Posted

I am now in a position to get my design done for PP. I know that I want a super energy efficient house to be as near as PassivHaus standard without certification
i also want to have a quick build with the same company doing the groundwork’s, timber structure, windows and getting the house weathertight with roof to be tiled

any ideas about what companies are good at this sort of thing as then I would take over and manage the rest

thank you for your responses

Posted

Thank you they are  the 2 companies I have shortlisted.

Anyone in the forum who have dealt with these 2 companies: MBC and Touchwood Homes?

Thank you

 

 

Posted

We had quotes from both and very difficult to compare like for like with the variations in what is included. Friends of ours went Touchwood we went MBC.

 

  On 23/05/2020 at 12:57, Balraj Appadu said:

I also want to have a quick build with the same company doing the groundwork’s, timber structure, windows and getting the house weathertight with roof to be tiled

Expand  


Depending what you mean by groundwork’s, I think there is only one company that will do that, so I suspect you’ve already made your decision?

Posted

thank you

However I hear that Touchwood advice is to use AFT for the groundworks as they work with them frequently whereas MBC do everything?

The comparison is about how much the slab & Timberframe cost whether all one by one company or two?

 

Posted

Unless they've changed recently, I don't think AFT do groundworks themselves. They only do the foundation. If they do groundworks, they'll probably subcontract it.

Posted (edited)

As far as I am aware, MBC only design, supply and install the insulated/passive slab.  They do not take responsibility on the  ground work - that is al the preparation for the installation of the insulated/passive slab.  So extract from my quotation from MBC

 

"Supply and fit Engineer signed off Passive Slab foundation system, with a 0.105W/m2.K U-value and Zero Cold Bridges (The client strips the site, installs the first 150mm of
stone and the site roadway). MBC supplies and fits 50mm stone for levelling, the concrete, the steel, and the drainage pipes are brought 1 metre from the finished
foundation for others to connect to."

 

There may be structural engineering requirements for extensive ground works, depending on the specific site and soil conditions.   Some sites may only require 150mm of stone, on which the insulated foundation is normally installed but most require a much more stringent  requirements - because of adjacent existing trees my foundation required a 850mm of stone at the front of the foundation decreasing to 600mm at the rear of the foundation. Other sites have required piling.  

Edited by HerbJ
  • 1 year later...
Posted

I had gone with MBC for the package and foundations but having had a bad ground investigation report MBC say the site needs piling and they can't adapt their insulated raft design for piles.  I need to get the foundations redesigned independently which is annoying as I wanted a foundation/frame package that would get the structure up quickly. AFD will design but don't do the work and I have also asked Abbey Pynford who have pile and foundation package to quote but don't yet know what u-value they can achieve. Has anyone any experience of their Comdeck system ?

 

Posted
  On 28/06/2021 at 11:32, Worthy said:

 AFD will design but don't do the work 

Expand  

 

Will Olof not come and work on site now? He'd previously attend site and install the Foundation and UFH, directing a 2 - 3 labourers supplied by the self-buider.

Posted
  On 28/06/2021 at 11:32, Worthy said:

I had gone with MBC for the package and foundations but having had a bad ground investigation report MBC say the site needs piling and they can't adapt their insulated raft design for piles

Expand  

 

Interesting, we also have a not too brilliant ground report and thought we may need piles but MBC have now said that we'll be OK with hardcore but a LOT of it!

 

During the discussions, they sent us a couple of examples of piling design on which their insulated slab could fit.

Posted

I considered Olof at ADF (great service from him) but ended up using East-Anglian firms for (i) supply, (ii) engineering, and (iii) installation of my 26x screw piles (3x companies who regularly work together). One of the easiest parts of my build so far.

 

Happy to provide an intro if of interest.

  • Like 1
  • 1 year later...
  • 3 months later...
  • 1 month later...
Posted
  On 18/11/2022 at 15:37, Post and beam said:

I beleieve Potton will now do the groundwaorks as well as their Sips/Timber frame house package

Expand  

I'm having a Potton frame installed right now.  I would have welcomed Potton doing the ground works to their detailed designs, but unfortunately don't offer this as of Jan 2023. This has meant I've had to use a third party ground work company. I used the one Potton recommended, who hasn't been able to complete the work within Potton's time frame, which has resulted in Potton fining me a heavy financial penalty.

Posted
  On 21/12/2022 at 09:33, R2021 said:

I'm having a Potton frame installed right now.  I would have welcomed Potton doing the ground works to their detailed designs, but unfortunately don't offer this as of Jan 2023. This has meant I've had to use a third party ground work company. I used the one Potton recommended, who hasn't been able to complete the work within Potton's time frame, which has resulted in Potton fining me a heavy financial penalty.

Expand  

WHAT.....££££££££

Posted

No way! I can understand them wanting the sum that would have been paid when on site and a disruption fee if install team were delayed at last minute but a storage fee is taking the p1%#. 

Posted

I can understand charging a nominal storage fee if they don’t have anywhere on-site to store it. Five figures is ridiculous. 

Posted
  On 21/12/2022 at 16:02, Kelvin said:

I can understand charging a nominal storage fee if they don’t have anywhere on-site to store it. Five figures is ridiculous. 

Expand  

 

does your contract have any figures attached to it?

 

@R2021 if it is storage is there anywhere on a site to put it?

Posted
  On 21/12/2022 at 11:33, Kelvin said:


Storage fee presumably. I have the same risk with my timber kit supplier. They’ll charge me a storage fee if the foundation isn’t ready. 

Expand  

Actually not a storage fee - they will build the frame a week before delivery I'm told. It's increased cost of labour (factory and site), materials and delivery. They hold the price for 6 months but it has taken longer than that for my complex foundations and ground works to be completed.

Posted
  On 21/12/2022 at 16:20, Moonshine said:

 

does your contract have any figures attached to it?

 

@R2021 if it is storage is there anywhere on a site to put it?

Expand  

Unfortunately there's nothing in the contract that specifies what they can charge.  No it's not storage, it's labour, material and deliver price increases over the past 6 months. I see their point that their costs have gone up, but it's not helping my financial viability.

Posted
  On 21/12/2022 at 16:20, Moonshine said:

 

does your contract have any figures attached to it?

 

@R2021 if it is storage is there anywhere on a site to put it?

Expand  


Nothing for the windows and a few hundred pounds per week but I’d have it delivered to site as we have the room. 

Posted
  On 21/12/2022 at 17:03, R2021 said:

Unfortunately there's nothing in the contract that specifies what they can charge.  No it's not storage, it's labour, material and deliver price increases over the past 6 months. I see their point that their costs have gone up, but it's not helping my financial viability.

Expand  


I wouldn’t describe it as being fined a financial penalty. Presumably the contract said the cost would up if a period of time past etc. Ours has increased from the initial estimate we got in the summer too but the original estimate didn’t include all the steelwork, we’ve added an expensive rooflight to the flatroof, made every window 3G and changed one fixed window for double doors. 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...