-
Posts
14055 -
Joined
-
Last visited
-
Days Won
29
Everything posted by Pocster
-
F me ! You’ve done 6 months work in 1 day in my world ! 👍👍👍
-
How to hide manhole covers in garden
Pocster replied to puntloos's topic in Landscaping, Decking & Patios
Naked girls over an access chamber tends to ‘draw’ the eye …. -
How to hide manhole covers in garden
Pocster replied to puntloos's topic in Landscaping, Decking & Patios
Build a house on top of them 😁😎👍 -
🙄🙄🙄🙄👍 oh ! Do you mean male / female ? Or electrocuted during sex ??
-
Company were back out today for the 2nd survey ( I had to do some shuttering after the 1st one ). All good. Will get my metal fixing of stairs to RSJ. Also they will 'infill' the steel beam to suit their needs ( which I prefer ). Regarding hand rail at base of steps ; usually max steps with no hand rail is 2 ( though apparently the width of the step is relevant ). Final fix plans to be posted once I have them.
-
Maybe. I only uploaded the design for @Thorfun too see; which I've only JUST received. I can't send to bc without the design which I've only just received!. I have NOT spent 30k. I can only send things to anyone ONCE I've received them.
-
No one in this thread advised anything of the sort . The company state in their blurb all their staircases meet bc requirements 100% - so imho that’s them accepting liability for that . None the less I emailed them ; they suggested I could email this draft to bc anyway and follow it up with the final proposal just for peace of mind . Whilst ‘proper’ bco should check these things on my build ( 5 yrs of fighting remember) it’s fairly obvious I pissed planning / bc and neighbors off . I assumed someone would want to inspect the insulation . Not interested. In theory I could have installed zero insulation and no one would know ( I did take photos ! ) .
-
Not quite sure what you mean here ? The company take responsibility in the design to meet bc requirements. Equally not spent 30k - that happens after install . These are the the 1st draft of the plans - not final
-
They are ‘involved ‘ in that they turned up a few times go “ yeah “ and leave . You think a hand rail on the base steps to the left is required ?
-
Enjoy the next decade 💪👍
-
You’ve been very quiet for 10 yrs then - unlike me 😎
-
I think that’s pretty smart ! . When’s it due to finish ? ; want too see photos of that please
-
Lol The first post had the company name in it - I decided to edit that . Contrary to popular belief I don’t want buildhub getting into trouble ! The only fixing ( point of contention at the moment ) is just a fixing to the rsj on the top tread . So not fixed to the wall ( can’t be ! ) and not fixed to the floor ( can’t be ! )
-
It cost more than 25 quid
-
-
I use ovaeda.com Similar type of things . The price of these can add up especially if you add metal supports , brackets , screws - all the ‘special ‘ bits .
-
-
Cooooorrrrr you finished that quick ! ✊
-
Errrrmmmm a d o o r 👍
-
£1000000000000000 (expletive deleted)ing quid it does
-
😁 water over floor water over toilet
-
Door = good No door = (expletive deleted)ing water everywhere
-
I did say . Water everywhere- but he wouldn’t listen …. .
-
That’s a no I think …..
-
A fair tactic . Let’s hope she thinks the same when it’s not finished in 3 yrs . She’s lying in bed next to you as you are fast asleep and she looks at the knife .
