DragsterDriver
Members-
Posts
416 -
Joined
-
Last visited
Everything posted by DragsterDriver
-
Thanks! I have to say the latest plans do look a bit...meh. I can sympathise with the planner. He seems pretty waspy- I wonder if he’d entertain me emailing him some sketches and photos before redrawing? That’s what does me in- there’s no dialogue.
-
I really wanted this type of dormer and at least a letterbox window to the kitchen. and try to balance the shape of the house a bit.
-
It will have mvhr, one of the issues is it’s hemmed either side by an elevated rail line and elevated road, so the high level windows afford some privacy I can live with that but the cat slides and chimney...
-
From the planners reply it feels like they’re proper against changes, it did go to committee originally. “austere and characterless elevations.”
-
-
Soooo... I have a plot with planning permission for a replacement dwelling. It’s a crap plot, flood zone 3 and railway on the boundary but budget dictates etc. here are the approved elevations: Looks classic ‘farmer house’ to me. Not pretty. i wanted something more modern, letterbox type windows etc: sadly today I received :
-
Builder cut 4.5cm off joists due to floor level screw up
DragsterDriver replied to Loz's topic in General Structural Issues
That’s horrendous- doubling them up is a solution- but they haven’t glued the chipboard to the joists either. Make sure the new joists have egger glue on top. I’d have a good look at the rest of their work... -
Soil pipe across neighbour land broken by them
DragsterDriver replied to ashthekid's topic in Waste & Sewerage
Take pictures of all the existing and all their modifications. Ask building control to confirm they’re happy with it all. the neighbours were definitely trying to bounce you into something. -
Soil pipe across neighbour land broken by them
DragsterDriver replied to ashthekid's topic in Waste & Sewerage
What concerns me is what exactly they’ve done? Because it’s an easy repair, hardest bit is going and collecting a couple of fittings. -
I’ll report back when I get a quote, they could say transformer quick enough though!
-
Cheapest 22mm Egger extra peel clean T&G supplier right now
DragsterDriver replied to Adsibob's topic in Floor Structures
Jewson around here are stocking caber- not sure what I’m paying mind? Norbord and co need to up their production- they’re a pain in the arris at the moment! -
Self build Potton, lots of reasearch to do
DragsterDriver replied to Post and beam's topic in Introduce Yourself
Most look very dated now! -
Oh! mine is a replacement dwelling and U.K. power network are saying they have no spare capacity so they’re lubing me up for a transformer... how about reconnect the old cable? ?
-
Soil pipe across neighbour land broken by them
DragsterDriver replied to ashthekid's topic in Waste & Sewerage
They should replace it. It’s not a big job unless they’ve done something really daft. I presume you’re still using it while they decide what to do? -
Thanks for the reply, I’ll have a good read at lunchtime!
-
Good morning! Dunno if anybody can advise- i need to discharge my conditions before I begin building apparently. I have full planning and have submitted an NMA for some windows etc but i *believe* I can discharge the conditions from the parent permission. is this something a planning consultant would do? The architect/designer can’t/won’t incase further conditions are attached to the NMA. On the slim chance they are I can’t see them affecting the drainage I want to get in thanks!
-
You can get very shallow led down lights
-
I’m thinking of doing mine and the electrician connecting them. The whole MCS is painful.
-
millworks near Cambridge may be able to help? Nice guys- timber costs are just insane though.
-
Ever seen this ventilated ridge
DragsterDriver replied to SuperJohnG's topic in Roofing, Tiling & Slating
Looks good- I really don’t like the adhesive ones -
Our bills doubled with a smart meter. If you suspect your smart meter is wrong you have to pay upfront to have it tested- by your supplier. Huge mistake getting one.
-
Not enough glue in 22mm Egger Chipboard installation?
DragsterDriver replied to Adsibob's topic in Floor Structures
It’s madness. So 25 boards in total-ish? I’d tell him to lift them, take them home to dispose of them and fit new ones in their place properly. Maybe they won’t cut other corners then. -
Not enough glue in 22mm Egger Chipboard installation?
DragsterDriver replied to Adsibob's topic in Floor Structures
His idea will be ‘point’ the edges underneath using a cartridge gun for show. Building regs want to see glue spilling out underneath- has this fella been living in a cave the past few years? -
Has anybody had their build measured on completion?
DragsterDriver replied to DragsterDriver's topic in Planning Permission
sounds like good news!
