How much have you agreed the Architect will do... Just get Planning Permssion? Building Control Approval? Construction Drawings (if needed)? Supervise getting quotes and Builder selection? Supervise the actual building work or just provide support if needed? Getting him to do the whole lot can cost >10% of the build cost.
-
Restrictive covenant indemnity
Temp replied to Jvh2012's topic in Party Wall & Property Legal Issues
Google found examples of their decision discussed here.. https://www.stiveschambers.co.uk/content/uploads/2019/04/Modification-of-Restrictive-Covenants-article-final.pdf -
Restrictive covenant indemnity
Temp replied to Jvh2012's topic in Party Wall & Property Legal Issues
Not done one but if thats the process involving the Land Tribunal I have read it can take two years. Backlog due to Covid as well? -
Unfortunately its not that simple. What is the land currently used for? You might need planning permission for "change of use."
-
Heights are normally measured from the highest ground immediately adjacent to the building/deck. I found this appeal which covers decking on sloping ground.. https://www.merton.gov.uk/assets/Documents/22 St Georges Rd Appeal Decision May 19 Decking a d Fence and Extension.pdf What I don't know is if the government have changed the rules since or if they have gone to the high Court to get it overturned.
-
Restrictive covenant indemnity
Temp replied to Jvh2012's topic in Party Wall & Property Legal Issues
Not all covenants can be enforced and in that case it is possible to get them removed at the Land Registry. If it is enforceable it still might be possible to get it removed of amended by application to the Lands Tribunal" but that can take a long time. When land is split its common for the covenant to apply to both parts. However when its merged the covenant usually only applies to the original part. I think you need to find a specialist and get them to quote to review the paperwork and recommend a way forward. Compare that with the cost of insurance. -
Manifold system versus hot return system
Temp replied to Russell griffiths's topic in General Plumbing
Perhaos because CH loops can be dosed with corrosion inhibitors where as secondary loops can't. That might affect pump life but if you have already paid for it then I'd use it until it fails. Several ebay sellers appear to sell that pump as secondary loop pump but I can't find any info on an RS25/6 on the Wilo website. -
I agree you don't need a full time project manager but it's essential that someone with good organisational skills is part of the team. That could be you, a builder, a project manager, a site foreman or just a good all round trade you can trust. That person should ideally visit the site first and last thing to make sure people are turning up on time and not disappearing early and make sure everyone has what they need for the next day or two. You want to avoid trades turning up then having to go off site to buy essential nails or whatever because it turns into an hour coffee break you are paying for. It would be easy to discover that nobody has ordered something or you are short on materials , find they are on 2 week lead times and then loose a good worker because they have nothing they can do in the meantime. These are project management skills.
-
Appointing a main contractor/builder - things to consider
Temp replied to Tom's topic in General Self Build & DIY Discussion
Making sure these are consistent with any stages as the lender requires. Retain 5% or 10% of each stage for snagging. -
Welcome to the forum. Telebeam works but its probably more expensive so perhaps only use if more traditional methods can't be used.
-
underfloor heating Underfloor heating installation opinions on work quality
Temp replied to Pbb's topic in Introduce Yourself
Are you tiling over the screed? If so consider forming expansion gaps where two areas of screed meet at doorways. Otherwise there is a chance of getting a curved crack that can propagate through the tile. With a straight expansion gap you can tile upto it or put a cill piece over it.- 26 replies
-
Guess I'm not awake tonight. Was up watching the sailing at 3am.
-
How did you let the water pressure off? Heating drain cock?
-
Possibly another here for $35 but design looks different.. https://www.tubularheater.de/instant-heater-for-dishwasher/57083347.html
-
Google found one that looks similar to mine here but its not much cheaper than a whole new assy from ebay.... https://ziperone.com/products/00000024678
-
The Bosch heater in our dishwasher is prone to failure due to quite minor scale... The heating element is printed onto the outside of a steel tube. What happens is that a thin layer of scale builds up on the inside of the tube and this insulates the heating element from the water causing it to overheat. You can see where a spot has "blown" and its always at the bottom where scale formsbon the inside. I've had thus happen twice. I now put a bottle of cheap vinegar in the machine every other week to try and prevent it happening.
-
They can't do the impossible.
-
Humm. @Ultima357 figures do appear to show an average COP of about 11.
-
It should be straight forward to measure. Input power is easy, output power needs the flow and return temperatures uplift and the flow rate. I wonder if very high COP occurs during over run at the end of a call for heat cycle
-
Im not sure I would install UFH without finding out. We have 80mm of PIR in our floor between battens and wish we had more.
-
Does it remove all Permitted development? What's the exact wording?
-
Just about any solution will have some sort of "upstand" requirement on a flat roof (including the sun tunnels).
-
Presumably you want each button to sound a different chime so you know which door to go to, and the three chime boxes are for coverage in different parts of the house? Quick google found this range can do that.. https://doorchimesuk.co.uk/catalog/product_info.php?products_id=629 That model supports lots of different wiring options including mains and built in transformers. The circuit below is just one possibility based on their option B using an external transformer and chimes in parallel. You would run two core cables for the push buttons and three core to the chimes all to a central location like the CU where the transformer and a junction box is located. You might consider running extra cores to the pushbuttons as spares or future use. https://doorchimesuk.co.uk/pdf/CROMA_230.pdf It says each chime box needs 12V at 0.5A so I'd use something like a 12V AC 2A transformer. With more time it might be possible to eliminate the external transformer using one of the other wiring options.
-
Perhaps look at a stranded CAT network cable?