risk all that effort by not hiring a couple hundred quid pump for a couple hours. baffling.
- 39 replies
-
- 2
-
-
-
- the windy roost
- icf
-
(and 2 more)
Tagged with:
-
what m2 is extension ? block and beam may be faster.
-
you have a cold roof by the looks so as long as your ventilation space is open both ends for air flow then you can mix and match insulation as it will be able to dry out.
-
Marmox Thermoblock under SIPS?
Dave Jones replied to Post and beam's topic in General Construction Issues
-
Planning Permission Refusal - Next Steps
Dave Jones replied to JAS-Build's topic in Planning Permission
go for outline only. -
Trench digging, found hollows? holes
Dave Jones replied to garden4ork's topic in Landscaping, Decking & Patios
keep digging until you find virgin ground or hit 3m in which case call in the pilers. -
roofer is a failed brickie.
-
no it is. for severn trent all ground is considered contaminated, hence using the ££££££ pipe, unless you prove otherwise.
-
if you have had a soil test done (70ish quid) to prove no contamination they allow you to use normal pipe.
-
guess your builders weren't to their taste.
-
Is this something to be concerned about?
Dave Jones replied to Romfordian's topic in General Structural Issues
hard to tell from the photo but doesn't look like its bonded into the brickwork of the main house same as they adjoining wall they couldn't be bothered to gauge either. Also the coping stone isnt flashed (contrary to NHBC spec) which will be letting water down the back of that wall rotting it out slowly over time. How these big house builders get away with this crap is terrible. Get onto LABC or whoever your warranty is with. -
How to estimate self-build costs before starting
Dave Jones replied to selfbuilder91's topic in Costing & Estimating
Why bother with architects to do the build ? Much better off employing someone who knows how to build like a project manager / QS/ Builder. Get a detailed construction drawing pack from them, which will be full off errors like odd window/door sizes that don't work brick and add cost, then get it QS'd so you know ballpark what its going to cost. Depending on how hands off (costing you ££££££) you want to be tender and engage a builder, paid in arrears to a written contract. Pay a quantity surveyor to visit each month to determine what the builder is going to be paid against the contract QS schedule. The fees you save doing this method instead of buying the architect another BMW will sort at least a bathroom. This is the process the banks use for developers and it works. It protects the bank. This way the builder knows they cant leg you over and leaves you to organise the big ticket items, windows, kitchen, second fix items. 3 bits of paperwork you must have: Construction Drawings from Architect. Fully qs'd costings derived from these drawings and a contract for the builder to sign. find a good QS who will visit site to prepare you a monthly report so you will be told to the penny how much to pay the builder. For quality and monitoring a project manager could be worth employing, depends how good your builder is really.- 23 replies
-
- self-build
- budget
-
(and 2 more)
Tagged with:
-
interesting, was that for a normal build ?
-
thats what i said ?
-
your going to need a mega plant room for all the kit. multiple cylinders, mvhr etc etc
-
What is the manufacturers recommendation ? You dont appear to have a cill on those doors. How is water going to be shed from them outside the build envelope ? You can carefully lap a DPC tray but a load of hassle and puts you in the frame if it leaks. Get on the phone with the door/window supplier and ask for a drawing to follow so it it leaks you have comeback. What we did with our bifold was have a normal 150mm cill then tiled (porcelain) over the top of the cill to give a level threshold, put an aco linear drain under the cill to takeaway anything that found its way there. Never leaked once in 5 years and only had a 15mm lip to walk over.
-
hardie planks look really smart. zero maintenance https://www.jameshardie.co.uk/en/cladding/hardieplank