Alan Ambrose
Members-
Posts
3133 -
Joined
-
Last visited
-
Days Won
13
Everything posted by Alan Ambrose
-
I would like a double external door, PH level and modern security which I can cover on the outside with old oak planks similar to the barn-like building it's going to go in. Ideally I would like to buy ready-made double door blanks with good quality insulation and a multi point locking mechanism, so I can just cover the outside surface. I know this is not the way that particular industry generally works. Any leads or ideas?
-
Cardboard shims/furring strips for studwork
Alan Ambrose replied to markharro's topic in General Joinery
You can buy a bunch of plastic packers in different thicknesses. This kind of thing: https://www.amazon.co.uk/Assorted-Glazing-Plastic-Variations-Available/dp/B0B21KQJW3 -
Off-peak energy storage for cheaper heating
Alan Ambrose replied to Originaltwist's topic in Other Heating Systems
Even with a highly insulated slab? -
Off-peak energy storage for cheaper heating
Alan Ambrose replied to Originaltwist's topic in Other Heating Systems
I guess the tactic of intelligently heating the slab with UFH, used by a few people here on BH, is the simplest version of this? -
>>> anyone self building from applying for a CIL exemption if they have a holiday home Interesting question. I'm obviously trying to not fall accidentally foul of the rules as the penalty is large. https://www.gov.uk/guidance/community-infrastructure-levy#para082 Individuals benefiting from the exemption must own the property and occupy it as their principal residence for a minimum of 3 years after the work is completed. Now it does say 'sole or main residence' in the actual act: https://www.legislation.gov.uk/uksi/2010/948/regulation/54A and the form to be submitted at the end is this: https://ecab.planningportal.co.uk/uploads/1app/forms/form_7_self_build_part_2_exemption_claim.pdf and says 'sole or main residence' again, so maybe having a holiday home or even a rental property isn't a problem. But nothing about the period where you may have two homes temporarily while you're selling the old one.
-
>>> is the planning permission for self-build housing? There's a couple of plots near me that have been advertised as self-build plots that are not selling and I wondered why they didn't then agree with the LPA to sell them as standard plots. As to the OP's question - my understanding is that the CIL self-build legislation is fairly vague and thus open to interpretation by your LPA (I've never read all the way through it)). I think the only option might be to trawl (yourself or via a lawyer) through the legislation or simply ask your LPA. In any event if your LPA says 'no', regardless of the legislation, I suspect you're not going to court and will have to suck it up. Worth asking though.
-
OK so you're near the completion of your self-build and ready to move in. You've avoided the huge CIL levy payment by correcting filing the CIL self-build paperwork at the right time. You put your old house on the market, expecting it to take anywhere between 3-12 months to complete as is normal. But CIL doesn't allow you to claim the self-build exemption if you have two homes - which you will have from the moment you get BC final sign-off on your new one until you sell your old one. Strictly, 'you're breaking the rules'. Is there any known provision for a grace period to allow for this practicality?
-
Well if the vermin risk is low: 99+% of UK houses use pinned T&E only so that's an option. But you'll of course need to agree any method with your sparky. Discuss the many options with him or her and go from there? Be interesting to know what you jointly decide.
-
I appreciate you would like this solved quick and without too much fuss …. But … I think it depends on how bad the vermin problem is, how difficult it would be to take up the floor again to repair vermin damage, and how difficult it is to wire all the way back to the CU. If your electrician has suggested plastic conduit then it indicates they think the vermin risk is high and it won’t be so easy to take the floors up again. So, if you’re not so bothered by the vermin risk or the floor is just screwed down and easy-ish to lift - then just run standard T&E without conduit as normal. (Or maybe if you’ll be moving in a couple of years anyway.) If the floor is not coming up again for another 80 years or the vermin risk is high or you’re planning to live there for a long time, then I would go a bit off-piste and run singles in metal flex conduit without any sharp bends. Then (a) it will be easy to pull new cables in 80-years time and (b) the vermin will end up with blunt teeth. Metal flex isn’t crazy expensive either. I’ve used 25mm OD / 20mm ID in a domestic context and would suggest that if you have room. You may find one size down will work, but you’ll want to check ‘pullability’. Check that the metal flex end glands work with your back boxes OK. Sure, if you can get all the way back to the CU without too much difficulty then radial if you prefer, but I don’t think it’s the major issue here. If you go for the non-vermin proof solution you might consider an AFDD in the CU to mitigate fire risk a bit. Oh and a flexi for each run of course - there’s no Y connector that will help unfortunately.
