flanagaj Posted 3 hours ago Posted 3 hours ago We have been in our static caravan now for nearly two months and haven't even started our self-build. The weather has just been so rotten. It's been either very cold, or throwing it down with rain. Are people literally just carrying on in the rain and pumping out filled trenches .... to enable things to progress?
Big Jimbo Posted 3 hours ago Posted 3 hours ago Hoping to start in about 2 month. should be better weather i hope. 1
flanagaj Posted 3 hours ago Author Posted 3 hours ago 4 minutes ago, Big Jimbo said: Hoping to start in about 2 month. should be better weather i hope. So I am not alone in waiting. The sound of the heavy rain on the metal roof of a static caravan is akin to being waterboarded and remaining positive is hard work. 1
Nickfromwales Posted 3 hours ago Posted 3 hours ago 1 hour ago, flanagaj said: We have been in our static caravan now for nearly two months and haven't even started our self-build. The weather has just been so rotten. It's been either very cold, or throwing it down with rain. Are people literally just carrying on in the rain and pumping out filled trenches .... to enable things to progress? Depends if it’s practical to do so, and if you’re in dire need to push on. If neither, then wait it out I guess, but I’d go scatty sitting on my thumbs. 1 hour ago, flanagaj said: So I am not alone in waiting. The sound of the heavy rain on the metal roof of a static caravan is akin to being waterboarded and remaining positive is hard work. Find something to do recreationally, to break the day up maybe. Have you started planning M&E etc? That’s usually a good thing to do well in advance of the actual construction phase. Been working with a client since summer getting all the T’s crossed and I’s dotted, and MBC are now due to start founds end of Feb. Start looking at materials and suppliers, price up MVHR and plumbing, start your electrical layouts and browse light fitting types and where switches will go etc. Design the kitchen / utility and bathrooms etc, go look at showrooms for inspiration and take pics / make notes. I try to do as much of this with clients as possible, well ahead of the busy and brain consuming founds and frame erection. 1
flanagaj Posted 3 hours ago Author Posted 3 hours ago 25 minutes ago, Nickfromwales said: Depends if it’s practical to do so, and if you’re in dire need to push on. If neither, then wait it out I guess, but I’d go scatty sitting on my thumbs. Find something to do recreationally, to break the day up maybe. Have you started planning M&E etc? They’d usually a good thing to do well in advance of the actual construction phase. Been working with a client since summer getting all the T’s crossed and I’d dotted, and MBC are now due to start founds end of Feb. Start looking at materials and suppliers, price up MVHR and plumbing, start your electrical layouts and browse light fitting types and where switches will go etc. Design the kitchen / utility and bathrooms etc, go look at showrooms for inspiration and take pics / make notes. I try to do as much of this with clients as possible, well ahead of the busy and brain consuming founds and frame erection. Some good points there Nick. Haven't really planned any of the stuff you mention, but now is a good time.
Nickfromwales Posted 2 hours ago Posted 2 hours ago 1 hour ago, Big Jimbo said: @Nickfromwales Thats exactly what i am doing Yup. The steel beams that MBC are supplying are currently getting penetrations in them and plating back up so we have a hole for 110mm soil pipe and 4x MVHR ducts, plus some small letterboxes for plumbing and electrical to go through. No extra cost to the client as we planned these well in advance amd the 1st fixes for M&E will just fly in now; I’ve mapped al the pathways and that meant a glulam had to be binned, but just a coupe of clicks in a mouse and it was sorted. Nothing really to drill through as built now, so happy days.
Alan Ambrose Posted 42 minutes ago Posted 42 minutes ago Yeah, we even did some groundworks in all the mud on Monday. I am calling off any day that has more than a few mm of rain though.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now