Jump to content

Dave Jones

Members
  • Posts

    3606
  • Joined

  • Last visited

  • Days Won

    11

Everything posted by Dave Jones

  1. take it off and scribe it.
  2. use polymeric sand instead of kiln dried and then spray a sealer on top.
  3. don’t use thermostats . Full weather comp is way to go . Flow temp set and forget
  4. in fairness who drew this really poor design element? minor change in shape and size of those windows to butt up the roof would have saved a lot of cost and hassle from the start.
  5. really need a setup that constantly monitors the changing dewpoint and adjusts flow temp accordingly. I use Home assistant as it talks to the Panasonic aquera directly so makes the whole thing seamless.
  6. stub cill is same width as the frame so there wont be any sticking out.
  7. your altering an existing home which is completely different to building once from scratch.
  8. Correct as its not home insurance. Move into a building site at own risk!
  9. more than likely it will be 75mm as this works brick to DPC. Personally prefer the dry screed over the wet crap any day of the week. Dont buy the hype its perfectly level. whats your issue with just cracking on with 75mm ?
  10. i would bet you were not in fact covered and come a serious claim it would hit the fan. Home insurance needs a home which isn't created until a completion cert is issued. Prior to that its contract works insurance.
  11. nice brickwork. tiny windows though ?
  12. what did you pay for ? strip the whole lot off, new firring strips, new osb etc or just an overboard ? pay cheap pay twice.
  13. replace the window for a wider/narrower one to give you some height ? Good example of an architect drawing being total crap when it comes to the reality of building.
  14. cranked ceilings are a massive pain, if you remove the insulation at the corner to allow airflow you will have a cold spot and black mould. could allways fit a single room MVHR unit to take care of the humidity.
  15. awful design to squeeze in 2 windows. lead would be my preferred osb under it. could use rubber also. would have looked soo much nicer if those roofs were joined.
  16. you said air test pre-plasterboard ? Would be hard with ceilings open to trusses no ?
  17. wont help unless the eaves insulation is removed though.
  18. contractors all works when you commence. high 4 figures.
  19. yes, you have blocked airflow at the eaves. It needs to freely flow under the tiles and exit the ridge.
  20. £60k for 3 days work is a bit tasty. Have you had the foundation designed by an SE ?
  21. they wont care means nothing to them. been there done that.
  22. if the real QS is 700k then it will be loss taking into account he plot/clearance costs. Can see their point, they have to pick up the pieces if you fail and still cover themselves. What m2 cost are you at with your materials only budget ? less than 50% of reality i would guess.
  23. sell whatever you need to sell to get it rendered. It's your external weatherproofing. Shame to ruin the rest of the build due to weather damage over the winter.
×
×
  • Create New...