Jump to content

nod

Members
  • Posts

    10418
  • Joined

  • Last visited

  • Days Won

    72

Everything posted by nod

  1. I would just bed the tray directly on to the ply with a flexible tile adhesive
  2. We hired a all singing all dancing Wagner from Speedy £80 for the week
  3. You need to be very careful of what you leave unprotected Thieves are very mobile Drainage lintels and insulation are prime targets We even had two packs of K Rend pinched off one job
  4. I wouldn’t fix anything directly to the walls By far your best option is gypliner either Boarded with insulated pb or wool batts and boarded with 12.5 PB Or depending on your budget A combination of both
  5. They are fine Just tape and skim
  6. No it’s to narrow
  7. I was robbed Ours was £60
  8. No In my experience they only send you generic answers Pretty much what is already online
  9. Yes it is CML The chap came out before we broke ground Then asked for photos mat each stage But will call in when he is passing It’s quite rare to be paid out off any So I wouldn’t worry to much about that But a necessary evil if you need to sell in the first ten years Or if your lender insists you take one out
  10. We have a pcc 900 k home and workshop 10 years £1500 £500 down after the first site visit
  11. Thanks Bit of a strange one with protek Its more than twice the price of one year when paying for two years
  12. We used Protek last time Coming out at 2300 for two years Ph Luc liability Fire theft vandalism Anyone found anything better
  13. Yes same here Another In July also
  14. It’s very difficult to pin down costs Labour is pretty stable now Materials are more expensive But with massive differences between suppliers supplying the same materials I noticed that Wickes have structural ply at £17.85 per sheet Only a couple of quid dearer than what I’m getting it for at the saw mil Buying 50 plus sheets at a time Lots of companies are cashing in You will need to do a lot of work yourself if you are looking to make significant savings I’m still confident that we can come in at around 1000 m
  15. You can But it must be nails or screwed every 100 and no spring in it I usually put Ditra matting down to be 100% sure
  16. No It isn’t just you We had the same experience on our first We’ve decided to use a professional cert on our second and third Half the price and nearly all lenders recognize them
  17. The tray stops the membrane trailing in the gutter A small cut like that won’t effect it
  18. Add 20% For 50 mil flow screed
  19. Sand and cement 75 mil £15-20 m2
  20. No acoustic advantages what’s so ever Timber is really poor when it comes to acoustics Cheaper and more effective to use res bar and mf
  21. Yes we have had a development of 40 homes near us that have gone into administration Many builders are going to struggle with the interest for the bounce back loans kicking in this month
  22. 10% on insulation with another rise set for June 10 on steel I called in to my friends steel yard He ordered ours and said he will store till we are ready Something he couldn’t have done previously His yard has tow after row of empty racks Even speedy hire are charging me £10 delivery after 25 years of free delivery and collection Personally I think site work will slow dramatically over the next few months With lenders starting to get nervous
  23. No there isn’t Other than Aesthetics
×
×
  • Create New...