Thorfun
Members-
Posts
4889 -
Joined
-
Last visited
-
Days Won
36
Everything posted by Thorfun
-
I'm not as knowledgable about this stuff as those already commented but if you're going back to the drawing board can you not design it with an insulated slab? that way you can sit the cassette on top of the slab as recommended and have loads of EPS insulation below ground to reduce thermal bridging. unless I've completely got the wrong end of the stick here of course.
-
Battery Storage installed
Thorfun commented on MikeGrahamT21's blog entry in Back on the self-build waggon...
I disagree with this at current prices. I have been quoted £9500+VAT for a PW2 installed. if we ignore VAT as I'm a new build that would be £703/kWh. And with a system like @MikeGrahamT21's (and what I'm considering) the price per kWh gets cheaper with the more storage you add as quite a bit of the cost is the inverter. so if he adds the US2000C adding 2.4kWh to his storage array his £/kWh goes down to £542. it's why I can't justify a PW2 at the moment. oh....and the 9 month lead time on the PW2 units! -
and Isover Batts from Jewsons. I got a good price on my 32 batts when compared to Knauff stuff.
-
yes, it was slow (although not as slow as I thought it'd be after reading your experiences!) and very dusty (which isn't really an issue for me as I'm in the dungeon and nothing else is down there) but wasn't that bad at all. I managed to do 10 holes today and have another 9 to do tomorrow. I could've easily done it all today but I also have a day job that takes up most of my time! I'm going through dense concrete blocks and used a Screwfix/Erbauer 107mm diamond core drill bit (https://www.screwfix.com/p/erbauer-diamond-core-drill-bit-107mm/1121v). what was it you were core drilling again?
-
Sequence (flooring, kitchen units, decorating etc)
Thorfun replied to WWilts's topic in General Construction Issues
now that makes more sense. 🙂 -
Sequence (flooring, kitchen units, decorating etc)
Thorfun replied to WWilts's topic in General Construction Issues
probably not so bad with LVT but in our last house (new build by a mass builder) we had tiles which were obviously laid after the kitchen went in and when I had to get the dishwasher out from under the worktop I couldn't do it as the tiles were so high the feet would retract enough to get the dishwasher out! ever since then I have decided that I will take the extra cost hit and tile under the units. -
look forward to reading it thanks. 🙂
-
I'd be more concerned about the water pressure lifting up the house than water ingress! but I'm not a structural engineer or an engineer of any kind but I do know that I have an external sump and pump with a land drain around the base of my basement and there is a constant run of water (and it's above the water table!!) where water runs beneath the surrounding rock 2m below ground level. I'd hate to know what would happen if I let all that water build up with the upward pressure on the basement and house above. I'm sure more intelligent people will be along soon.
-
me neither. you need a structural engineer to sign off on that
-
doesn't digging down to just have a void increase the costs? why not dig down to the basement floor level and then dig the pool area out a bit further? seems counter intuitive to do it the way you suggest and more costly! not only the increased depth but then also paying for block and beam flooring and supporting walls etc. seems crazy to me. Also, you'll need some form of sump and pump to pump out water from around the basement.
-
we have built a basement and put 200mm EPS 300 underneath it and others, like @Bitpipe put 300mm under the basement slab. just do it and I agree that you might have issues with SAP and building regs if you don't put any insulation underneath. I note that you don't mention what type of insulation the architect has specified but it's my understanding that PIR won't have the compressive strength which is why our structural engineer specified EPS300 for under the slab. if it's EPS then I would up it to 200mm minimum in my opinion.
-
our local Groundworker dug a big hole and then outsourced the basement build to McGuinness Brothers Construction based in Luton who did a very good job.
- 19 replies
-
- sheet piling
- ground investigation
- (and 13 more)
-
and, if aesthetics are important to you, it looks a lot nicer.
-
I have my G99 application and the battery was included in it so I’m good to go I think. But will double check everything
-
this one https://www.jewson.co.uk/p/hand-held-diamond-drill-JTH3063A has a built in water feed. I could just hire it for a week, stick it on my account and be done with it. thanks for all the answers, I'll have a think about it all and work something out. going to leave this job until next week now as well so I'm not rushing to do it.
-
phew! that's what I thought and I'm restricted by my 10kW Solaredge Inverter that the array is connected to and we have permission for and then the batteries will be on the house side of the islanding.
-
I've asked my M&E consultants if they included the originally planned PW2 with the DNO application for PV and am waiting to see what they say. I'm not going the Tesla route anymore but will, most likely, be using a Lux Power AC coupled inverter so that will island the home/battery supply as I understand it. I guess the problem is that I will be using my local friendly sparkie to do the install and not a battery installer. I'm sure I'll figure it out!