  1. If you wanted to, you could expose the pads and insulate them. It's diminishing returns though for a smallish benefit a few days per annum. I can't see that replacing with glulam is cheaper, but it's certainly easier. A builder would prefer to replace the whole building. A self builder is converting and working around issues, and surely was attracted to the building as it is?
  2. I've done a similar conversion, but for an office. I think we clamped timbers to the purlins, so they stayed.
  3. He said he wouldn't even necessarily do a site visit either! What exactly is the point of them??? Very important role. Reading on BH we hear of bad experiences with incompetent builders. There would be far more problems without bcos. These could become big issues to later users of a property. Then there are the incompetent self builders....they aren't on B H of course.
  4. OK. You can't drill into these so it needs another solution. There are a few ways to deal with it. SE essential. Architect not but... The SE can specify construction but may not be great on layout and appearance and building regs other than structure. Ask them.
  5. The beams will be about 400mm deep. To minimise intrusion to the room, the joists can be inset. What will the atrium walls ( and external walls) be made of? It's good to see you enjoying the development of the design. I'd say work out the room layout and then get an SE.
  6. They don't know everything. The fee doesn't allow much time for research. It is easier / less risky to ask you to do more than less. I suggesf you just say that you've decided to tape and joint instead.
  7. In a way it makes sense to have a stab at the beam depth to see if the geometry of the house works at all. So here is my advice. A 20m spanning beam is impractical, and would be very deep. Perhaps over 1m. More likely a complete portal frame of 2 columns and a beam. Try that. Then revert to getting professionals in sooner rather than later. Why do you need a 20m clear space?
  8. I'd have to check, but I'm 98% sure you don't need to skim. You could ask him where it says so. I suspect he's bluffing it. I went on a fire course where they showed an actual fire test, that demonstrated that even open joints ( exposing a few mm of timber) stayed integral. That's just btw, for your comfort. You'll be filling and taping?
  9. Hi. Good luck. Is say £200/ft2 is feasible with luck, design skills and close management. Atcost was purely a concrete frame system. Latterly they started using steel purlins instead of concrete. That is a big advantage in refurbing. What is yours? The system was used for industry as well as agriculture so is not in any way less adequate. I think the trading name may still exist. The SE has so far been employed to confirm to the planners that this is a structurally sound building, that can be converted. Ie it doesn't have to be demolished or otherwise replaced. It is likely to need strengthening for domestic use. Mostly because safety factors need to be added, whereas agricultural buildings don't have them. That might include underpinning. I'd contact an SE now for a walkround with comments. Try phoning the one who did the report. You won't get builders' quotes until you know what has to be done. That SE is priority again.
  10. Bad of me. Thanks all. I have read it all and will read them serially soon and probably have more questions.
  11. I would lay a polythene sheet over the ground (solum) and simply turned up the walls a little. That will keep most of the damp out of harm's way. Use a sturdy matetial as youll be treading on it.
  12. Exactly. The tree officers concern is the trees, not the building. A garage could sit on the surface with a light structural raft. A house will be completely different. 2 economical choices Crossover A simple slab with no foundations But.....* I'd do the x-over. The last time I did this to lock planning, we just did hardcore. BUT the planner wanted to see the complete design and bco approval to show it was relevant.
  13. I was going to say that It leaves a residue of sugars and hops. But that is too obvious. Wouldn't the physical contact resolve this...the prongs will touch where they touch, enough for conductivity?
  14. Seems harsh for a garage. sometimes this can be too cautious. how far away are the trees and what type??
  15. not unless there is something we don't know. Has it been asked for?
  16. I'm wondering if @twice round the block means trench footings. I've heard this described as pilings before (in error or as a local term, I don't know). Hence the query. Otherwise , just getting a rig on site will be a few £k, plus full SE design. dropped kerb and reconstruction of footpath/crossing might be about £3k. @ProDave please curb your use of this american term for kerb. I had to add kerb to the spellcheck dictionary. Twice, if you tell us more about the garage design, and ground conditions, then we can help you choose.
  17. What do you mean by piling? Tubes banged into the ground are expensive.
  18. Well you tried anyway. Joists fail in acceptable deflection before the breaking point. So you're OK.
  19. Yes it would. But the landowners and developers wouldn't make so much. They have influence on government. Also, if every plot was twice the size, the suburbs would increase dramatically. My LA had a plan for avoiding sprawl, ( terraces and flats instead of semis) but they couldn't enforce it.
  20. Try to stagger them high middle and low and not in horizontal lines. That way you are not putting g multiple screws in a single grain. I hope you tried jumping first, so that you can report back on the effect.
  21. OK. That is too big a deal to risk. You'll need a council approved contractor for the x-over.
  22. It varies dramatically by region. You really need to ask. My hunch is that the first job should be the dropped kerb, and there would be no argument. Quite expensive. An alternative might be preparing the driveway to the stage of hardcore, but you shouldn't drive over the existing kerb to do it. Plus they might think you are ignoring the kerb requirement. If I may ask, why haven't you proceeded with the project?
  23. That is a very strong solution, and best if using full sister timbers, but its sometimes tricky to drill the horizontal holes through both pieces.
  24. What's the going rate for nudura or similar £/m2? Very roughly will do. When you cut off the top, I assume the cut bit is waste (you cant turn it over etc?)
×
×