Jump to content
  • entries
    8
  • comments
    159
  • views
    2410

We’ve moved in!!!


Grosey

14250 views

Woke up this morning in our new home! Now sat on the sofa watching tv in my new home, waiting for a full day of rugby TV to start so I can sit and sip cold beers in my new home!

 

Can you tell I’m pleased?!

 

Facts and Figures 

 

1 year, 1 month, 14 days

(Breaking Ground to Moving in)

 

4 Double Bedrooms

3 Ensuite

1 Family Bathroom

1 WC

Open plan lounge kitchen diner

Utility Room

Double Garage

Workshop

 

 

Land: £120k

Build Cost: £200k

Size: 300m2

Cost per m2: £666/m2

 

(This figure is slightly off as a large part of my ground floor is garage / workshop space so can’t really be counted as fully costed m2. However I’ve also got a £30k retaining wall in the ground floor section that wouldn’t usually form part of the cost per m2. Either way I think I can happily say I’ve built for approximately £800/m2 which I’m very pleased with)

 

Photos below of all the finished areas. Garage and outside space an ongoing project!

 

 

40E53814-47F3-4B22-AAB8-370F2A8A93E3.jpeg

B1C5A6E1-0698-4336-AE75-5D783C75D676.jpeg

4DE97BC1-DBBE-44D6-A10C-C90496BD8032.jpeg

AF82C9BE-9EE7-446F-8FCB-B70CC65B82CA.jpeg

785BADFC-1A2A-4B8D-AED1-9DB8154B72F6.jpeg

6BF68C4D-F63D-4230-B494-4E57593FA345.jpeg

2A2465F5-1B77-4BB0-85D1-582FBBCF1A1E.jpeg

78B3E7E2-9687-4E14-87E6-A033DE5278A6.jpeg

B86EDD43-0460-416C-8144-06AD13DA0C55.jpeg

A8C2A3EB-8629-4EAD-A827-76D0A5FD8BF8.jpeg

FB2D5589-8CCA-40BC-B048-1DE681DD79CB.jpeg

B6476F4B-07C9-4246-823C-F32490FDF950.jpeg

99C751CF-E968-4B07-90D9-87F1CF92E0CF.jpeg

EC550C87-FEE3-4CAD-BF8D-F4F59106E5CB.jpeg

ACF91F26-5F94-4181-AE49-3FAD17993179.jpeg

9D1454DC-0A08-44D2-B49E-B8ED5096889A.jpeg

98BE8075-EFA0-4310-81F8-E3DB2D1EE2D2.jpeg

9C19684C-DA35-4F9C-8855-E1B77F733181.jpeg

1C83A754-B366-4DB4-9334-5E16538BE88B.jpeg

1F7FE516-F7A5-4620-8826-878762D41B65.jpeg

B7818931-06F5-405E-95E3-7F1D23AAF1C5.jpeg

6CB73CD9-28CF-4C9D-B8DC-0A214E98D56C.jpeg

FF738ADE-5F19-468E-BD55-5EF265E64504.jpeg

D8E845D6-194D-4A05-9E1A-32D6A8BC15F3.jpeg

D7FA60F0-3E0C-4EFB-BF15-1269A5058973.jpeg

A11A4400-1D30-4C02-93BE-A0A5A2D0B314.jpeg

19B40814-402F-4D80-B0A7-E166FFD06CEE.jpeg

48780216-2635-4D00-910A-FE07F5CD5A2F.jpeg

529F8959-A654-4A32-AF97-5E2095D763D6.jpeg

58301A3B-765B-403F-B24B-C4AE90BAF5B8.jpeg

FDD1740A-837E-49EA-B7B9-B30F75C0C8EC.jpeg

F1AAB296-090D-4F18-A295-7BDFF6B3DB2A.jpeg

5F1E91E6-A495-457A-8098-862DE87F3949.jpeg

3E4B1A5B-F136-4AEB-A872-780E12AF9699.jpeg

C35CD9C7-5800-41A1-B893-D73B41036A42.jpeg

9B6A8DDC-19AE-4922-A170-E12FCFB5F760.jpeg

5717D225-E175-497A-8341-2FF2BAD6005F.jpeg

11138FA7-703D-4E3A-BD3C-E54D247A0316.jpeg

F877CE3D-C264-4031-9FA6-65FC2F6C6EC4.jpeg

79B23F9F-3279-44F4-93B9-0E7049EF1F1B.jpeg

3ED33A7A-CF2B-4E74-AF93-1BA93B146497.jpeg

61921183-CDFA-4F11-9FF3-456DAB726B1B.jpeg

D954938C-3341-4125-A151-7A2F87B12DE6.jpeg

1B59F0AA-27CC-4978-9510-B26DECAE8CCF.jpeg

  • Like 10
  • Thanks 3

50 Comments


Recommended Comments



Thats fantastic news, well done.  Does the construction figure include vat ?

Edited by JamesP
  • Thanks 1
Link to comment

It's a great feeling to be able to finally put the feet up and relax and enjoy your house. Your house looks really well. Congrats and come on Ireland!!!

  • Thanks 1
Link to comment
5 minutes ago, JamesP said:

Thats fantastic news, well done.  Does the construction figure include vat ?

