  1. For completeness, on a previous project, the above information was sense checked with Telford UK, which I then executed. Subsequently, I then employed one of Telford's appointed G3 representatives to inspect and commission for G3 sign off, which was instantly granted upon inspection and with flying colours.
  2. Exacta-mundo, squire. Both PRedV's need to be the same bar value ( eg 3bar a piece / 3.5bar a piece etc ). That makes a retrospectively balanced UVC installation G3 compliant by preventing back-pressurisation of the cylinder in the event of the secondary PRedV ever failing. A lot of plumbers don't have much of a clue of these solutions and just read instruction books on the day. If it doesn't look like the instructions, then it's an automatic 'fail'.... There's always a solution, you just have to get off your arse and go look for it.
  3. Sounds like a lame response without a solution To ‘balance’ the system retrospectively requires two things. 1) add a secondary pressure reducing valve at the cold mains stopcock. 2) fit a 22mm non return ( single check ) valve on the hot water outlet of the UVC. That’s what he should have said to you…….and then he could happily have fitted the chuffing EV to resolve all issues in one morning.
  4. Builders feelings set aside, what is the level of the invert at the road to where you need to discharge from? You’re appliances can discharge up high, like 600mm off finished floor level. Can’t they then just meet a spur off the existing drains?
  5. “Luke……I am your farter” ?
  6. Get rid of the T before the tundish. If you’ve no more height to play with, T the 22mm D2 as low as you can, do a second riser and fit a second tundish. The swirl of water hitting that T as is, will see water going everywhere except into the tundish. A strange phenomenon but ask me how I know lol. Nice work btw. I’ll look again later to see if I can add anything more. Get some Munson rings on, and then you can lose the battens and insulate freely.?
  7. They're too short-handed to sort that in 9 days boyo.....
  8. You have a cold, stone heart. If you didn't have a lump in your throat at the end of that then you must be deader than Scrooge McDuck.
  9. We're in very high demand
  10. They actually use very expensive breathable paint specifically selected for application on ‘wet’ plaster. I asked when I did DIY SOS in Swansea. Not a single corner cut on that one, and I expected to see some being cut of course. I think the unfortunate folk who benefit from such help would not give a toss about some shrinkage cracks, nobody in a Persimmon or Wimpey home do, and theirs take a lot longer to build
  11. Preferable yes, but you need a good spread to get things dragged and floated on the first sets so the end result is flat / plumb etc. For D’N’D I now stipulate a minimum of 70% adhesion, plus a continuous bead around perimeters / sockets etc. All methods can be done badly so it always falls back to the tradesperson undertaking the work, every time.
  12. It’s 40mm minimum if a 32mm waste plus the thickness of the fitting has been lost. So ~60mm of brick plus ~15-20mm of cement render & plaster remains. Not going to fall down any time soon, but probably best to confirm this isn’t taking the hop of the roof or chimney etc before ‘accepting’ this compromise.
  13. I wish you were around to show a few guys I've met exactly how to D'N'D properly mate. Some are still out there working with 12 miserable dabs to a full board
  14. And then you're at the mercy of the shape / state of the walls. No thanks! No blockwork walls go up precise enough to do that, none that I've ever seen anyhow, so all of the kickers in the blockwork and the out-of-plumb bits transfer unhindered to the plaster-boarded face unless you go about spending an age packing and levelling each batten. Even then you only get a vertical batten but you don't get a straight wall as each batten is not flush with the previous / next batten unless you really turn into the batten fitter of the year. Pointless ball-ache. Chase the boxes in 15-20mm, clip the cables to the blockwork, parge the boxes in, and dot n dab to an immaculate flat, straight wall. Plasterer only has to finish then as opposed to dub and finish.
  15. It's all down to quality of work, whichever you chose, and attention to detail. I would parge the blockwork, fill and smooth any chases / back boxes etc, foam and seal joist pockets / other penetrations to atmosphere if you have them, and then dot n dab. You won't get a plasterboard / thermal 'tent' if you mitigate against it. Knowing how / where to successfully mitigate is the key to success.
  16. Yatzee! I automatically assumed vertical chases. That's a chunk missing from that wall. Sorry, I now agree with your concerns. Yup. 100% or popped the floors up. At the very most I would have removed just the render and set the waste pipe as far back as possible to reduce the footprint of the boxing in. Not even sure if backfilling with a stiff cement compo would satisfy here.
  17. We retrospectively cut doorways into load besting walls, so a bit of chasing will be of zero detriment. Electricians will do that 4 times or more in the same wall before breakfast. Zero BCO or structural issues / concerns have ever been raised in the last 25+ years of doing this exact work. Time to put more tonic in with the gin
  18. They’d use piss coloured cement then most prob ??
  19. Just wait until the BCO see's it and condemns the work. Totally crap workmanship.
  20. Just screw them down a-la @PeterW’s advice! Making holes in membranes is neither here nor there. Failing to keep your UFH pipes down on the deck will be a multiples of £1000 fcuk up with no chance of repair. Seriously……. Just drill the 6mm hole for a concrete screw, then immediately prior to putting the screw home fill the hole top with sealant, smother the screw thread, wind it in, and repeat. This will be of zero detriment to any of the layers. Screw them down or prepare to fail.
  21. UFH can be pushed into a convenient corner. UVC needs priority. That’s how I set out for all of my M&E projects, with priorities appropriated.
×
×