Right !
SIG guy recommended roofer .
Roofer guy recommended guy to screed a fall .
The screed has been done ; I can’t walk on it but looks to be a proper job .
Problem is 1 up stand in particular is low - real low .
Maybe just 20mm above the screed .
Bearing in mind hot bitumen has to go ontop the screed so the upstand will be even lower .
I know upstands are meant to be a min of 150mm but that was always impossible in this situation .
I could timber across all the upstands to raise them before the bitumen .
But then I’ll be much higher than the house damp course and much higher than the street entrance way . ?
Trying to think how to make a ‘feature ‘ out of a raised corner ( stilted tiles sitting around glazing ) . Or just not worry - see what happens .
The screed does look spot on fall wise so perhaps it’s less of an issue than I imagine .
Just when it’s meant to be 150mm and I will struggle to get 15mm I worry .