  1. I had a similar problem. Couldn’t find a leak anywhere but pressure dropped 0.5 bar over 2 weeks. A dose of Leak sealer solved the problem
  2. Actually it’s the market price of a barrel of crude oil, Brent being the benchmark grade. Market price has little to do with cost, it is supply and demand. Production costs range from <$10/barrel in the Middle East to >$60/barrel in offshore, deep water fields.
  3. Trusses for the main house. Simple cut rafters with a Glulam beam in the garden room as it is vaulted without ties. I wanted to avoid steel due to cold bridging and the need for a SE. Didn’t price up a full cut roof but can imagine the labour cost tipping the scales towards trusses.
  4. Definitely a neighbour, nobody in local authority has the time or inclination to look in everyone’s back yard!
  5. What is the ducting for? Underground stuff will do the job but not fit anything else in the system. Rigid plastic ducting is better.
  6. Not insane at all, it will be worth it if you’re planning to stay in the house a long time. Consider using engineered joists but keep in mind that you can’t notch them.
  7. Very helpful sharing your take aways! I am seriously considering Cool Energy so will look out for the new display. Grant also on the list if I can find a reasonable cost MCS installer offering 7 year warranty.
  8. Cheers, good to know it’s not a silly rate. I am prepared to pay a bit more for a decent job.
  9. Yep, no sign of a slow down so they can quote ‘take or leave it’ prices. I will have to take it if we are going to get moved in this year.
  10. Yes, that’s his price. Gone up since yours then 🤔
  11. Correction - the price didn’t include materials, labour only! Still not sure if this is reasonable, struggling to get another quote …
  12. Ask them for the relevant regulation, this cannot be a matter for individual officers judgement.
  13. I would use rigid plastic stuff, cheaper, easier to work with and probably quieter. If it’s the same size as the bend, try the pipe directly onto the spigot.
  14. Just been quoted £6/m2 for boarding and the same for skimming (£12/m2 board and skim) inc. materials. Does this seem reasonable in 2022?
  15. My soakaways are closer than that due to space constraints, approved by BC so it is not undevelopable. But you need an acceptable solution before committing
  16. Welcome, no worries plenty of amateur enthusiasts here 😉 Velux are normally very robust, never had a problem as you describe. Might be worth posting a photo to obtain more specific advice.
  17. Before you decide it needs replacing or even repairing, what’s the problem? Is it not working in some way? How do you know? Keep in mind that thousands of homes have septic tanks which have done the job for years without any baffles or anything else inside!
  18. You are doing well, this one’s flying up! Last time I looked you were in the trenches. Started thinking where the Christmas tree is going yet? 😉
  19. No.1 for me would be to fit self closers, an open door is useless! Next make sure they are very well fitted, minimal gaps and all round seals if you want to go that far. Have you thought about fire doors?
  20. Heavy rebar epoxied into the wall? Have you looked on YouTube? Loads of ideas, quite a lot American so some materials and tools we don’t have but worth a browse.
  21. Not wishing to split hairs ... but it’s kWh isn’t it?
  22. Depends what it will be used for and when? How do you intend to insulate the walls and roof? Have you got space to put some PIR over the frame? Even 25mm would be better than nothing. Although you have a cold bridge with the steel, it’s still worth putting 50mm PIR in the frame if you have the time. Cut it a big bigger and stick in with expanding foam.
  23. Still not sure, seems to be all he knows or maybe he calls all framing timber CLS?! Anyway I went to the timber merchant and looked at both, you can hardly tell the difference. CLS is paler in colour, presumably because it has more planed off. Both straight, smooth, kiln dried and rounded edges. Regularised (C16) is available in 3.6m lengths from stock and costs less per metre. So bigger timbers for less money with less waste, ordered!
  24. Interesting, that’s quite a small section but good know it feels solid. What spacing are your studs?
  25. Thanks for all the replies, should have explained its for internal (non load bearing) stud walls. Large part of them are 3.3m high, hence wanting the slightly thicker section, as well as 400 centres! Another issue is door casings are 114mm to fit 89mil studs + 2x12.5 board. Next size is 138/140mm. I am going to the timber merchant this morning to look over it.
×
×
  • Create New...