  1. I did ask somebody about section 73 and CIL- they said “if the footprint of the building stays the same its not a problem”. this was free ‘pub’ advice mind...
  2. Tile batten has doubled to around £1m and wickes 4x2 cls is now a tenner a length or something insane.
  3. I’m planning to have all my ‘plant’ in the detached garage and ducted to the house maybe 6m away. From asking around that’s fine using ducts and the correct insulated pipe work.
  4. Up first I chose ‘Right said Fred’ in Sheffield building next door to each other. Don’t like the houses, they’re about £300k over budget at least.
  5. As a rule I hate the program ? but fancy watching something timber framed and modern- any episode recommendations?
  6. Generally they seem to be rich people on gifted land.
  7. It’s time isn’t it! Really all you want is some advice from planning- one duty officer could look at plans saying “yes/no/no chance” etc. all I’m mindful of is to get cracking before I can’t afford the materials ?
  8. Usually a massive cold spot!
  9. there’s so much debate I may put a new application in and run it alongside a section 73 see what happens.
  10. the insulated ones should have a mesh embedded slap above- which I’ll put the underfloor in and power float before erecting the timber frame
  11. Roof changes on the front elevation- Existing plans:
  12. That’s what I was thinking! That floorspan system is eps so 200mm is their biggest.
  13. Morning! can anybody advise on my block and beam- what U value i need? not a passiv house but very well insulated timber frame with underfloor heating https://www.floorspan.co.uk/efloor-plus/system-overview/ Thanks!
  14. that’s interesting! I'm now wondering another daft question- can I do the cil paperwork and start groundwork with a section 73 submitted.
  15. “I have 12 inches, but I don’t like to use it as a rule”
  16. That’s really interesting! As a youngster I worked on jobs where the digger driver got his lines wrong ? it occurred to me I’ve never heard of a new build being checked
  17. Seems like I woke up with a daft question- has anybody ever had their build size measured by planning on completion?
  18. that’s the bit I hate- they refuse calls and flat out ignore emails. Unreal behaviour!
  19. It’s about that at wickes inc vat. Learned this week - the USA aren’t buying our ply or osb it’s lack of production by norbord and egger. timber won’t be going down significantly in price.
  20. isover 140mm frame roll 32 is £13m2 inc vat today. can cavity dritherm be used in a timber frame? I don’t know tbh.
  21. yep that’s how I’m looking. Frametherm 140mm has gone through the roof- im now trying to work around that
  22. Travis are raising prices on sawn timber 25% and planed 50% or something crazy on Monday. I wasn’t listening properly in shock- they’re not honouring the price on deliveries booked for next week either.
×
×