Jump to content

TonyT

Members
  • Posts

    2943
  • Joined

  • Last visited

  • Days Won

    6

Everything posted by TonyT

  1. 2 coats of emulsion is a vapour barrier
  2. Keep the shower 50mm
  3. https://assets.publishing.service.gov.uk/media/5a80cf9ded915d74e33fc8ae/BR_PDF_AD_H_2015.pdf
  4. https://octopus.typeform.com/to/UAbK9bRq?typeform-source=t.co does this mean you can get export?
  5. https://www.uksealants.co.uk/illbruck-fm330-air-tight-expanding-foam-gun-grade.html?gclid=EAIaIQobChMIrYbPjcDQgQMVlMPtCh0MVQRaEAAYAiAAEgKHefD_BwE buy shares in the company. I have a storage heater on a smart plug to set a timed schedule, it also lets you see energy etc. helps keep a background heat.
  6. https://www.ebay.co.uk/itm/254556014381?var=554264886840&gbraid=0AAAAAB_7XZzG61wSMyptt9T-Mmj6UU3oL&mkevt=1&mkcid=1&mkrid=710-53481-19255-0&campid=5338723872&toolid=20006&customid=0y64364ZAAAAYA5quGnTslCGAwQAAAAAAA Connect a desk fan to it, and keep the magic smoke in the inverter
  7. I’d go with the hiring of the unit first as posted earlier, as starting currents on generators can be a funny thing. as always start the generator, let it get warmed up and then apply load, too many dafties, turn generator on, then apply full load and it dies… they then give negative Amazon reviews due to the lack of brain cells/ not reading manufacturer instructions
  8. Use a switchbot for remote switching!!
  9. I have 3 m high floor to ceiling heights, i just used standard 2.4’s once plastered no one can tell
  10. To the OP what do you pay for electricity? Do you have a cheap night time tariff?
  11. What does the manufacturer data sheet say? good starting point
  12. Your welcome
  13. With pieces of metal welded to the parts of the post that will be in concrete to give extra strength.
  14. The OP advises it’s a solid wall
  15. Double sheet the plasterboard 1st layer hides the expansion gap
  16. Don’t you need ventilated spaces incase of a leak?
  17. No, I think you have no specification, so it’s your word against theirs.
  18. Sorry I’m confused did you ask for a price to complete the work and specify a time frame?
  19. Until you provide some more details to provide insight into what you are building, paint it when it’s dry would be the obvious answer. i
  20. Fit some 18mm ply wood behind the TV bracket area, best to ensure a decent fixing now than faffing about with plasterboard fixings..
  21. Good to see good work being installed no matter that it’s in a cupboard. Looks great!
  22. Just buy a roll of red and blue insulating tape, to mark pipes
  23. Do Nothing apart from feed the hedge with fertiliser/ feed.
  24. Aerogel?
  25. What are those strange to me at least blocks with holes in them? not seen them before
×
×
  • Create New...