jimseng
-
Posts
170 -
Joined
-
Last visited
Topics posted by jimseng
-
BUS increase to 9k for off grid properties. Does anybody know if self build properties are eligable.
By jimseng, in Air Source Heat Pumps (ASHP)
- 1 reply
- 145 views
-
- 59 replies
- 3348 views
-
Full fibre up telegraph pole. How many connections from one point?
By jimseng, in Networks, AV, Security & Automation
- 24 replies
- 686 views
-
- 43 replies
- 1362 views
-
Regulations regarding access height to equipment
By jimseng, in Regulations, Training & Qualifications
- 2 replies
- 365 views
-
ELV (24v dc) and barriers/obstacles for safety.
By jimseng, in Regulations, Training & Qualifications
- 10 replies
- 430 views
-
- 12 replies
- 541 views
-
- 17 replies
- 703 views
-
- 15 replies
- 890 views
-
- 47 replies
- 1978 views
-
- 44 replies
- 1946 views
-
- 50 replies
- 4328 views
-
- 42 replies
- 2849 views
-
- 10 replies
- 1120 views
-
Earth neutral bond for inverter before I get grid hook up on new build. 1 2
By jimseng, in Photovoltaics (PV)
- 34 replies
- 2781 views
-
- 21 replies
- 1555 views
-
- 12 replies
- 956 views
-
- 0 replies
- 590 views
-
24 panels on a new build roof. 2 strings of 12, or 3 strings of 8?
By jimseng, in Photovoltaics (PV)
- 14 replies
- 1079 views
-
Using an inverter as off grid (so no g98/g99g100) with 4 pole changeover contactor - does the DNO need to be involved 1 2
By jimseng, in Photovoltaics (PV)
- 48 replies
- 2394 views
-
- 17 replies
- 1863 views
-
STEELflow 300ltr Un-Vented Cylinder - no guarantee with a bore hole water source...Should I care
By jimseng, in Air Source Heat Pumps (ASHP)
- 6 replies
- 831 views
-
- 9 replies
- 1089 views
-
In roof system (GSE?) and MCS -012 certification..I'm new to this and it is seems to be a minefield
By jimseng, in Photovoltaics (PV)
- 24 replies
- 2514 views
