Jump to content

ProDave

Members
  • Posts

    30861
  • Joined

  • Last visited

  • Days Won

    427

Everything posted by ProDave

  1. It's officially finished when BC issue a completion certificate. Then you are free to finish it as you want, when you want, if ever.
  2. Also, the 110V secondary is usually centre tapped and the centre connected to earth. So if you did come into contact with a live wire the most it would be is 55V which is little more than a tingle. By the way who actually says they are going to use a 110V transformer or indeed any mains powered tools. I have worked on several new builds including 2 of my own, all timber frame and I don't recall much use of wired power tools. Plenty of wired chop saws etc but they are sited away from the actual build a little, and later in the build perhaps a large drill to drill a core through a wall. But most day to day stuff is all cordless tools now. So what I am trying to say, is mains power available next to the build is probably enough.
  3. You sketch is wrong. The hing side of the door is still tight to the frame, not as you have sketched. Instead the door is no longer square. If you put a big square to the corners of the door, you would see they are no longer right angles.
  4. If you raise the hinge side, that may start to clash with the top before the outer side has lifted enough to clear the cill. Your issue seems to be the glass unit has tilted or moved and putting undue pressure on the outer edge deforming the frame. You need the glass removed and refitted correctly. the alignment of the glass inside the frame is called heel & toeing and by using packers and wedges the glass is set to place all it's weight on the inner, hinge side at the bottom with further wedges to stop the resulting outward tilting force rotating the glass in the frame. You want a glass fitter to come and do this for you. EDIT: seeing your post with pictures you can see the upper glass panel has rotated in the frame just as I described. The fitter would neet to take the glass and the solid bottom infil panel out, square up the frame, and refit both with the correct setup of the packers.
  5. Are you saying, that if you look at the bottom of the door as it closes, the hinge side is correct, but the outer edge of the door bottom is too close to the outer edge of the door frame bottom and that is where it is catching?
  6. This sounds very much like one I encountered some years ago. Property was high up a hill. Mains water was provided to a buried tank, as high up the hill as the mains pressure would get it. From the tank it was pumped up to the house. They were responsible for the pump, the pipe and the switchgear. On one occasion when we looked in the tank, another party had simply added another pump to draw from it. Is it that sort of arrangement? if so it was I guess technically mains water with a break tank. More details would be needed to find a solution.
  7. It won't just be the electrician using a 110V transformer, most trades will, and most will just bring their own and expect somewhere to plug it in. So get or make a very heavy duty long 240V extension lead, or since you have the cable that is going to feed the house already buried, buy a waterproof cabinet and put a temporary site consumer unit in it with power sockets etc right at the house site.
  8. ProDave

    Rats!

    Don't pay a rat man. Buy rat poison and put it out yourself again and again until they are gone.
  9. My understanding it is water running down the walls, dripping off the window drip beads etc that ends up on the wooden frame of the balcony fixed tight to the house wall. When I built my balcony I anticipated this issue. The timber "against" the wall was fixed on spacers so it sits about 25mm off the wall. Any such drips can just run down the wall as before without wetting the timbers. And I gave them all 2 coats of exterior wood paint before assembly. I don't see an easy fix here other than paint every bit of timber with at least some form of exterior wood preservative, and some local flashings formed over the worst affected parts.
  10. You are proposing an air pressure test are you not, in which case there will be no problem.
  11. I just don't like having to pass through the kitchen to get from the hall to the living room. Stairs from the hall is normal. Your proposal with the stairs at the back is just awkward.
  12. I could see that being caused by a lintel if it was a steel lintel, now rusting and expanding. Re pictures. A lot of phones now try to be helpful by auto rotating an image. So if viewing and posting on a phone you may not even know it is coming out the wrong way up. I prefer not to uses such "helpful" features so I know if a picture is posted the right way up or not.
  13. We have to pay for a proper pump out, but on the other hand we don't pay any other waste water charges.
  14. I don't think they understand your roof. What they have supplied sounds like what we used. The flashing goes on the top (in our case for tiles) In the roof cavity the support bracket and then on the inside (plasterboard in our case) the internal trim. You don't have that inner layer so the support could go between the rafters but it would look ugly. What flashing have they provided for the polycarb roof?
  15. Can I enquire why you want such a tiny hose ultimately connected to such a big fitting. It seems very unusual to say the least.
  16. I see nothing wrong with DIY but you MUST have it pumped out first so you are filling an empty tank. So the replacement treatment plant will have to be installed an in use first, so if planning to refill with the excavations from that, you will have to store that somewhere.
  17. That is a Proboil 2, the same as I have supplied by Howdens under their own brand. Ours was originally the Proboil 1 but the boiler was replaced under warranty as it failed in the first year and replaced with the Proboil 2. Ours only has ordinary hot and cold and boiling (actually 98 degrees) We are in a soft water area so no scale issues and I didn't even bother installing the supplied in line filter. There are also instructions on the Proboil site to dismantle and descale the boiler if needed. Our Proboil 2 has been in use for about 6 years now. Get a price from Howdens before buying.
  18. The one on the right looks to be the connector that comes with a big submirsible pump. the multi barbed fitting is for connecting to different sizes of delivery hose. Where does the skinny pipe on the left fit into this? explain what you want to connect to what?
  19. We did an entire 2 storey extension under a building notice when we were down south. It worked astonishingly well, no problems at all. But then the builder we used had come highly recommended and there was nothing particularly complicated about it. I also remember the astonishingly (by todays standard) cost of building the shell including foundations and roof of just £18K
  20. Can the glass banister panels be removed? I like the Genie lift idea, but it would be a lot less frightening if the glass could be removed and the bath only then needs lifting to floor level and sliding over from the lift. Then glass replaced.
  21. Re sign off. Obviously there is the design and things like structural engineer. We paid an AT to do all the design and produce all the drawings to the satisfaction of building control and issue of a building warrant. Electrical install required sign off, that was my job so for me easy. Plumbing, the only sign off was unvented G3 and Gas safe for the hob. I did the plumbing for both, a plumber I know did the tests and G3 sign off and a different plumber issued the gas safe certificate. AS built SAP issued by the same company that did the design SAP using the final figures I supplied including the air test results. BC effectively certified the stove install, they were very particular checking distance to combustible materials comparing actual to that the stoves install manual stated. All drain pressure tests done by me and witnessed by BC. Glass. BC just checked all the low level windows and doors for the toughened label on the glass units.
  22. Why not drop a flue liner down the chimneys and extend the flue liner only down to the sub floor space. That should be air tight.
  23. So the issue is, as I suspected, you are unhappy with their plans. Has the drain EVER blocked with this new neighbour? Is the extension going to come right up to your boundary? If so you need a party wall agreement that should sort out all the issues including rain water drainage. Someone else will have to answer the finer points of that as I have never had to seal with one. If you want to sow seeds of doubt to your neighbour then suggest if he builds right up to the boundary you might later do the same and his semi detached house will become a mid terrace house devaluing it.
  24. The two browns, presently in the L terminal need to connect to both COM1 and COM2 on the new switch. You will need an extra piece of brown wire to make a link between them. The other two browns in the terminals with a symbol a bit like an X, one will go to L11 and the other to L21 on the new switch. No links this time. The blue connected to N is not needed for the new switch follow it back and I think you will be able to disconnect it from the terminal block with the other blues. Leave the other blues still in that terminal block. The new switch has a metal front and an earth terminal so you will need a green and yellow earth link from the earth terminal in the back box to the earth terminal on the switch.
×
×
  • Create New...