yes will be fine, they will be compacted before laying the pavers. insist on a full bed not spot laying.
-
P'Permission, Building Control, Freedom Of Information Requests
Dave Jones replied to PXR5's topic in Planning Permission
something about building brings out the hate in people. Just ignore them, BCO certianly will. They have seen it all before nimby neighbours moaning about every little thing, noise, deliveries, etc etc you have to develop a thick skin and just be polite and firm to the moaners. get a body cam if it gets really bad so you can capture evidence. -
dont forget the door threshold as well. ACCESSIBLE LEVEL DOOR THRESHOLDS INTO THE BUILDING Entrance door to have an accessible level threshold provided with a weather bar (maximum height 15mm) with suitable drainage channel. Landings to have a fall of 1:40-1:60 away from the door. Principal entrance door to have a minimum 775mm clear opening between the door leaf and doorstops.
-
path looks ok, the regs in England: LEVEL APPROACH Provide a level approach to the principal entrance door no steeper than 1:20 and at least 900mm wide, with cross falls no greater than 1:40. Approach surface material to be firm, non-slip and capable of supporting the weight of a wheelchair and its user (loose material such as gravel and shingle would not be suitable).
-
Building control - velux window, hight from floor
Dave Jones replied to WillAE's topic in Building Regulations
not necessarily, NHBC allow a +/- 100mm tolerance for guarding. They have a bulletin for it https://www.nhbc.co.uk/binaries/content/assets/nhbc/tech-zone/nhbc-standards/tech-guidance/6.7/tg-6.7-20-guardingconsiderations.pdf -
ahh ok. wouldn't though you'd have much need for those in scotland!!
-
What to get in terms of WWHRS?
Dave Jones replied to anonymous's topic in Environmental Materials & Construction Methods
we are using the recoup column unit, they only work for showers is my understanding as they need a constant cold feed to take the heat. We are plumbing all the showers (4) into a single unit and insulating the waste feeds to the unit. -
whats with the prison bars ? Temporary protection ?
-
Block and Block with 180mm cavity instead of Isotex ICF
Dave Jones replied to Chanmenie's topic in Brick & Block
so your fitting your cills below DPC or your FFL is above dpc ? definitely cold bridging there as the screed is exposed to an external wall albeit not a lot. marmox solution keeping a consistent DPC and mitigating cold bridging is better solution albeit more expensive. -
Block and Block with 180mm cavity instead of Isotex ICF
Dave Jones replied to Chanmenie's topic in Brick & Block
thermo's will get you a sap fail for mitigating cold bridging as they don't stop it. The stock marmox detail is a little wrong for us as it doesn't show the screed and insulation travelling over the cavity. it looks like this for door reveals. An upstand isnt really needed in the reveals but without the marmox you are directly heating the ground outside with your slab. not a good idea. -
more too it than that. You need to set your finished floor level and work down from there. This will largely dictate what you use. For example, if you are on roughly level ground your FFL/DPC would be around 150mm above that. working down: screed - 75mm insulation - 300mm EPS Beam - 150/225 depending on spec brick to sit beam on 75mm trench block to give 150mm clear space below the beam 225 so as a bare minimum you are into the ground 675mm already and this assumes your drains work with this. So a 1m footing would only give you 325mm of conc which wouldn't be much, BCO like a min of 600 which now puts you at 1300 into the ground etc. It's a cost equation between muckaway vs conc cost etc
-
Block and Block with 180mm cavity instead of Isotex ICF
Dave Jones replied to Chanmenie's topic in Brick & Block
interesting about the wet cav, do you have to reapply the treatment annually ? ref cold bridging, your detail fails current sap specifically 1A and 1B. Photographs have to be provided showing how the cold bridge has been mitigated now. The plus side of marmox allows the doors to fully sit on the external skin and still be thermally broken and fully in the insulation envelope. Here is the detail, we have level threshold so the marmox wont be seen as its underground. -
We got our as-built EPC
Dave Jones replied to Conor's topic in Energy Efficient & Sustainable Design Concepts
probably be a C / B on the new regs, they much harder. -
We got our as-built EPC
Dave Jones replied to Conor's topic in Energy Efficient & Sustainable Design Concepts
is this old regs ? -
those metal boxes are crap, no strength to them at all. noggin wont move, ever.
-
another reason to ditch the stuff. yes it will take fixing from thermally broken mushrooms. You see a lot of bodges using various types of cheap plastic sheets that are not brought down the walls, all useless.
-
wet EPS is a leak, its summer you shouldnt be getting tons of condensation anyway. Alutrix as a VCL on the warm side, lapped down onto the internal walls. Insulation above (or up onto the parapet walls if you have upstand)and sealed with a weatherproof covering, EDPM far more forgiving than fibreglass. Get the installers back to fix the leak.
-
Garden Room Timber Cladding - No Roof Overhang. How to Vent?
Dave Jones replied to Davieboy84's topic in Garages & Workshops
these cold roof abortions rely on not much condensation being created internally in order not to rot out. -
Best dmvhr?
Dave Jones replied to anonymous's topic in Mechanical Ventilation with Heat Recovery (MVHR)
the single room mvhr units with heat recovery look good, they talk to each other etc. bpc sell them -
CIL Liability
Dave Jones replied to LiamJones's topic in Self Build VAT, Community Infrastructure Levy (CIL), S106 & Tax
self build = zero cil -
put a bee brick in our garage, have to look after nature.
-
Does this quote look OK for a 3 bed mid terrace roof please?
Dave Jones replied to thnj's topic in Roofing, Tiling & Slating
price not too bad, id engage building control to inspect it to be sure. -
My guess is you have a leak not condensation. fibre glass is crap compared to EDPM.
-
you have a cold roof so you need to maintain a ventilation gap from the eaves to the ridge. if your not making the loft a habitable room just add more loft roll.