 

Yes it does actually, hadn’t really considered that, not sure the value of the receipts in my vat folder but it’s at least £10 - £15k i’d Have thought. 

 

Although when I reclaim that money it will go back in to the house somehow. So I guess the figure is still accurate. 

Edited by Grosey
Link to comment

Great stuff!

 

That look on Rodger's face with his ball that says "So you'll have time to play with ME now?"

 

:)

 

  • Haha 1
Link to comment

Congratulations, it looks great and must feel amazing. Internal doors are certainly on my wish list. 

 

How you have managed to achieve this cost I don't quite understand - but this is certainly a question for another day. 

  • Thanks 1
Link to comment
11 minutes ago, oldkettle said:

 

How you have managed to achieve this cost I don't quite understand - but this is certainly a question for another day. 

 

I’m sat here mulling this over myself to be honest and trying to see if I’ve made a glaring error anywhere but I don’t think I have. Here’s a quick breakdown, I’ve done a LOT of work myself which is where the savings come in. £100k buys you a lot of materials!

 

Watertight Shell (Materials & Labour contracted out to a builder) - £85k

Rendering & Plastering - £6k

Electrician - £3k

Plumber - £1k

Tiler - £2k

 

Thats the only labour bills I’ve paid. Leaves approximately £100k for the internal build and finishes. 

Edited by Grosey
Link to comment

Warning. This thread contains serious house porn. Likely to create envy amongst self builders who are a long way from finishing.

 

Looks fantastic and your price per square metre sets a target for the rest of us to aim for.

  • Haha 2
Link to comment

Congrats! 

Which seat in the living room is "yours"?!! 

Thanks for all the photos, really inspires me to get up off MY backside!!

 

Link to comment
5 minutes ago, mike2016 said:

Congrats! 

Which seat in the living room is "yours"?!! 

Thanks for all the photos, really inspires me to get up off MY backside!!

 

 

Haha left of the black sofa, view out the window, side table for my pint! The middle section is an electronic recliner so it folds out and makes the whole thing one big living room bed, I plan to be found here snoozing quite regularly over the coming weeks!

 

highly recommend self build to anyone reading this and not currently doing it, we could never have afforded to buy this house so sitting here now I’m feeling extremely chuffed. It’s only work, and it’s really not that hard, get on with it and get it over with. 

 

I wasnt one one who was in it for the enjoyment of the process, it was always a means to an end so I never found motivation an issue, the sooner I start the sooner I can finish ?

  • Like 2
Link to comment

Man, I hate people who finish things they start. It's a sickness.

 

That's an amazing level of finish for the price. No way I'll be sharing what we've paid to date... :/

  • Haha 1
Link to comment
9 minutes ago, jack said:

Man, I hate people who finish things they start. It's a sickness.

 

That's an amazing level of finish for the price. No way I'll be sharing what we've paid to date... :/

 

Our only splurge is the kitchen really. (Was ALNO, ended up as Kesseler) Everything else is from “regular” suppliers, I spent 30seconds on megabad before realising it would send the budget through the roof. 

 

Stairbox stairs

b and q utility room

travis Perkins doors

Victorian Plumbing

Victoria Plum

 

We bought the best in the range from cheaper suppliers as opposed to budget ranges from expensive suppliers. Seems to have afforded us a nice looking finish that the layman would think costs a lot more than it does - I know it won’t fool anyone on here though haha

 

Will get some estate agents in this week and see where we are with valuations before deciding how much to spend on the outside spaces. 

 

Link to comment

Absolutely concur with those comments above. The house looks great - I particularly like the wooden flooring, nice wide boards to it. To achieve that on the prices you have mentioned is simply the icing on the cake. As mentioned above, perhaps a new thread could be created to discuss those prices as the costs you paid for the electrician, plasterer, tiller and plumber  are well below what I have been quoted recently for a 160sq m build. Enjoy the rugby! ;)

PW.

  • Thanks 1
Link to comment

Well done.  Would be really interested to hear more about how you achieved the build cost you have, and the time commitment you put in (accepting a large part of the build cost saving was your own labour) over the course of the 1 year, 1 month.  Do you owe friends etc who may have helped with various tasks an equivalent amount of time back for example?

Link to comment

I think i’ll do another post then, and give some more of a breakdown on how The budget panned out. 

 

If if there’s anything specific anyone wants to know just ask, I’m happy to share any details on costs or how I got things done. 

Link to comment
16 minutes ago, Tennentslager said:

Lovely post @Grosey really made me smile, you've done an amazing job and created a nice blog too.

Smashing ??

 

Thank you I appreciate that, the blog fizzled out as he work ramped up. But I think most people are more interested in photos than pages of writing anyhow. 

Link to comment
5 hours ago, jack said:

Man, I hate people who finish things they start. It's a sickness.

 

You're gonna love me forever then! :)

 

@Grosey, unless I missed it, where did you live during the build?

  • Like 1
Link to comment

@Onoff Firstly with my in-laws, however soon after we started they came to see the progress, really liked the spot, noticed a small development of 3 houses being built nearby and decided to buy one of those. Their house went on the market and it sold within a week - so we were evicted mid build :D 

 

So cap in hand to my parents we went and moved in there. Fortunately both sets of parents houses were within 2 minutes of the build so it made it very easy to pop to site whenever required. 

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...