  1. When you're done it think you will wish you bought the off the peg one! Sounds time consuming and will you get as good finish paint wise? A local joiners shop might be able to do you the corners on the spindle for a drink. I've used half inch router cutter does about 35mm radius was a bit of a beast
  2. Not usually accepted on deeper founds. Might be best off excavating an concrete before deciding on slab/floor. Bco might only make you go 1.5
  3. Not much good for mvhr a drop down seal. Check out bwf fire regs @AnonymousBosch think 10mm under a door is within spec. As said though I'd be questioning why you have fd30 in your 1st floor
  4. Good video. Missing a bit of detail. Has he worked those plenum heights out to finish bang on ceiling height or cut them pre boarding? Would be a bit of a pig to cut afterwards. How come he's halfway between first and second fix. Ceilings taped and jointed but studs exposed elsewhere. I presume it's also important to cover plenums while plastering and decorating?
  5. I don't think the chipboard will expand too much. Like when you leave 10mm expansion on things that you also have to nail. I'd be suprised if most chipboard would expand any more than 3 or 4 mm round the whole perimeter of a room
  6. What about sole plate ontop of chipboard how much weight is in your partitions
  7. Never seen it. Seems a bit rough
  8. In reference to previous weeks post don't think ashp will graduate to mainstream until they are fit and forget. I wouldn't have the knowledge or understanding on how the fit an external pump or correct a software error. What chance does a non building person have?!
  9. When I fill up to test i leave full till backfill if poss
  10. Is there any difference in deflection or stiffness between posi and I joist
  11. Claim undelivered should read
  12. I used to be the type who would claim delivered but changed a year or two ago. Try to keep good karma now plus @Construction Channel has a point. I hate going anywhere to collect a parcel and it's only that way because society is knackered because we have no conscience
  13. *toplite etc
  14. Surely you can all figure out airated. Its the type that look like a aero chocolate bar with bubble like appearance. There are various manufactures which make them hence different product names celcon took its etc. Lightweight conc, sense conc then isn't there like a hybrid light conc with expanded clay @PeterW @Brickie @Declan52 ? I've used ultralytes on latest place
  15. Leave them to do it in their own time. Surely you're not going to blow the dough each month because they aren't asking for it?!
  16. Are we talking airated or lightweight conc?
  17. I think op is specifically talking high performance frames where vapour barriers and condensation points etc etc
  18. Oz07

    First Blog Post

    How long have you been following the forum? Did you get any prices for insulated raft?
  19. Depending on what local authority I don't know of CIL will apply. I'm in Leicestershire and upto 2years ago we were still paying open space s106. My most recent planning had no CIL or 106. We must be a deprived county!
  20. Yeh it won't be the norm as you say. But everyman and his dog are after a plot atm
  21. I know a mate who bought in around 2011. Site had decent planning history. Bought for less than 10% gdv. Made a decent sum tax bill was 6 figures
  22. * at this stage in the cycle. Time will come again when nobody has the appetite
  23. Appreciated nod what are u paying for the membrane? I prices it up the osb is near on 3 quid a m2. By the time you buy membrane and tape was coming out more expensive and I think fiddly/harder to Do. Like I say not trying to achieve and super performance just enough to make the mvhr worthwhile
  24. He's saying why use osb. I'm thinking if it's good enough for @joe90 it's good enough for me I'm not trying to beat the world
×
×
  • Create New...