  1. fantasy prices. Like a brick costing £12 before discount.
  2. prepare to be royally bent over. ASHP from city plumbing 2-3k, tank 1k. daylight robbery by plumber 10k for couple days work.
  3. save yourself a lot of hassle, have 400 GAPS not centres so when you rip the PIR you have zero waste. You may need an extra truss and spend 10 mins making the plasterboard work but will save hours and £££ on the hateful task of insulation ripping.
  4. sheet of ply screwed over the glass to 800mm above floor. pass inspection. remove ply and fill the screw holes. end of drama.
  5. yep thats them.
  6. those are metal. looking at the plastic ones.
  7. 250mm for brick and block
  8. Anyone found a cheap source for these ? Really want to use them on the build but £2.50 for a wall tie is a very hard pill to swallow.
  9. Floating shelves are made like a box and then slid onto the supporting battens. You down want 40mm or whatever thick you want 2x 18mm and make a box
  10. tight, lower end kitchen/bathroom can help. how much have you put aside for the drive/garden/patio etc ?
  11. wall makeup ? Insulation ? Rad heats wall. outside gets cold. Dew point is close to inside surface. Dew forms when rad cools down. Just a guess. More insulation to cure.
  12. i like it! Let us know how you get on. Planners are all too hasty to tag on conditions that cost ££££ without the slightest thought.
  13. 150mm is normal bearing for steels, but as George said your probably fine just get signoff from the eng.
  14. thick complaining neighbours really don't effect anything as they rarely complain about relevant planning matters. They are just moaning so can be ignored.
  15. if you can remove it with a machine, its likely that wall will come down behind it though. Grinding just removed the top part from sight, the reason he was leaving you the arisings was so he didnt have to pay to tip them. Either way when it comes to digging the footings the bottom of the footing has to be deeper than any roots visible. Hire in the largest machine that you can fit, ideally a 13 tonner but nothing less than 5.
  16. ouch. paying just under £1 + vat
  17. may be the exception. never experienced any putting our 3 through school. Just young kids who went to collage, learned to teach then back to school with zero life experience.
  18. can still be done with timber frame/traditional at fractions of the cost.
  19. from age 13/14 trade routes should be offered as a replacement for everything but maths/english for those who are not uni material. 4 years of taught plumbing or electrics or building etc by the time they are 18 they just need real work experience. Unfortunately the kind of people attracted to teaching are exactly the wrong type.
  20. im off the same conclusion, ICF kits need to be less than the price of celcons per m2 to be viable in anything but niche builds. Even then they will still be double/treble the cost as you need rebar, conc and an external finish. I cant see an upside to them currently.
×
×
  • Create New...