Been reading the Forum for relaxation for a while but had not joined. Recently stopped hands-on Green Building but 130m2 wood-fibre EWI, new 3G windows and small timber-framed extension to do on my own house this summer. Caught out, as many have been, by long lead-times from quote to delivery, but even more so (and less expected) by long gaps between enquiries and quotes. When not doing this I do retrofit surveys and teach Eco Refurbishment.