  1. Usually you just use insulating tape and bind the two together, or the rods are threaded ends and you have a hoof or eyelet accessory that you use to fix the loose strands of cable to. Best to strip some of the sheath back so there isn't a nasty shoulder that meets each turn, vs having the strands (parted cores) and the rods first, then the sheath etc 300mm further downstream to make pulling it in easier.
  2. Ok, we'll ignore you lol. Sometimes with a tile like that centring the gadget over the tile can mean that you then end up with a skinny rip of tile in the corner or end of wall, so you favour the shower being centre, and the tile cut being whatever, depending on your level of OCD; freakish to stratospheric etc. That make sense, #strato-boy?
  3. Can you tell is why that section is so wide? Is it an old fireplace? Or a cavity wall with a chunk of dot and dab etc? Props will only shift if they’re on something soft, and also if you’ve not used enough of them.
  4. If PB and skim, you only need to deal with it (internally) for FR, unless otherwise specified by the BCO. You need to get some clarification here tbh. If they’re happy with the rest of it painted (external element) then happy days. If you need a structure to affix the alu cladding to, then another option would be 9 or 12mm cement board which would negate the paint (you’d have to check with BCO but they should be happy with that), as long as joints are sealed with FR mastic
  5. There are options for 22mm chipboard routered out, or insulated panels routed out (for the pipes), so get some googling done and check the responses here for related content
  6. Who invoiced you? Subby or OSO? If you want an accumulator you can bolt a frame to the brick wall and mount it on to that. Local steel stockist should be able to fab something for you with ease, and then just bolt in place. Entire weight supported by masonry; I usually do outriggers to rest on timbers too, to help out, but would need more pics and details to advise. That’s doable. If OSO billed you, they need to put it right and you should only be dealing with them; after they middle-man’d you out of your money. If you went to a local all the money would have gone on the job, not have got split between the guys and OSO……
  7. Maybe a IR thermometer will help. If you start at ambient and run the water to recreate the issue, if cold (street temp) water mixes through that valve you’ll be able to watch the temp of the brass dripping all the way down. Grab one locally in Screwfix or cheaper on Amazon etc.
  8. Is the steel exposed to the room? Or will you stick PB to it so you can paint cosmetically?
  9. You are allowed “deviations”, so that may well be in check. We do all often jump too quickly to the pinnacle, but life is life, and 80mm will have to suffice if that’s all you have. At this stage id defo explore doing away with the screed as you do not “need” it. Then the entire build up can be insulation.
  10. If a refurb or addition, folk don’t have the luxury. 100mm minimum if heated, 120-140 would be much better. @paro I’d ditch the screed here and beef up the insulation. Fit an overlay UFH system (see Wunda website, good vids/info there) and then bond your hardwood floor directly to that.
  11. You could stack 2 lots of 225x25, you’d just need to get inventive on the connections to/from, but doable. As far as temp is concerned, flow rates won’t suffer but you will get condensation I expect. That means the ducts need to run downhill to the outside wall so they can drip dry. With 2 lots of 225, you’ll have space for some insulation under the lowest one so that issue would be reduced significantly if avoiding using the full depth of the insulation to fit the duct.
  12. +1 on needing trickle vents. Won’t pass b regs, and would make a horrible home to live in.
  13. Doesn’t need to be FR PB unless it’s not being skimmed. Regular (white) PB + skim gives 30 mins FR. If FR PB isn’t getting skimmed then you need 2 layers, joints staggered, gaps/joints filled with intumescent caulk. BCO’s ask for this all the time until I push back. A lot just say what they’d ‘like to see’ vs actually state the regs. Only time this all shifts is when it’s more than a 2 storey building.
  14. Hi. If this is a standard domestic residence, you only have to apply intumescent paint if the steel is visible at the point of completion. If it’s behind (regular) plasterboard and skim it’s already got the requisite 30 mins FR, so no probs; unless your BCO says different? A lot do, so I suggest you challenge and then they’ll back down, as long as the steels boxed in/is set into the fabric of the build.
  15. Doubt the wall will have any stability if it’s not mechanical tied in at the end. You’ve tried to avoid the detail, lol so I’ll try to avoid telling you I’d make it the better job and remove the walls and replace with stud and insulation or just the insulted boards as you say . Assuming you’ll need insulation 3-4 sides around you’ll be better off either the timber frame (3x2) with PIR inlaid, and another 25mm over the front of studs (if you can afford to lose another inch of interior space?). Building control may allow you to just dot and dab insulted plasterboard straight on to the external leafs, if so, removing what you’ve done will free up more internal area, assuming you’re already allowed to just insulate the side wall then you should be allowed to do the same 3 sides around? Obvs ceiling insulation needs beefing up too.
  16. Is the plumbing all sealed and pressurised, eg no gravity systems present? That joint looks like it has weeped and just sealed itself with the crud, as both joints should look similar, they don't. Only fear would be if they were gravity (low pressure) atm and then you convert to a pressurised system downstream and then this becomes a problem.
  17. Option 2 prob best, but will need the stop and the red area painting again to blend in satisfactorily imo.
  18. Just needs to be a stainless cylinder afaic, as this will outlive both of us, whereas copper will not. 100% avoid glass-lined cylinders (you can tell when it's one, as these have electrically powered sacrificial anodes). These often rot from the inside out, and are utter crap.
  19. It's just a jump up to 28mm from 22mm then. Scan read it whilst multi-tasking, which never goes well. TBH all the Telford cylinders at 250L and upwards come with 1" BSP (so 28mm) connections/coil, so not sure any would impacted by being on 22mm if the cylinder volume is that much lower and it had less work to do?
  20. Go to Trevor at cylinders2go (Telford) and mention my username and the forum, as he's given favourable rates to many other members here over the years
  21. Make sure you absolutely do feck all for the 3 weeks, as the body will recover so much better/quicker if you leave it alone to do so. Same advice I had to follow with my Distal bicep tendon rupture.....11 months to recover from that.
  22. We'd need Sigourney Weaver to help out......🔥 👽
  23. Tell him "guess what you're doing this weekend numbnuts......"
×
×