Yes - sensible approach but I don't yet know how many of each standard size need so at least my algorithm will tell me that approximately I worry that just dividing the total length needed by the standard length will result in more wastage as I will have to order extra to be sure to be sure!
-
Yep just spotted that, cutting will take place on site, for the garden room we used 10m lengths and that came on a pretty standard lorry I thought although no HIAB so had to move them all by hand.
-
My initial forays in prices seems to indicate that the 10m lengths are the cheapest per meter - could be something to do with transport, but I will check that with the competing suppliers, thanks for pointing it out.
-
Thanks Peter, I think that will be a lot of typing as it does not seem to accept mass entry (CSV etc) - interesting roots though in cattle markets and it seems to roughly apply the algorithm I suggested!
-
We have 312 lengths (elements) of timber in our frame mainly I-Joist (FJI) and Kerto beams but some 38 x 89 C24 and some Gluelam. I have exported the details of each element from the frame drawings to a spreadsheet and now need to opimise the order from standard lengths (8m /10m / 12m) anybody come across an algorithm for doing this? Can write it in any language but VBA is simplest given everything is in the spreadsheet. I have had a look at the commercial packages and they seem mostly focused on flat sheet cut optimisation which is not my problem right now. I don't want to go to the work of creating a Genetic or algebraic optimiser so I am hoping a simple algorithm will get me close enough as I would like to keep the costs in control and I will add a few standard lengths of each size to the order My basic approach is going to be: Settings like: Cut margin (The amount to add to the length for cutting - 10mm perhaps) Then Repeat Set cut length to Zero Seek longest remaining element and set element spec IE '58x220 FJI' or '75x240 KERTO'. Add to cut length Repeat Define Waste from standard length(s) Find nearest fit, allowing for cut margin, from remaining items Add to cut length Until cannot find any more that can fit in the waste Add standard length found to order sheet Record final waste figure Flag all elements assigned as not remaining and mark them against the standard length code (So I know what I am cutting from each length) Until all elements assigned to a standard length Add up final waste figures Feels about right, will run it three times, once for each standard length and see what the waste is on each - sure not perfect though.I guess there is always a chance the supplier might optimise it for me but thought I would have a go myself. Any thoughts anyone.
-
Another week comes to an end
MikeSharp01 commented on recoveringbuilder's blog entry in Recoveringbuilder
Hi Christine. Sounds like a very challenging time a few things you can rely on though - You are not alone we are all rooting for you. Self building is very challenging but the sense of satisfaction when you come through it makes it all worth while. Just to start a self build takes a lot of courage and sticking to it takes even more but in the ends its your goal that matters and the pain of apparent mountains in the road when you hit them will look like bumps in the road when you look back and see what you have achieved. You have come an awful long way already, just a bit further and the sunlight uplands will be all yours. Keep on keeping on and you will come through it. -
That's interesting, our UFH is in the slab and as we now intend to Tile, as the power float polish failed, do we need it?As things stand I was intending to tile directly to the slab after the failed polish is scabbled off.
-
@nodWhat us the orange stuff under the adhesive, looks like a great job and you are a brave man taking that amount of tilling on or are you a closet pro!
-
There wuz I Digging this 'ole .....
MikeSharp01 replied to ToughButterCup's topic in Waste & Sewerage
Don't forget the rules on supporting the sides of excavations more than 1.5M (IIRC) you don't want it falling in especially if you are down the hole fettling the corners with a spade IE head down not watching the sides. -
I demolished your house, but I'm not moving the debris!
MikeSharp01 replied to laurenco's topic in Demolition
IT had, latest research seems to point to improvement as the industry matures, the worst overspend record of them all, fortunately there are no self builders so its either corporate or public sector that bears the brunt of the undiscovered ruins in the spec / test plan / hardware / network / database / integration etc.- 192 replies
-
- demolition
- cowboys
-
(and 2 more)
Tagged with:
-
Expertly topped trees...
MikeSharp01 replied to Ferdinand's topic in General Self Build & DIY Discussion
Makes you wonder why Amateurs should do anything - its about learning - how best to crown reduce a big tree, assessing the risks of DIY - tree climbing with a chain saw sort of risks, and then choosing whether you want to save money spending time or save time, and perhaps injury, spending money.- 9 replies
-
- trees
- arboriculture
-
(and 1 more)
Tagged with:
-
Don't want to rain on your parade but you may need to take advice from a pro because, IIRC my timber technology from way back, your thickness is going to take more than a few years to season fully and when you plane it you will get down to less seasoned wood which may warp again. There is a real art to seasoning long length hardwoods for cabinet making - long time / very slowly as near the finished thickness as possible and absolutely flat. I have friends who do it and 5 years is nothing to them. You could sell your planks and buy 295mm wide by 20mm oak planks ready for cabinet making, not the same as grow your own I agree, from HERE (where I get mine) but there must be someone closer to you. Another way to go would be to use your planks cross wise on the table that way any warping will be less pronounced. Alternatively go for a more rustic look, maybe with gaps between the planks which can accommodate any warping.
