra cost of employing an MCS registered installer.
  17. "He also has his own £18m grand project: a development of 109 new-build homes in Oxford. It will perhaps be a bigger challenge than most Grand Designs. McCloud's company, Hab, is aiming to create low-cost, affordable and sustainable homes that embrace an eco-vision that includes car clubs, cycleways and food collectives." Is that Graven Hill, or somewhere else?
  18. having spent a week in a house with this sort of shower I would say I would most definitely NOT want it as my only shower. Personally I hate water falling on my head all the time with no option to get your head out of the water. Give me a wall mounted adjustable spray head any time, I can wet my head when I choose and just wet my body when I choose. All I am saying is find someone with this sort of shower and give it a try before you comit to that as your only shower. You may like it, you may not. As for the coloured lights. Pointless.
  19. Excellent news and a real world example of the much improved air quality that mvhr provides. It would be interesting to know which mvhr unit, and is it standard filters or did you specify special filters?
  20. We are having an external balcony. A timber structure supported on 2 legs and fixed to the wall. It gives the outside space for the few days you can use it without any compromises to the room. We did consider extending the roof out above it but decided the extra complication and expense was not worth it. After all if the weather is right to use it, you won't need a roof over it.
  21. I went for 38 degrees rather than the building regs max 42 degrees. How many more years will that give me?
  22. Forget electric showers unless you like showering under a dribble. If mains gas is available then it's a no brainer. Decent size combi or system boiler and unvented hot water tank. I would go UFH Wet UFH downstairs, radiators everywhere else with individual trv's so can be turned up / down / off as required or even UFH throughout on all floors. Remember a key feature of UFH is an individual thermostat for every room so unused rooms turned right down and your bedroom set to your cool temperature.
  23. ProDave

    Hello

    Hi and welcome. The Sun amp's main feature is much lower standing heat loss and smaller size than a conventional tank. There are several on here using them. I think most here would suggest quality tripple glazed windows. The likes of Internorm, Nordan, Rationel and many others are all worth considering. A lot depends on any special requirements and what finish you want. Remember if having mvhr order the windows without trickle vents.
  24. Absolute minimum of 2, otherwise what do you do when No 1 is on charge. If you are only using 1 tool at a time that would suffice. But if you have a helper using another tool at the same time, then that need 2. So simple answer is 2 per tool in use. Now determine how many tools are likely to be in use at any one time.
  25. It's the cost of some battens. You will have the OSB anyway (or whatever you change it for) so omitting the service void just mean you put the plasterboard straight onto the OSB. It then makes it a pain to run cables through the frame (drilling the web of the I beams) and then cutting through the OSB and plasterboard for back boxes. Then there is the issue of making it all air tight. I have omitted the service void in a couple of places where I know there are no services (stairwell head wall and bathroom outside wall) just to gain an extra 25mm in the rooms, but all other rooms have the service void.
×
×