Jump to content

nod

Members
  • Posts

    10418
  • Joined

  • Last visited

  • Days Won

    72

Everything posted by nod

  1. Yes we have had two taps for years Great also for mucky boots Simple to install
  2. Some SEs prefer mini piles others hate them and would rather deep We were surrounded by hundreds of trees on our previous build and on clay We used deep strip foundations Around two meters and Clay board to help with the heave Came in at around a third of the cost of piling
  3. Are HPs really so noisy I worked on a site of 120 home back in 2008 Most houses set in lines HPs next to each patio door I can’t remember noice being an issue
  4. Great post Ian and will benefit many self builders in the future It’s very easy as a self builder to think Why me Why am I being treated like this by planners and others Especially when you see a nearby application fly through planning without any fuss If you where to google the term self builder I’m sure your name would pop up somewhere More hardcore self builder than typical
  5. Definitely
  6. Ian’s your man Looked pretty smart from memory
  7. I give a no quibble five year guarantee Any issues will surface within that time
  8. Definitely
  9. Our son has a body shop and while he hates Electric vehicles He says Tesler are surprisingly well made Though he would prefer a key Rather than a card 😁
  10. It’s a quick and easy repair on a small area As a contractor I use 1000s of meters of cement boards and there’s no difference between any of them Other than Knauf are 40% more expensive than what I usually use Over lockdown I was bringing them in from Poland without any issues It’s pretty poor Johnson’s are looking for lame excuses Rather than getting to the bottom of it I’ve stopped quoting for Webber Rend jobs Due to the reps all following the same line when there’s a batch match issue
  11. Bringing in a a surveyor for a single house can be overkill Most of the builders merchants offer a QS service Usually a one off payment of about £500 You simply need to send them your building regs submission and they will do the rest
  12. Still not to bad considering price hikes About double the cost of slate
  13. Most of the screeding companies will do both Rather than the other way round
  14. You need to be very careful Someone I worked with installed one on a canal boat which went badly wrong He survived but his wife and children didn’t He worked as a gas engineer
  15. I’ve just done one They normally have a jubilee clip to hold in place
  16. Ours has been running for five years now We haven’t touched it since I installed it
  17. Spons is a very rough guide Companies are basing there quotes on how much work they have in Especially one off jobs
  18. Just a tip if you font already know Dont put membrane under the lead It can cause issues with condensation Building paper is needed
  19. I’ve just finished installing 60 meters of valleys Code 4 is fine for virtually everything Though I got my mate to make me a tray for the chimney and he advised code 5
  20. Lots of online testers will come out for one home £200 max £600 and needing multiple homes sounds like a scam
  21. If you read it properly The price is for supplying and erecting studs with a skim finish I price these everyday Your probably used to Mybuilder quotes
  22. Dark oak Love the tree stump Brilliant
  23. The price is for the amount of stud work built and skimmed So say you had 60m2 of stud to create the rooms You would be about £2500
×
×
  • Create New...