A question !
As I had to raise my outside ‘floor’ by 50mm so my internal floor will raise .
Currently doorway openings are lower . Do I need to raise them ? I.e can I let the screed ‘run’ from one room to the other - or should each room be screeded individually - so screed doesn’t run across doorway