Finally got round to doing the back garden.
dpmiller replied to Declan52's topic in Landscaping, Decking & Patios
Nice work @Declan52 -
Try this side of the Pond too.
-
CCRS Recovery did it, fast and efficient. Heartily recommended!
-
No, not unseen. I've had a good look round it and everything seems to work and it's dry etc. No doubt groundworks Paul will proclaim it a total donkey when he sees it but I'm sure it'll do just fine.
-
Well for better or worse I've dealt on a 3t Takeuchi. Having trouble now getting it shifted as a. it's the silly season and b. machine +buckets+spare track+ trailer is a bit heavy even for a Disco or such. Need to get it from Aghalee to Ards, any contacts?
-
LG Therma V mono block Air Source Heat Pump
dpmiller replied to ProDave's topic in Air Source Heat Pumps (ASHP)
sounds like you want your stats/programmer to operate the motor valves and the microswitch to then command the ASHP? -
Board lifters aren't too dear.
-
site security - 3G wildlife cameras??
dpmiller replied to Tom's topic in Networks, AV, Security & Automation
I've a similar one and yes, it does what it says on the tin. -
Of course, you mean GB and NI...
-
The Build - moving forward.
dpmiller commented on Redoctober's blog entry in Our Journey North of the Border
Screed looks great! One question. If the frame uses TF200thermo inside and out, is there a VC layer as well on the inside? -
Blockwork done for now, about a thousand in. All on hold for now until the steel posts come in and are fitted.
- 367 replies
-
- 2
-
-
- ireland
- timber frame
-
(and 1 more)
Tagged with:
-
Are those concrete flue pipes rather than clay?
-
surprised it's internal fuse didn't pop first?
-
Yes indeed. Blocks arrived first thing and there was no problem craning them where required either. Corners set yesterday and two tubs delivered about a half-hour ago so after a short teabreak the two Terrys were gonna get stuck in.
- 367 replies
-
- ireland
- timber frame
-
(and 1 more)
Tagged with:
-
Thanks Nick, that's the explanation I need- meeting the BCO for the first time today hopefully and I don't know how switched-on he is on drainage ( fire detection is his "pet" subject apparently)... All agreed on 110mm in through the subfloor then. Vented at the plant and AAVs elsewhere. I'll bring the two greys together into a back-entry gully trap as that can be positioned for the outside tap too. Sorted.
-
I must admit I'd prefer either a trap or an air break anywhere a drain is entering the house. That way if you need to remove a sink trap for cleaning there's no chance of sewer gases entering.
-
Makes sense. Only (slight) problem is the stack. I've nowhere at the back for a straight vertical run that's compliant as the dormer for the bathroom gets in the way, I was considering teeing off the horizontal from the bathroom for an internal stack up through the roof, but there's also the option of making the other stack (at the side of the house for the ensuite) external and open. Alternative is Durgos, and venting at the treatment plant. Anybody fancy having a look at the drawings please? dorm093-350-Miller-R2-pdf.pdf
-
OK so we've got three sets of outlets at the back of the house- 1. kitchen sink and DW, 2. the utility sink and WM and the drains from the downstairs shower and basin, and 3. the downstairs WC as well as all the upstairs bathroom. There's 650mm from the top of the footings to the top of the subfloor, and another 225mm or so to FFL. What looks handiest- 1. 40mm out through the wall, drop into gullytrap. 2. 50mm horizontally through the floor insulation and out through wall to rear entry gully 3. 110m out through wall to a vertical soil coming out of a rest bend but I could drop all three down through the subfloor in 110mm and put 1&2 into rear entry gullies? What about 3 then, the soil rising up for the upstairs bathroom needs to be just where the downstairs loo is...
-
oil boiler stats are often doubles- is the a small screw cap beside the knob? could be a reset in behind it if so.
-
Well we've got a ban in force here, and the reasoning apparently isn't pure water conservation. NI Water are seeing unprecedented volume flow and the issue is the ability (or lack of) the pumping equipment to keep the mains up to pressure at this time. Fine for most users, but folks up a long line atop a hill could find their supply disappearing as it can't get the whole way up there...
-
excellent!
-
Actually, I've been told that the stone that broke out might well be marketable as it's splitting so nicely... Anyways. BCO arrived late yesterday and was happy with the trenches, Terry the blockman set levels (three courses of block to the subfloor), and Paul dropped in the mesh and carried out the pour today. Four loads later and it's done. Disappeared the last of the poorly Ash trees along the fenceline too. So blocks are arriving Tuesday and Terry can get up to ground level.
- 367 replies
-
- 2
-
-
- ireland
- timber frame
-
(and 1 more)
Tagged with: