  1. nod

    Chainsaw

    It’s the catching the dirt I’ve another 20 trees to cut The land owner said bit late asking since you cut more than that when you bought the plot Without asking So cut the bloody things yourself He has a point
  2. nod

    Chainsaw

    Nice one Dave Thanks for that I will get one ordered
  3. nod

    Chainsaw

    It has been discussed Possibly Peter John? Are the chainsaw sharpeners any good The yellow plastic type with a stone that fit on the end of a saw Seem to be spending more time sharpening these days
  4. I’ve used the 18 layer foil prior to plaster boarding Down side is you can’t get a phone signal in the house
  5. Try using I stud It’s load baring Stronger and 100% true
  6. I worked for a house builder that would ask us to nip in each plot for an hour at the end of the day and board the ceiling's ready for studs Grate for plasterers not so for electricians and anything that has to go up there I never board onto trusses Often up and down and running out Not much of a target for the boarders to hit as you point out a pain to stud What I do each week is counter Barton with 75 x 25 timber or or metal top hat
  7. We used Protec less than 2 k We only used the basic package Insure us against someone wandering on and injuring themselves Fire damage to the house Once you start adding liability for contractors or tool and plant insurance The price almost doubled
  8. I prefer system Combi in our last house As above some turns a hot tap on and you here a scream from the shower
  9. If your taping the joints Then joint filler one coat Then two coats of joint cement Normally left to dry for three days before sanding
  10. The skinner will tape the boards prior to skimming All pb joints are taped
  11. nod

    Hi All

    I think many people feel the same way as you We have decided to hold back on purchasing our second plot With quite a few partly finished developments coming on the market A second spike is likely once summer is over and the winter flu season starts
  12. Hi Zoot yep 4 bags of Board finish OR multi finish Which ever they have in One roll of fibre tape also
  13. Looks expensive just for design I would gave thought calcs would be in the first figure
  14. Two pair ceiling will be plenty Most of the merchants have it but are restricting none Account holder to 5 So you should be ok Half a day for one man
  15. TP have it but are limiting to ten bags per order which isn’t much good Ive seen people coming out of Wickes also
  16. My jobs are priced 6 months in advance So I will just have to stand it for now The ten pallets Will only last a matter of weeks then we will have to buy more Hopefully locally
  17. Just looking on eBay and someone is selling the same stud at £41 per bag Is anyone paying that An extra £4 a bag is not sustainable for me
  18. We’ve been getting it fine over the last twelve weeks But with a pallet only lasting a day or two I’m having to pay nearly a tenner a bag including transport Knauf
  19. Like most I assumed that shortages where due to the lockdown It now seems that there is an ongoing problem with the manufacturer of MF at the Carlisle plant We are starting bringing in finish from Poland Ten pallets due on Monday This is adding about £3 per bag When it rains it pours
  20. Probably the latter Sorry ?
  21. Chinese are cheap rubbish Italian Spanish Portuguese -Some Turkish China India Malaysia In that order I buy 1000s of m2 per year I can tell an Italian tile without looking at the back
  22. I used these on our 158m2 laser cut Imported from Italy Including vat and delivery 29m2 1200 x 200 Porcelain Massive mark up on tiles Italian laser cut are the only tiles in this size without any camber
  23. Exactly Russ the showroom prices are much higher than trade On e you get upto 30 you should be looking at laser cut Italian Porcelain Tops ask high prices for inferior Turkish Chinese
  24. Yes you are correct in assuming that the render will form a weatherproof barrier The EWI will The first coat and mesh goes on together and left unscratched for a couple of hours Then topped with a ten mill coat This will be scratched and left pitted Leaving the first mesh coat in tacked to stop any ingress of water
×
×