jimseng
-
Posts
170 -
Joined
-
Last visited
Topics posted by jimseng
-
BUS increase to 9k for off grid properties. Does anybody know if self build properties are eligable.
By jimseng, in Air Source Heat Pumps (ASHP)
- 1 reply
- 667 views
-
- 59 replies
- 5548 views
-
Full fibre up telegraph pole. How many connections from one point?
By jimseng, in Networks, AV, Security & Automation
- 24 replies
- 1269 views
-
- 43 replies
- 2261 views
-
Regulations regarding access height to equipment
By jimseng, in Regulations, Training & Qualifications
- 2 replies
- 995 views
-
ELV (24v dc) and barriers/obstacles for safety.
By jimseng, in Regulations, Training & Qualifications
- 10 replies
- 908 views
-
- 12 replies
- 1065 views
-
- 17 replies
- 1236 views
-
- 15 replies
- 1427 views
-
- 47 replies
- 2919 views
-
- 44 replies
- 2734 views
-
- 50 replies
- 4619 views
-
- 42 replies
- 3288 views
-
- 10 replies
- 1583 views
-
Earth neutral bond for inverter before I get grid hook up on new build. 1 2
By jimseng, in Photovoltaics (PV)
- 34 replies
- 2969 views
-
- 21 replies
- 1727 views
-
- 12 replies
- 1017 views
-
- 0 replies
- 613 views
-
24 panels on a new build roof. 2 strings of 12, or 3 strings of 8?
By jimseng, in Photovoltaics (PV)
- 14 replies
- 1160 views
-
Using an inverter as off grid (so no g98/g99g100) with 4 pole changeover contactor - does the DNO need to be involved 1 2
By jimseng, in Photovoltaics (PV)
- 48 replies
- 2689 views
-
- 17 replies
- 1959 views
-
STEELflow 300ltr Un-Vented Cylinder - no guarantee with a bore hole water source...Should I care
By jimseng, in Air Source Heat Pumps (ASHP)
- 6 replies
- 907 views
-
- 9 replies
- 1158 views
-
In roof system (GSE?) and MCS -012 certification..I'm new to this and it is seems to be a minefield
By jimseng, in Photovoltaics (PV)
- 24 replies
- 2697 views
