  1. Osmo uv protection oil doesn't fade quickly so I doubt there will be much change in a year. I tried the clear on new oak and found it way too light. So I used a coat of Danish oil first to get a nice honey colour and the clear to protect it. A year on it's still a nice honey colour so I think the uv properties are pretty good. Before hitting it with the sander I would paint up some scrap cedar and see what happens. The stain might have penetrated unevenly so it might not sand off evenly.
  2. Can you post a photo? So as I understand the problem is if it was level immediately adjacent to the house the vents would be blocked. The answer might be to move the level area 6" away from the house to leave a "trough" or gap for air to get to the vents as others have suggested. This gap could be covered with something like a removable linear drain cover to prevent the wheels of your chair falling into it...
  3. +1 They really must fix that. May have to move the whole lot left a bit so they go under the old ones like you say they do on the other pitch.
  4. I guess you may have looked here already but looks like they have their own EPS system... http://www.sto.co.uk/en/products/external-wall-insulation/downloads.html
  5. I cant really help answer your question but I know that not all renders are approved by the manufacture for use below DPC so I would contact them to ask about that.
  6. For my outbuilding I arranged for the top of the slab to be above ground level and slightly smaller than the building so rain running down the cladding would drop onto the ground not the top of the slab. I also raised the frame on a course of bricks and a DPC so no way the frame can sit in water.
  7. Two years! Thought I had it bad (about 14 months). Much the same reasons as you listed except for the bats.There are loads about but for some reason nobody ever raised them as an issue.
  8. As I recall there are two things that have to be right: * The volume S is important because it has to be big enough to store the storm surge. * The area a is important to ensure it drains away before the next one. I think the area a appears in the equation for S because water can flow out while it's flowing in and taking that into account allows S to be smaller than it otherwise would be. So I believe it's safe to ignore the -a*f*900 term if necessary but that would make the volume bigger. If you want to include it I think you should calculate the required a first then put that in the equation for S. Then when you have both numbers you can work out a size of soakaway that meets both. I should add I've not looked at the BRE doc for ages but that's how I think it works.
  9. CML say... https://www.cml.org.uk/lenders-handbook/pcc/
  10. It's probably hotter today.
  11. Check it doesn't need planning permission first. Eg within 2m of the boundary the eaves need to be <3m high to come within permitted development rules. However I think that's measured at the point furthest from your rear wall. Details in here.. https://www.gov.uk/government/publications/permitted-development-rights-for-householders-technical-guidance Those dimensions sound ok to me. For the brackets I would use something like this that raises the bottom of the posts off the ground a bit. https://go.twenga.co.uk/to?s=9720237&gap=&gat=pla&aagid=48884992022&acid=1017976262&atid=pla-405564714126&aadid=247473114207&mcoid=114135292651&appid=405564714126&gd=t&mcid=166725238&url=https%3A%2F%2Frover.ebay.com%2Frover%2F1%2F710-53481-19255-0%2F1%3Fff3%3D4%26pub%3D5574631662%26toolid%3D10001%26campid%3D5338624526%26customid%3D%26mpre%3Dhttps%3A%2F%2Fwww.ebay.co.uk%2Fitm%2FHeavy-Duty-Galvanised-Concealed-Fence-Gazebo-Post-Support-Base-Bracket-Shoe-%2F114135292651%3Fvar%3D&gclid=CjwKCAjw34n5BRA9EiwA2u9k37T3KqGX8p8ITrqewKeFRaJagIVu38y1rLaNeymfLDUqZ3arwX3BexoCJbQQAvD_B If using pressure treated timber I'd cut the post to height and put the cut end at the top where its sheltered under the roof leaving the deeply pressure treated end at the bottom. Obviously treat the cut end but I reckon it will last longer if you do it that way up.
  12. How deep are your joists? Looks like 220mm are ok without sound insulation but 195mm might need it or am I reading the Hickman document wrong?
  13. Im surprised they achieved part E2 without sound insulation but that's what the joist manual is saying. Standards in Scotland are higher.
  14. Did they put that in writing?
  15. Think that Express article is wrong. Here it says the holiday applies to residential property, no mention of non-res.. https://www.gov.uk/guidance/stamp-duty-land-tax-temporary-reduced-rates
  16. This suggests the holiday does apply.. https://www.express.co.uk/life-style/property/1308808/stamp-duty-holiday-does-stamp-duty-holiday-apply-to-second-home "Developers" and those purchasing a second home will still have to pay the 3% surcharge. Actually if you own a house you have to pay it and reclaim when you sell within 36 months. So I believe if you are buying the land to build your principle residence the holiday should apply. Err I think.
  17. I note they didn't specify what they mean by a fire door. There are several standards. We have a fire door on one bedroom and I defy anyone to tell the difference between that one and the other doors. It's just slightly thicker and feels more solid than the other doors. Certainly not ugly. No need for auto closing.
  18. Last I looked they do. As I recal.. Part E1 applies to separating walls (for example walls and floors seperating dwellings such as the party wall between semi detached houses and flats) and Part E2 applies to walls and floors between rooms within the same dwelling. Your floor/ceiling should meet part E2, which isnt as difficult as E1 but still exists unless I'm out of date.
  19. People down the road from us had a tank leak. It was only discovered after oil turned up in a stream 100 yards down the hill. Hate to think how much the clean up cost.
  20. As the SE what he expects. Our ground condition report involved digging two holes with a digger rather than "micro bole holes". Perhaps even ask him to recommend a company and what he thinks it should cost in your area. You might also get a percolation test done at same time if you will need soakaways or similar.
  21. Ok so Building Control are actually saying that your desired room layout isnt allowed by building regulations, HOWEVER in this particular case they are going to allow it provided you fit a fire door. If they are right about your room layout then by requesting a fire door they are actually helping you achieve what you want you build when normally they wouldn't allow it. So is there something about the windows or lack of windows in your bedroom and the ensuite that mean one or both is considered an inner room? If they both have windows do they meet the rules for escape? Eg clear opening widths? Not above a glass conservatory?
  22. I'd be very surprised if that meets building regulations, specifically Approved Document Part E. There are several ways to demonstrate compliance. One is to carry out a sound test. Another is to design and build to match a so called "robust design" which is a design someone else has built and tested. That might be the company that supplied the floor joists or the sound insulation they failed to fit. I would ask the builder how they demonstrated compliance with Part E to Building control. Ask which route they took to demonstrate compliance. If you appear knowledgeable they might give in an fit insulation that probably should have been there.
  23. Lot depends on what the surrounding houses look like? If every house around was similar in appearance built from local stone and slate then even modest changes might be difficult. If nearby houses are a right mix of styles and designs then even something outrageous might be allowed.
  24. Must be the only church in Bedfordshire that hasn't had it stolen. I live next door to a church in Cambs. Had most of the lead stolen 2 years ago and the rest last year. Never heard a thing despite evidence they used something like a hydraulic scissor lift to get access to the roof. Fit alarm and floodlights asap if not already got one.
×
×