-
Welcome to THE forum.
-
If they are not crushed very well you will likely have a lot more voids that will need to be filled with soil over time causing the surface to pucker as the soil is washed into the voids over time by the rain etc. So for a bit you will need to keep topping up the surface. Once the voids are filled however it will be very stable you could speed this up by blinding it with a sand layer and washing it in with hose. If their quote included crushing it I think I would insist they did.
- 35 replies
-
- 2
-
-
- demolition
- bungalow
-
(and 3 more)
Tagged with:
-
Doesn't sound very usual to me - you must have been very bad surely this cannot be a consequence of a plumbing problem. I have a suspicion that there is more to learn here.
-
Yes - I hope mine lasts more than that though, but I suspect that is just another of the variables - you factor in 60 years at the outset to figure out how much energy you are, or think you are, going to need. I was wondering about those that have already been built. EG does @JSHarris's pad do it as is (his SAP is 107 I think although SAP does not really tell you much about energy production as you get points for all kinds of things which, on the face of it, don't count in the energy equation) or would you need need much more generation. I guess you can factor in COP benefits from ASHP's etc as well which might help. Either way you have the, on the face of it, nightmare of working out how much energy was used to create the materials, build the building, run it in energy terms (100 of the 107, simplistically I guess). Throws down a challenge though don't it?
-
Just been reading the latest Passive House magazine (sad I know) but came across the new 'Powerhouse' standard that has been suggested in Norway. In this standard you first have to build a passive standard building and then ensure that it, or systems associated with it, can generate enough renewable energy over the building's lifetime to: (Wait for it) pay back the energy used in manufacturing all the materials. pay back all the energy used in its construction. cover all the energy use of operating the building. cover all the energy used for maintaining and renovating the building - including materials used. pay back the energy used in demolishing the building. So you need a SAP value of more than 100 (if you believe in the SAP values anyway) and then you need to work out / find all those energy consumption values. Wonder how much energy it takes to make 1 meter of 15mm plastic water pipe! So if you have a SAP of 110 I wonder how long the average buildings life has to be? Somebody somewhere seems to get it - the Norwegians, but I cannot see any of our major builders doing it or self builders for that matter. There won't be a collective opinion on this but it would be interesting to hear the thoughts from the forum. Anybody worked it out for their build?
-
Insect Screen Corroding
MikeSharp01 replied to Gone West's topic in Mechanical Ventilation with Heat Recovery (MVHR)
You are a long way from the sea so it's probably not salt corrosion, lets hope @JSHarris has some chemical theory as pretty much everything corrodes given the right atmosphere, might it be something the local farmer puts in the air as you are a bit exposed there - sadly the best solution might be, I hesitate to say it, plastic sorry. -
Sorry yes @Mr Punter the VCL should read breather membrane I keep mixing those up. On the air tight membrane and the double sided tape - the air tight membrane is sealed to the concrete slab with the double sided butyl as in: I could use packers and a mortar gun to load up the mortar - I guess you do that before you actually start loading it with studs. The DPC is directly on the concrete and laps over the main DPM coming up the side of the polystyrene former and over the top, then the Mortar and then the sole plate timbers, putting mortar below the DPC feels like a potential damp path. I was wondering if I should bitumen down the DPC to ensure the join between the DPM and the sole plate DPC is sound.
-
Many of you will recall our hickup around the concrete polishing of our new slab. ( ) Well after much thinking and soul searching we have chosen to look at tiling our floor. That means a slight change to the sole plate detail and I thought I would run it past the forum and see if it stacks up OK. The SE has OKed the split format as shown below but I have some concerns. They are: How to tidy up the two DPC / DPM tails that hand over the outer edge. Does taking the sole plate DPC up the out side of the inner sole plate make for a robust detail. How thin can a tile adhesive layer normally be so we can work out the final height based on the choosing a tile of a given thickness. Any thoughts greatly appreciated.
-
Yes I think so, we are still working out our next step and all the above experiments might form part of it. I am meeting a concrete grinder on site Monday so I hope to have a full prognosis and all the options thought through quickly after that.
-
Ok so I am getting there with potential solutions but I want to press on so I thought I would move ahead allowing for all permutations when fitting the sole plate. The cost of the finish won't change much once the sole plate is down as long as I leave the internal walls out for now. SO I need to get a sole plate detail that ensures we can either go down (easy) or up with a screed. Its all about making sure the DPC comes out above the screed - so here is my thinking which would allow up to 60mm of screed assuming the mortar bed, which sits on the DPC, is about 10mm: Is this a runner, any thoughts?