-
Internorm fixing straps. Or maybe not.
Alan Ambrose replied to Mr Blobby's topic in Windows & Glazing
So apologies to @Mr Blobby, but having never done it before, this is why I think I'll get a better result on my windows than the average window fitter. -
Internorm fixing straps. Or maybe not.
Alan Ambrose replied to Mr Blobby's topic in Windows & Glazing
>>> do what they always do Which is bodge it in the hole roughly square and then fill all the gap with crazy foam? -
I seem to remember Planning Docs - presumably so they can check that the building is legit and that the costs & materials make some kind of sense for the dwelling. The latter is just my supposition though - knowing central government, it is even more likely there are no checks at all and it's just a tick box item for them
-
It looks like a mis-measurement or mis-manufacture to me.
-
>>> I’ll cross that bridge You're planning a bridge too ?
-
Planning and building regulations
Alan Ambrose replied to Freddie Flintstone's topic in Building Regulations
As a low priority I might email your planners, explain the detail and ask them what they want you to do. They should be perfectly reasonable as you have acted in a sensible and cautious way. In the worse case, they might ask you to apply for a retrospective amendment to your original permission or alternatively for a 'lawful development certificate'. I would present them with the problem though and follow their solution if any. They probably won't care much. You might only care when you come to sell, and then only if it is sometime soon-ish i.e. before the 4 year enforcement period has passed. -
>>> i haven't fitted any of those LED strips yet! You can jury-rig a strip to measure it or just estimate: I suggest the equivalent of 10 x 60W old-style bulbs would allow you 'to illuminate 'luxuriously' during a power cut'. That's about 60W equivalent total of LED lighting. 10 hours of that would be 0.6 kWh, which at 12V is 50Ah - so one typical LA battery. Plus whatever the Loxone rig takes when it's idle, which could be a non-trivial bit. Plan to use one battery and add more if you really need it later?
-
>>> Still looking for a better option ideally din rail mounted. Take a look here: https://uk.rs-online.com/web/c/relays-signal-conditioning/relays/timer-relays/?pn=1&applied-dimensions=4294883333,4292117068,4294571726&sortBy=P_breakPrice1&sortType=ASC RS won't be the cheapest, but most of the stuff they sell is professional quality. You'll probably need to apply a few more filter criteria, check the datasheet etc to make sure it has the continuous cycling function you want. In particular, check the contacts are man enough for the job ('max current') - suggest 3A min and beefier if you want long life.
- 24 replies
-
- 1
-
-
- electric
- background
-
(and 1 more)
Tagged with:
-
There was some discussion on BH on this subject recently, we’re at about 190W background in our place. One way to delve into this further is to use a current clamp meter on the main incomer (one cable only, either line or neutral) and switch individual things on or off.
- 24 replies
-
- electric
- background
-
(and 1 more)
Tagged with:
-
Recommendations for double/triple glazing unit suppliers?
Alan Ambrose replied to Alan Ambrose's topic in Windows & Glazing
OK ta, will give those a try. I also found SealedUnitsOnline aka Ipswich glass. They get mixed reviews, but after calling into their offices and talking to one of their counter guys, I was a bit re-assured. -
Solar panels without batteries
Alan Ambrose replied to Russell griffiths's topic in Photovoltaics (PV)
~1900m2 ! -
Using a diamond core drill. any advice?
Alan Ambrose replied to saveasteading's topic in Tools & Equipment
>>> the length of the diamond cutting edge (and hence friction) is also proportional to diameter, hence the square I thought this, but forgot to write it, duh: Imagine a core drill with one tooth (or diamond grain) which can be magically set at any radius. The torque required to rotate the bit (or equivalently the torque required to hold the drill) will be proportional to the set radius of the drill / cut. Next, imagine you can magically add more teeth to fill the core drill to make it a full circle. The torque required to rotate the core drill will be proportional to the number of teeth. And the number of teeth will again be proportional to the radius. So, the total torque for a normal core drill will be proportional to the radius squared. Of course, there are other factors too. The above will be correct assuming we keep the downward pressure per tooth constant - which means we need to ramp the total bearing pressure linearly with radius. For conditions within a reasonable operating range, you can imagine that the torque required will also be a linear-ish function of the bearing pressure per tooth and also roughly proportional to drill rpm.
